Abraj Al AzlContracting
Call العربية
Black bitumen membrane laid on a floor around two pipe stubs

Bitumen bathroom waterproofing in Ad Dabab (near Dammam)

Bitumen beneath the tiles

Bitumen waterproofing for bathroom floors and wall bases, before screed and tiling

+966 54 311 2066
The service in your area

Bitumen bathroom waterproofing in Ad Dabab (near Dammam)

Bitumen bathroom waterproofing in Ad Dabab starts with photos of the floor and wall bases, sent by call or WhatsApp. The district has houses and villas of mixed ages, where bathrooms need protection before screed and tiling are laid.

Ad Dabab mixes older and newer houses, where bathroom floors are exposed to water every day. Bitumen is applied to the floor and wall base before screed, protecting against moisture seeping through to lower layers. Photos show the floor and wall condition and help determine whether there is old damage or a fresh preparation. Coastal humidity may increase the importance of this protection in buildings.

  • Ad Dabab is a district in the Eastern Province, near King Abdul Aziz Seaport and Al Mazruiyah, with houses, villas and workshops.
  • The bathroom in a house or villa exposes its floor and lower walls to water continuously, so bitumen protection is needed before any finishing.
What the service includes

The scope of the work in Ad Dabab (near Dammam)

  • Closing the waterproofing around drain openings and pipe entries
  • Checking the concrete floor and wall bases and identifying cracks
  • Cleaning the surface and treating cracks and corners before application
  • Turning the layer up the walls in the wet zone and sealing the corners
How we work

How we carry out bitumen bathroom waterproofing in Ad Dabab (near Dammam)

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.

2

Prepare the surface

The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.

3

Apply the bitumen

Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.

4

Screed, then tile

Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.

What sets us apart

Why Abraj Al Azl?

A continuous barrier with no gapsBitumen covers corners, pipe entries and drain openings in one unbroken layer, leaving no exposed point.

Ad Dabab (near Dammam) is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

Start from Ad Dabab (near Dammam) with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

Real Google reviews, shown exactly as their authors wrote them.

Questions

Questions about bitumen bathroom waterproofing in Ad Dabab (near Dammam)

Is bitumen applied before or after tiling in Ad Dabab?

Before tiling altogether. It is applied to the floor and lower walls, then screed goes on, and then tiles. Photos help us assess the surface before starting.

Do you treat old damp in bathrooms before new waterproofing?

Yes, if there are signs of damp or old damage, we treat those first then apply bitumen. Photos show what needs treatment and what is ready for direct waterproofing.

How do I know the bathroom was not properly waterproofed before?

Signs include damp on the ceiling of the room below, cracking render at the wall bases, tiles lifting at the floor edge or a persistent damp smell. All of these mean water has got through a layer under the tiles. Send us photos to identify where the problem starts.

What decides the cost of bitumen waterproofing for a bathroom?

The floor area and the height the layer turns up the walls, how many pipe entries and drain openings need sealing, the condition of the concrete floor, and whether cracks must be treated first. Send photos and rough dimensions on WhatsApp and we will explain what the work covers.

What is the difference between a bitumen coating and bitumen roll membrane in a bathroom?

Liquid bitumen is brushed or rolled on and reaches tight corners easily. Bitumen roll membrane is bonded to the surface by heat or adhesive and gives a firmer layer. The choice between the two depends on the floor condition, the size of the bathroom and how much water it sees. Send photos and we will advise.

How do I request bitumen bathroom waterproofing in Ad Dabab (near Dammam)?

Call us, or send clear photos of the spot and its location in Ad Dabab (near Dammam) on WhatsApp, and we will work out the next step with you.

Nearby areas

We also offer it in neighbouring areas

If the site is outside Ad Dabab (near Dammam), the same service is available in King Abdul Aziz Seaport, Al Mazruiyah and At Tubayshi.

Other services in the area

More services in Ad Dabab (near Dammam)

Pool at night with water jets after waterproofing

In Ad Dabab (near Dammam) and need bitumen bathroom waterproofing?
Send us photos of the spot

Call us, or send photos of the spot and a short description of the problem on WhatsApp.

+966 54 311 2066
Call nowWhatsApp