
Bitumen bathroom waterproofing in Al Aziziyah (near Sayhat)
Bitumen bathroom waterproofing in Al Aziziyah begins with your photos sent by call or WhatsApp. We seal the floor and base before screed and tiles, to stop water seeping to lower floors or foundations.
Al Aziziyah is a residential district with multi-storey buildings and modern villas, its bathrooms varied in size and age. A flat in new construction needs proper waterproofing before the screed is laid, while an old one may show damp around the bathroom affecting the next room. Bitumen covers the entire surface, especially corners and joints. Photos tell us whether old tiles must be removed or whether a new layer can go over them.
- Al Aziziyah is a district in the Eastern Province near Al Jawharah, Al Anud and Al Buhayrah, with modern apartment buildings and villas.
- A bathroom in a multi-storey building is prone to water leaks affecting flats below, so proper waterproofing is essential.
The bitumen bathroom waterproofing work in Al Aziziyah (near Sayhat)
- Applying bitumen layers over the floor including the shower area
- Turning the layer up the walls in the wet zone and sealing the corners
- Cleaning the surface and treating cracks and corners before application
- Checking the concrete floor and wall bases and identifying cracks
How we carry out bitumen bathroom waterproofing in Al Aziziyah (near Sayhat)
Send photos of the bathroom
On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.
Prepare the surface
The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.
Apply the bitumen
Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.
Screed, then tile
Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.
Why Abraj Al Azl?
Protecting the concrete slabWater that reaches the reinforcement begins to damage it slowly. Early waterproofing stops that process before it starts.
Bitumen bathroom waterproofing in Al Aziziyah (near Sayhat)We choose the method and the materials once we know the condition of the spot.
Start from Al Aziziyah (near Sayhat) with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.
We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.
Some of our work

















What our customers said
ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب
أفضل شركة عزل اسطح الفوم وخزانات المياه
اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم
Real Google reviews, shown exactly as their authors wrote them.
What customers ask in Al Aziziyah (near Sayhat)
Can a bathroom in an Al Aziziyah flat be waterproofed without breaking all the old tiles?
It depends on the tile and floor condition. If the floor is sound and tiles are fixed, a new layer can be built on top. Photos show the state and help us choose the best option.
How many times should a bathroom be waterproofed in a new building in Al Aziziyah?
Once before tiling, if done properly. Strong bitumen waterproofing lasts long if undamaged. If damp appears later we assess the case with you from photos.
What decides the cost of bitumen waterproofing for a bathroom?
The floor area and the height the layer turns up the walls, how many pipe entries and drain openings need sealing, the condition of the concrete floor, and whether cracks must be treated first. Send photos and rough dimensions on WhatsApp and we will explain what the work covers.
What should I send you from Al Aziziyah (near Sayhat)?
Send clear photos of the spot and a short description of the problem on WhatsApp, mention that you are in Al Aziziyah (near Sayhat), and we will work out the next step with you.
Is bitumen right for bathroom walls as well as the floor?
Bitumen is applied to the floor and turned up the walls in the wet area, especially along the lower part of the walls around the shower zone. For the upper part of the walls a different membrane type may be preferred depending on the finish required.
What is the difference between a bitumen coating and bitumen roll membrane in a bathroom?
Liquid bitumen is brushed or rolled on and reaches tight corners easily. Bitumen roll membrane is bonded to the surface by heat or adhesive and gives a firmer layer. The choice between the two depends on the floor condition, the size of the bathroom and how much water it sees. Send photos and we will advise.
The same service in nearby areas
We also work near Al Aziziyah (near Sayhat), in Al Jawharah (near Sayhat), Al Anud and Al Buhayrah (near Sayhat).
More services in Al Aziziyah (near Sayhat)




