Abraj Al AzlContracting
Call العربية
Black bitumen membrane laid on a floor around two pipe stubs

Bitumen bathroom waterproofing in Al Bahar (near Al Khobar)

Bitumen beneath the tiles

Bitumen waterproofing for bathroom floors and wall bases, before screed and tiling

+966 54 311 2066
The service in your area

Bitumen bathroom waterproofing in Al Bahar (near Al Khobar)

Bitumen bathroom waterproofing in Al Bahar begins with photos and details sent by call or WhatsApp. The district mixes villas and apartment buildings, where bathrooms face coastal moisture and may show leaks from old pipes or cracked grout.

Bathrooms in Al Bahar face constant coastal moisture, and their piping is often old. Bitumen creates a strong water barrier protecting concrete and walls from steady damp, especially around pipe areas and joints. Photos reveal where leaks occur and which areas need extra treatment before screed and tiles are laid.

  • Al Bahar is a residential district near Ar Rakah Al Janubiyah, As Sadafah and Ar Rawabi in Hofuf in the Eastern Province.
  • Coastal moisture speeds the decay of grout and tiles, so a bitumen barrier protects against early leaks.
What the service includes

The main items of bitumen bathroom waterproofing in Al Bahar (near Al Khobar)

  • Checking the concrete floor and wall bases and identifying cracks
  • Applying bitumen layers over the floor including the shower area
  • Closing the waterproofing around drain openings and pipe entries
  • Confirming full drying before the screed is poured
How we work

How we carry out bitumen bathroom waterproofing in Al Bahar (near Al Khobar)

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.

2

Prepare the surface

The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.

3

Apply the bitumen

Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.

4

Screed, then tile

Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.

What sets us apart

Why Abraj Al Azl?

A continuous barrier with no gapsBitumen covers corners, pipe entries and drain openings in one unbroken layer, leaving no exposed point.

Al Bahar (near Al Khobar) is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

Start from Al Bahar (near Al Khobar) with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Before you book bitumen bathroom waterproofing in Al Bahar (near Al Khobar)

Does an old bathroom in Al Bahar need waterproofing before repair?

Yes, especially if damp patches or grout cracks show. Photos reveal the structure's condition, and we may need to treat leaks first, then apply fresh bitumen before new tiles.

Does bitumen stop leaks from under the bathroom floor?

Bitumen stops water seeping to layers below when properly applied before screed. If leaks already come from pipes, we treat the source first; photos help us identify this.

How do I know the bathroom was not properly waterproofed before?

Signs include damp on the ceiling of the room below, cracking render at the wall bases, tiles lifting at the floor edge or a persistent damp smell. All of these mean water has got through a layer under the tiles. Send us photos to identify where the problem starts.

What decides the cost of bitumen waterproofing for a bathroom?

The floor area and the height the layer turns up the walls, how many pipe entries and drain openings need sealing, the condition of the concrete floor, and whether cracks must be treated first. Send photos and rough dimensions on WhatsApp and we will explain what the work covers.

Does the bathroom need ventilation while bitumen is applied?

Yes. Bitumen gives off fumes during application and while it dries. Windows and doors should be open and any extraction fan running to bring in fresh air. This is why the neighbouring space should be cleared during the work and until the coating has hardened.

Is Al Bahar (near Al Khobar) within your service area?

Yes, Al Bahar (near Al Khobar) is one of the areas we work in, as are Ar Rakah Al Janubiyah, As Sadafah (near Al Khobar) and Ar Rawabi (near Al Khobar). To start, call us or message us on WhatsApp.

Nearby areas

Bitumen bathroom waterproofing near Al Bahar (near Al Khobar)

If the site is outside Al Bahar (near Al Khobar), the same service is available in Ar Rakah Al Janubiyah, As Sadafah (near Al Khobar) and Ar Rawabi (near Al Khobar).

Other services in the area

More services in Al Bahar (near Al Khobar)

Pool at night with water jets after waterproofing

Bitumen bathroom waterproofing in Al Bahar (near Al Khobar)?
Call us now

Call us or send photos of the floor, the pipe entries and the wall bases on WhatsApp, and we take it from there.

+966 54 311 2066
Call nowWhatsApp