Abraj Al AzlContracting
Call العربية
Black bitumen membrane laid on a floor around two pipe stubs

Bitumen bathroom waterproofing in Ad Dughaymiyah

Bitumen beneath the tiles

Bitumen waterproofing for bathroom floors and wall bases, before screed and tiling

+966 54 311 2066
The service in your area

Bitumen bathroom waterproofing in Ad Dughaymiyah

Bitumen bathroom waterproofing in Ad Dughaymiyah starts with photos of the floor and wall bases, sent by call or WhatsApp. Ad Dughaymiyah is a small village of spaced-out homes and farms, and its house bathrooms vary in age and design.

Homes in the village generally stand on spaced-out plots, and the bathroom may sit on the ground floor or in a separate annex away from the main house. In these cases damp usually comes from the surrounding ground, showing at the wall bases and around drains. Because bathrooms differ widely, the photos alone reveal the floor's condition and whether it needs preparing before the bitumen is applied.

  • Ad Dughaymiyah is a village in Al-Ahsa in the Eastern Province, lying close to Al Faqah, Al Jawiyah and Ishbiliyah.
  • A bathroom in a separate annex is more exposed to ground damp, so its base is examined with care.
What the service includes

The scope of the work in Ad Dughaymiyah

  • Cleaning the surface and treating cracks and corners before application
  • Closing the waterproofing around drain openings and pipe entries
  • Applying bitumen layers over the floor including the shower area
  • Checking the concrete floor and wall bases and identifying cracks
How we work

The stages of the work in Ad Dughaymiyah

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.

2

Prepare the surface

The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.

3

Apply the bitumen

Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.

4

Screed, then tile

Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.

What sets us apart

Why Abraj Al Azl?

A continuous barrier with no gapsBitumen covers corners, pipe entries and drain openings in one unbroken layer, leaving no exposed point.

We serve Ad Dughaymiyah and around itIncluding Al Faqah, Al Jawiyah and Ishbiliyah (near Abqaiq), as part of our work across the Eastern Province.

Your request from Ad Dughaymiyah comes to usCall or WhatsApp on one number, and we answer you ourselves.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Your questions on bitumen bathroom waterproofing in Ad Dughaymiyah

Is a bathroom in a separate annex in Ad Dughaymiyah waterproofed?

Yes, and the annex's base and wall bases are checked first because ground damp is stronger there. Send photos of the floor and walls and tell us where the annex sits.

Do Ad Dughaymiyah bathrooms need the floor changed before waterproofing?

Not necessarily; the photos show whether the floor is firm. If it needs preparing we will tell you what it requires, without promising an outcome before checking.

Do you cover Ad Dughaymiyah?

Yes. We serve Ad Dughaymiyah and nearby areas such as Al Faqah, Al Jawiyah and Ishbiliyah (near Abqaiq), from our base in Al Uwaymiriyah, Hofuf. Start with a call or a WhatsApp message.

What is the difference between a bitumen coating and bitumen roll membrane in a bathroom?

Liquid bitumen is brushed or rolled on and reaches tight corners easily. Bitumen roll membrane is bonded to the surface by heat or adhesive and gives a firmer layer. The choice between the two depends on the floor condition, the size of the bathroom and how much water it sees. Send photos and we will advise.

Why does bitumen need screed over it before tiling?

Bitumen is a flexible layer and not firm enough to take tile adhesive directly. Screed protects it from puncture and pressure during and after tiling, and spreads the load over the waterproof layer so it stays intact.

Does the bathroom need ventilation while bitumen is applied?

Yes. Bitumen gives off fumes during application and while it dries. Windows and doors should be open and any extraction fan running to bring in fresh air. This is why the neighbouring space should be cleared during the work and until the coating has hardened.

Nearby areas

The same service in nearby areas

We also offer bitumen bathroom waterproofing in Al Faqah, Al Jawiyah and Ishbiliyah (near Abqaiq), among the closest areas to Ad Dughaymiyah.

Other services in the area

More services in Ad Dughaymiyah

Pool at night with water jets after waterproofing

Your first step in Ad Dughaymiyah:
a call or a WhatsApp message

Describe the problem and where it is in Ad Dughaymiyah, and we will tell you the right next step.

+966 54 311 2066
Call nowWhatsApp