Abraj Al AzlContracting
Call العربية
Black bitumen membrane laid on a floor around two pipe stubs

Bitumen bathroom waterproofing in Al Adhiriyah

Bitumen beneath the tiles

Bitumen waterproofing for bathroom floors and wall bases, before screed and tiling

+966 54 311 2066
The service in your area

Bitumen bathroom waterproofing in Al Adhiriyah

We waterproof bathrooms with bitumen in Al Adhiriyah, and we begin with photos of the floor and wall bases sent by call or WhatsApp. The village is near Ar Rayaan, Eshbilya and Al Kawthar, and it is dominated by mid-sized family homes.

Homes in Al Adhiriyah tend to be mid-sized buildings with several bathrooms, mostly on the first and second floors. The trouble recurs where the bathroom floor meets the wall and around drain openings, where water collects after frequent use. Bitumen is placed at these points before screed and tiles, and the photos determine the scope.

  • Al Adhiriyah is a village in the Al-Ahsa governorate of the Eastern Province, close to Ar Rayaan and Eshbilya.
  • With several bathrooms in one building, daily water use makes joints collect moisture faster than surfaces do.
What the service includes

What we do for you in Al Adhiriyah

  • Closing the waterproofing around drain openings and pipe entries
  • Confirming full drying before the screed is poured
  • Turning the layer up the walls in the wet zone and sealing the corners
  • Cleaning the surface and treating cracks and corners before application
How we work

How we carry out bitumen bathroom waterproofing in Al Adhiriyah

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.

2

Prepare the surface

The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.

3

Apply the bitumen

Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.

4

Screed, then tile

Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.

What sets us apart

Why Abraj Al Azl?

A continuous barrier with no gapsBitumen covers corners, pipe entries and drain openings in one unbroken layer, leaving no exposed point.

Start from Al Adhiriyah with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

Your request from Al Adhiriyah comes to usCall or WhatsApp on one number, and we answer you ourselves.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Before you book bitumen bathroom waterproofing in Al Adhiriyah

What is treated first in an old bathroom in Al Adhiriyah?

Joints and cracks at the wall base and around the drain are sealed first, then bitumen goes on the floor. The photos set the correct order for each bathroom.

Can one bathroom in a house be waterproofed without the others?

Yes, we can work on the single bathroom where the leak shows. Send photos of that bathroom so we can set the scope.

Does the bathroom need ventilation while bitumen is applied?

Yes. Bitumen gives off fumes during application and while it dries. Windows and doors should be open and any extraction fan running to bring in fresh air. This is why the neighbouring space should be cleared during the work and until the coating has hardened.

Why does bitumen need screed over it before tiling?

Bitumen is a flexible layer and not firm enough to take tile adhesive directly. Screed protects it from puncture and pressure during and after tiling, and spreads the load over the waterproof layer so it stays intact.

Do you offer bitumen bathroom waterproofing in Al Adhiriyah?

Yes. Al Adhiriyah is within our service area in the Eastern Province, and we also work in Ar Rayaan (near Al Adhiriyah), Eshbilya and Al Kawthar (near Ar Rafiah). Call us or send photos of the spot on WhatsApp.

What decides the cost of bitumen waterproofing for a bathroom?

The floor area and the height the layer turns up the walls, how many pipe entries and drain openings need sealing, the condition of the concrete floor, and whether cracks must be treated first. Send photos and rough dimensions on WhatsApp and we will explain what the work covers.

Nearby areas

We also offer it in neighbouring areas

We also offer bitumen bathroom waterproofing in Ar Rayaan (near Al Adhiriyah), Eshbilya and Al Kawthar (near Ar Rafiah), among the closest areas to Al Adhiriyah.

Other services in the area

More services in Al Adhiriyah

Pool at night with water jets after waterproofing

Your first step in Al Adhiriyah:
a call or a WhatsApp message

Call us, or send photos of the spot and a short description of the problem on WhatsApp.

+966 54 311 2066
Call nowWhatsApp