Abraj Al AzlContracting
Call العربية
Black bitumen membrane laid on a floor around two pipe stubs

Bitumen bathroom waterproofing in Al Asimah District

Bitumen beneath the tiles

Bitumen waterproofing for bathroom floors and wall bases, before screed and tiling

+966 54 311 2066
The service in your area

Bitumen bathroom waterproofing in Al Asimah District

Bitumen bathroom waterproofing in Al Asimah District begins when you send a photo by call or WhatsApp. The district has modern apartment blocks and villas, each with bathrooms that need a tight bitumen layer before final construction.

The area has relatively modern building and bathrooms of varied shapes and sizes. Modern bathrooms may be open-plan or divided, and each design requires careful bitumen laying on the floor and lower walls before tiling. Seasonal water and high summer humidity make good waterproofing essential to protect the building inside. Photos show the bathroom's size, shape and construction stage so we can choose the best method.

  • Al Asimah District is a residential area in Hofuf, Eastern Province, near Al Jawharah District and Al Muhandisin District.
  • Bathrooms with large floors and multiple pipe runs need a continuous bitumen spread with no gaps.
What the service includes

The main items of bitumen bathroom waterproofing in Al Asimah District

  • Closing the waterproofing around drain openings and pipe entries
  • Checking the concrete floor and wall bases and identifying cracks
  • Cleaning the surface and treating cracks and corners before application
  • Applying bitumen layers over the floor including the shower area
How we work

The steps of bitumen bathroom waterproofing in Al Asimah District

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.

2

Prepare the surface

The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.

3

Apply the bitumen

Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.

4

Screed, then tile

Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.

What sets us apart

Why Abraj Al Azl?

A continuous barrier with no gapsBitumen covers corners, pipe entries and drain openings in one unbroken layer, leaving no exposed point.

Start from Al Asimah District with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

Your request from Al Asimah District comes to usCall or WhatsApp on one number, and we answer you ourselves.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

Real Google reviews, shown exactly as their authors wrote them.

Questions

What customers ask in Al Asimah District

Can bitumen be laid on a wet or damp floor?

No, the floor must be dry before bitumen is applied. If it is damp, we need to dry it first or treat the moisture. Send a photo and we will tell you if drying is needed.

Does bitumen protect against leaks from the bathroom below?

Yes, bitumen stops water from leaking through the floor to the level below. But protection depends on correct application and full coverage of the entire floor and joints. Photos show whether earlier waterproofing is enough or not.

How do I request bitumen bathroom waterproofing in Al Asimah District?

Call us, or send clear photos of the spot and its location in Al Asimah District on WhatsApp, and we will work out the next step with you.

What is the difference between a bitumen coating and bitumen roll membrane in a bathroom?

Liquid bitumen is brushed or rolled on and reaches tight corners easily. Bitumen roll membrane is bonded to the surface by heat or adhesive and gives a firmer layer. The choice between the two depends on the floor condition, the size of the bathroom and how much water it sees. Send photos and we will advise.

Why does bitumen need screed over it before tiling?

Bitumen is a flexible layer and not firm enough to take tile adhesive directly. Screed protects it from puncture and pressure during and after tiling, and spreads the load over the waterproof layer so it stays intact.

How do I know the bathroom was not properly waterproofed before?

Signs include damp on the ceiling of the room below, cracking render at the wall bases, tiles lifting at the floor edge or a persistent damp smell. All of these mean water has got through a layer under the tiles. Send us photos to identify where the problem starts.

Nearby areas

We also offer it in neighbouring areas

We also work near Al Asimah District, in Al Jawharah District, Al Hamra Third District and Al Muhandisin District.

Other services in the area

More services in Al Asimah District

Pool at night with water jets after waterproofing

Bitumen bathroom waterproofing in Al Asimah District?
Call us now

One number for calls and WhatsApp, and you talk to us directly.

+966 54 311 2066
Call nowWhatsApp