Abraj Al AzlContracting
Call العربية
Screeded bathroom with a continuous grey membrane up the wall base

Bathroom waterproofing before tiling in Yanbu

Waterproof before you tile

A continuous waterproof membrane on the bathroom floor and wet-area walls, before adhesive and tiles go on

+966 54 311 2066
The service in your area

Bathroom waterproofing before tiling in Yanbu

Bathroom waterproofing before tiling in Yanbu starts with WhatsApp photos of the room and its dimensions. This waterproofing serves villas, houses and flats, laying a continuous waterproof membrane on the floor and wet walls before adhesive and tiles are applied.

Yanbu has newer villas alongside older apartment blocks, and each bathroom needs waterproofing suited to its design and drainage layout. Bathrooms exposed to high groundwater or near the Gulf face high humidity, and seepage from below can appear if the membrane is not laid carefully. Your photos show the floor condition, corners and joints, so we choose the right material and thickness to ensure water does not later seep through.

  • Yanbu is a district in the Eastern Province, near Ash Shati, Al Lualu and Al Huwaylat, with villas and residential homes.
  • Bathrooms near the coast or above high groundwater need a membrane that tolerates constant moisture without lifting from the concrete.
What the service includes

What the service covers in Yanbu

  • Forming and treating the floor-to-wall corners before the main layer
  • Sealing around the drain outlet, the door threshold and all pipe sleeves
  • Cleaning the surface, removing loose parts and treating hairline cracks
  • Checking the floor, the render, the corners, the drain outlet and pipe sleeves
How we work

The steps of bathroom waterproofing before tiling in Yanbu

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the walls, the drain outlet and the door threshold, so we can read the surface and decide the right material and treatment.

2

Prepare the surface

The floor and render are cleaned of dust and loose parts, hairline cracks, joints and corners are treated, and pipe sleeves and the drain outlet are sealed before anything else.

3

Apply the membrane

The layer covers the full floor, rises on the walls in the shower and basin area, is worked carefully into the corners and closes around the drain outlet and the door threshold. The material chosen depends on the surface and its condition.

4

Dry, then tiling begins

The membrane is left to dry and cure before tile adhesive and tiles go on, so it is not stressed or wetted from above before it is fully ready.

What sets us apart

Why Abraj Al Azl?

Corners and the drain get first attentionThe floor-to-wall corner and the area around the drain outlet are where most leaks begin, and these are treated carefully before the main layer goes on.

Yanbu is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

We serve Yanbu and around itIncluding Ash Shati (near Ghizlan), Al Lualu (near Ghizlan) and Al Huwaylat, as part of our work across the Eastern Province.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing
White insulated dome on a roof among the houses
White stepped dome on an insulated roof above a street

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

Real Google reviews, shown exactly as their authors wrote them.

Questions

What customers ask in Yanbu

Must the entire bathroom be waterproofed before tiling in Yanbu?

Yes, the entire floor and all wet walls must be waterproofed. Moisture seeps through tiny gaps, so a continuous membrane ensures water does not reach the layers beneath.

What thickness of waterproof membrane suits Yanbu bathrooms?

It depends on the floor condition, surrounding humidity and design. The photos tell us, so we choose the thickness that ensures lasting protection against damp and seepage.

Can the membrane go straight over the render?

It can, if the render is firm, clean and free of loose parts and cracks. If the render is weak or hollow it is removed or treated first, because the waterproof layer cannot compensate for an unsound surface beneath it.

How high up the wall does the membrane go?

It depends on the bathroom layout and where the showerhead and basin sit. In the shower area the layer rises to cover the full wet zone, and at the other walls it turns up a safe distance above the floor. We set the height after seeing the photos and the layout.

How is the corner between the floor and the wall sealed?

The corner is the most vulnerable point because it joins two surfaces at a right angle. It is filled and formed with a suitable compound before the waterproof layer is turned up over it, so the layer stays continuous rather than cracking at the bend.

What should I send you from Yanbu?

Send clear photos of the spot and a short description of the problem on WhatsApp, mention that you are in Yanbu, and we will work out the next step with you.

Nearby areas

Bathroom waterproofing before tiling near Yanbu

Nearby areas we also cover: Ash Shati (near Ghizlan), Al Lualu (near Ghizlan) and Al Huwaylat.

Other services in the area

More services in Yanbu

Worker applying the white insulation layer on a villa roof by the sea

Your first step in Yanbu:
a call or a WhatsApp message

Describe the problem and where it is in Yanbu, and we will tell you the right next step.

+966 54 311 2066
Call nowWhatsApp