Abraj Al AzlContracting
Call العربية
Black bitumen membrane laid on a floor around two pipe stubs

Bitumen bathroom waterproofing in Al Badi (near Al Awjam)

Bitumen beneath the tiles

Bitumen waterproofing for bathroom floors and wall bases, before screed and tiling

+966 54 311 2066
The service in your area

Bitumen bathroom waterproofing in Al Badi (near Al Awjam)

We serve Al Badi with bitumen bathroom waterproofing, starting with photos of the bathroom floor and wall bases sent by call or WhatsApp. The district has scattered houses and residential blocks, and this layer goes down before the screed and tiling.

Al Badi has houses and villas of varying sizes, with bathrooms sometimes on the ground floor and sometimes upstairs. Older tiling cracks at corners and around drain openings, and water can seep through these joints. The bathroom's position and floor type decide the method of application, which the photos make clear before work begins.

  • Al Badi is a district in Al-Ahsa Governorate in the Eastern Province, lying close to Al Badiah and Al Awjam.
  • Ground-floor and upper-floor bathrooms are treated in the same way, but where a leak shows up differs between them.
What the service includes

What we do for you in Al Badi (near Al Awjam)

  • Checking the concrete floor and wall bases and identifying cracks
  • Confirming full drying before the screed is poured
  • Closing the waterproofing around drain openings and pipe entries
  • Cleaning the surface and treating cracks and corners before application
How we work

How we carry out bitumen bathroom waterproofing in Al Badi (near Al Awjam)

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.

2

Prepare the surface

The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.

3

Apply the bitumen

Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.

4

Screed, then tile

Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.

What sets us apart

Why Abraj Al Azl?

A continuous barrier with no gapsBitumen covers corners, pipe entries and drain openings in one unbroken layer, leaving no exposed point.

Start from Al Badi (near Al Awjam) with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

We serve Al Badi (near Al Awjam) and around itIncluding Al Badiah, Al Awjam and Al Aujam, as part of our work across the Eastern Province.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Common questions on bitumen bathroom waterproofing in Al Badi (near Al Awjam)

Is bitumen waterproofing suitable for ground-floor bathrooms in Al Badi?

Yes, provided the concrete base is solid. The photos show whether the floor needs crack repair before application.

Where do leaks usually appear in Al Badi bathrooms?

Usually at corners, wall bases and around the drain, where tiling tends to crack over time. We check these spots first in the photos.

What decides the cost of bitumen waterproofing for a bathroom?

The floor area and the height the layer turns up the walls, how many pipe entries and drain openings need sealing, the condition of the concrete floor, and whether cracks must be treated first. Send photos and rough dimensions on WhatsApp and we will explain what the work covers.

Does the bathroom need ventilation while bitumen is applied?

Yes. Bitumen gives off fumes during application and while it dries. Windows and doors should be open and any extraction fan running to bring in fresh air. This is why the neighbouring space should be cleared during the work and until the coating has hardened.

Is bitumen right for bathroom walls as well as the floor?

Bitumen is applied to the floor and turned up the walls in the wet area, especially along the lower part of the walls around the shower zone. For the upper part of the walls a different membrane type may be preferred depending on the finish required.

What should I send you from Al Badi (near Al Awjam)?

Send clear photos of the spot and a short description of the problem on WhatsApp, mention that you are in Al Badi (near Al Awjam), and we will work out the next step with you.

Nearby areas

We also offer it in neighbouring areas

We also offer bitumen bathroom waterproofing in Al Badiah, Al Awjam and Al Aujam, among the closest areas to Al Badi (near Al Awjam).

Other services in the area

More services in Al Badi (near Al Awjam)

Pool at night with water jets after waterproofing

Bitumen bathroom waterproofing in Al Badi (near Al Awjam)?
Call us now

One number for calls and WhatsApp, and you talk to us directly.

+966 54 311 2066
Call nowWhatsApp