Abraj Al AzlContracting
Call العربية
Black bitumen membrane laid on a floor around two pipe stubs

Bitumen bathroom waterproofing in Al Adamah

Bitumen beneath the tiles

Bitumen waterproofing for bathroom floors and wall bases, before screed and tiling

+966 54 311 2066
The service in your area

Bitumen bathroom waterproofing in Al Adamah

Bitumen bathroom waterproofing in Al Adamah begins with a WhatsApp message holding photos of the floor, lower walls and pipes. The area has detached villas and low-rise residential buildings, many needing waterproofing before new tiling. Bitumen is a protective layer laid before sand and tiles.

A bathroom in a villa or building in Al Adamah may show damp or leaks around pipes or in corners, especially in older bathrooms. Bitumen lies on raw concrete and covers the base and lower walls before sand lining. Each bathroom differs by size and where its outlets and pipes are; photos make this clear.

  • Al Adamah is a district in the Eastern Province, near Dammam, As Suq and Al Qazaz, with villas and residential buildings.
  • Wet concrete or damp round bathroom pipes means the old bitumen has worn or was incomplete.
What the service includes

What we do for you in Al Adamah

  • Confirming full drying before the screed is poured
  • Applying bitumen layers over the floor including the shower area
  • Checking the concrete floor and wall bases and identifying cracks
  • Cleaning the surface and treating cracks and corners before application
How we work

The steps of bitumen bathroom waterproofing in Al Adamah

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.

2

Prepare the surface

The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.

3

Apply the bitumen

Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.

4

Screed, then tile

Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.

What sets us apart

Why Abraj Al Azl?

Protecting the concrete slabWater that reaches the reinforcement begins to damage it slowly. Early waterproofing stops that process before it starts.

Al Adamah is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

We serve Al Adamah and around itIncluding Dammam, As Suq and Al Qazaz, as part of our work across the Eastern Province.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

Real Google reviews, shown exactly as their authors wrote them.

Questions

Questions about bitumen bathroom waterproofing in Al Adamah

Must old bitumen be removed before new bitumen is applied?

If the old bitumen is sound and stuck, removal may not be needed. But if cracked or loose, the surface must be cleaned first. Photos help us judge the condition of the old layer.

Does coastal humidity in Al Adamah cause bathrooms to need waterproofing?

Coastal humidity raises the risk of damp and leaks, especially in poorly ventilated spaces. Good bitumen waterproofing stops water entering the structures. Send bathroom photos so we can assess the situation.

How do I know the bathroom was not properly waterproofed before?

Signs include damp on the ceiling of the room below, cracking render at the wall bases, tiles lifting at the floor edge or a persistent damp smell. All of these mean water has got through a layer under the tiles. Send us photos to identify where the problem starts.

Do you offer bitumen bathroom waterproofing in Al Adamah?

Yes. Al Adamah is within our service area in the Eastern Province, and we also work in Dammam, As Suq and Al Qazaz. Call us or send photos of the spot on WhatsApp.

What is the difference between a bitumen coating and bitumen roll membrane in a bathroom?

Liquid bitumen is brushed or rolled on and reaches tight corners easily. Bitumen roll membrane is bonded to the surface by heat or adhesive and gives a firmer layer. The choice between the two depends on the floor condition, the size of the bathroom and how much water it sees. Send photos and we will advise.

Is bitumen right for bathroom walls as well as the floor?

Bitumen is applied to the floor and turned up the walls in the wet area, especially along the lower part of the walls around the shower zone. For the upper part of the walls a different membrane type may be preferred depending on the finish required.

Nearby areas

Bitumen bathroom waterproofing near Al Adamah

Nearby areas we also cover: Dammam, As Suq and Al Qazaz.

Other services in the area

More services in Al Adamah

Pool at night with water jets after waterproofing

Your first step in Al Adamah:
a call or a WhatsApp message

Describe the problem and where it is in Al Adamah, and we will tell you the right next step.

+966 54 311 2066
Call nowWhatsApp