Abraj Al AzlContracting
Call العربية
Black bitumen membrane laid on a floor around two pipe stubs

Bitumen bathroom waterproofing in First Industrial (near Dammam)

Bitumen beneath the tiles

Bitumen waterproofing for bathroom floors and wall bases, before screed and tiling

+966 54 311 2066
The service in your area

Bitumen bathroom waterproofing in First Industrial (near Dammam)

We bitumen-waterproof bathrooms in First Industrial after reviewing photos of the floor and wall bases sent by call or WhatsApp. The area lies near Al Basatin, Al Muntazah and An Nahdah, and the floor is treated before the screed and tiles.

First Industrial mixes residential buildings with shops and worker housing, and bathrooms here vary in use and age. Heavily used bathrooms may show floor wear and cracked wall bases sooner than others. The bathroom is therefore checked carefully before the layer type is chosen, and the photos show whether the floor needs extra preparation.

  • First Industrial is an area in Dammam in the Eastern Province, next to Al Basatin, Al Muntazah and An Nahdah.
  • Heavily used bathrooms wear their floors and wall bases faster than others, so they need closer inspection.
What the service includes

The main items of bitumen bathroom waterproofing in First Industrial (near Dammam)

  • Checking the concrete floor and wall bases and identifying cracks
  • Turning the layer up the walls in the wet zone and sealing the corners
  • Closing the waterproofing around drain openings and pipe entries
  • Applying bitumen layers over the floor including the shower area
How we work

The stages of the work in First Industrial (near Dammam)

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.

2

Prepare the surface

The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.

3

Apply the bitumen

Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.

4

Screed, then tile

Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.

What sets us apart

Why Abraj Al Azl?

A continuous barrier with no gapsBitumen covers corners, pipe entries and drain openings in one unbroken layer, leaving no exposed point.

First Industrial (near Dammam) is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

Your request from First Industrial (near Dammam) comes to usCall or WhatsApp on one number, and we answer you ourselves.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

What customers ask in First Industrial (near Dammam)

Is bitumen suitable for shared-housing bathrooms in First Industrial?

It suits cases where the concrete floor is sound and free of oil and dust. The photos show the floor's condition and whether heavy cleaning is needed first.

What should I send to start bathroom waterproofing in First Industrial?

Send photos of the floor, wall bases and pipe points, with a short note on the bathroom's age and any leaks it has had. We will start the review from there.

Does the bathroom need ventilation while bitumen is applied?

Yes. Bitumen gives off fumes during application and while it dries. Windows and doors should be open and any extraction fan running to bring in fresh air. This is why the neighbouring space should be cleared during the work and until the coating has hardened.

How do I know the bathroom was not properly waterproofed before?

Signs include damp on the ceiling of the room below, cracking render at the wall bases, tiles lifting at the floor edge or a persistent damp smell. All of these mean water has got through a layer under the tiles. Send us photos to identify where the problem starts.

Is bitumen right for bathroom walls as well as the floor?

Bitumen is applied to the floor and turned up the walls in the wet area, especially along the lower part of the walls around the shower zone. For the upper part of the walls a different membrane type may be preferred depending on the finish required.

Is First Industrial (near Dammam) within your service area?

Yes, First Industrial (near Dammam) is one of the areas we work in, as are Al Basatin (near Dammam), Al Muntazah (near Dammam) and An Nahdah (near Dammam). To start, call us or message us on WhatsApp.

Nearby areas

The same service in nearby areas

We also offer bitumen bathroom waterproofing in Al Basatin (near Dammam), Al Muntazah (near Dammam) and An Nahdah (near Dammam), among the closest areas to First Industrial (near Dammam).

Other services in the area

More services in First Industrial (near Dammam)

Pool at night with water jets after waterproofing

We start with you in First Industrial (near Dammam)
with one call

One number for calls and WhatsApp, and you talk to us directly.

+966 54 311 2066
Call nowWhatsApp