Abraj Al AzlContracting
Call العربية
Screeded bathroom with a continuous grey membrane up the wall base

Bathroom waterproofing before tiling in Umm Ghawr

Waterproof before you tile

A continuous waterproof membrane on the bathroom floor and wet-area walls, before adhesive and tiles go on

+966 54 311 2066
The service in your area

Bathroom waterproofing before tiling in Umm Ghawr

We provide bathroom waterproofing in the village of Umm Ghawr before tiles are fixed, using a continuous membrane for the floor and the wet-area walls. Send photos of the bathroom by call or WhatsApp so we can plan the steps with you.

The village is made up mostly of private houses of one or two storeys, with bathrooms often added in stages, so floor build-ups rarely match. Older tiles may need removing before anything else, and the walls beside the shower take the most water, where photos can reveal possible leakage behind fittings. Summer heat and seasonal humidity make checking before tiling an essential step.

  • Umm Ghawr is a village in the Al-Ahsa governorate of the Eastern Province, close to Ar Rabiyah, Al Kawthar and Ar Rayaan.
  • Shower walls get wetter than any other surface, so they need membrane carried to a sufficient height.
What the service includes

The bathroom waterproofing before tiling work in Umm Ghawr

  • Applying the membrane over the full floor and up the walls in the wet zone
  • Forming and treating the floor-to-wall corners before the main layer
  • Checking the floor, the render, the corners, the drain outlet and pipe sleeves
  • Cleaning the surface, removing loose parts and treating hairline cracks
How we work

This is how we work in Umm Ghawr

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the walls, the drain outlet and the door threshold, so we can read the surface and decide the right material and treatment.

2

Prepare the surface

The floor and render are cleaned of dust and loose parts, hairline cracks, joints and corners are treated, and pipe sleeves and the drain outlet are sealed before anything else.

3

Apply the membrane

The layer covers the full floor, rises on the walls in the shower and basin area, is worked carefully into the corners and closes around the drain outlet and the door threshold. The material chosen depends on the surface and its condition.

4

Dry, then tiling begins

The membrane is left to dry and cure before tile adhesive and tiles go on, so it is not stressed or wetted from above before it is fully ready.

What sets us apart

Why Abraj Al Azl?

Corners and the drain get first attentionThe floor-to-wall corner and the area around the drain outlet are where most leaks begin, and these are treated carefully before the main layer goes on.

Start from Umm Ghawr with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

Your request from Umm Ghawr comes to usCall or WhatsApp on one number, and we answer you ourselves.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing
White insulated dome on a roof among the houses
White stepped dome on an insulated roof above a street

Customer reviews

What our customers said

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

Real Google reviews, shown exactly as their authors wrote them.

Questions

Before you book bathroom waterproofing before tiling in Umm Ghawr

Must old tiles be removed before bathroom waterproofing in Umm Ghawr?

It depends on the tiles and the layer beneath. If they are loose or hollow, removal is necessary; if they are firm, surface preparation may be enough, and the photos will show which applies.

Do you waterproof bathrooms in two-storey homes in Umm Ghawr?

Yes, we serve Umm Ghawr. Send photos of the bathroom and tell us which floor it is on, so we can judge whether the floor takes the membrane easily.

How is the corner between the floor and the wall sealed?

The corner is the most vulnerable point because it joins two surfaces at a right angle. It is filled and formed with a suitable compound before the waterproof layer is turned up over it, so the layer stays continuous rather than cracking at the bend.

What is the difference between a cementitious coating and a liquid membrane in a bathroom?

The cementitious coating bonds firmly to the concrete slab and the wall and suits flat regular surfaces. The liquid membrane is brushed on and follows corners and detailed areas easily. The choice between them depends on the surface and the bathroom layout, and we decide after seeing the photos.

Does the surface need to be completely dry before the membrane is applied?

Sufficient dryness is needed for good adhesion. Some materials tolerate a slightly damp surface while others need it fully dry. The surface is checked before work starts, and if visible moisture is present it is left long enough before the membrane is applied. We make this clear when the job is agreed.

What should I send you from Umm Ghawr?

Send clear photos of the spot and a short description of the problem on WhatsApp, mention that you are in Umm Ghawr, and we will work out the next step with you.

Nearby areas

The same service in nearby areas

We also work near Umm Ghawr, in Ar Rabiyah (near Umm Ghawr), Al Kawthar (near Ar Rafiah) and Ar Rayaan (near Al Adhiriyah).

Other services in the area

More services in Umm Ghawr

Worker applying the white insulation layer on a villa roof by the sea

Tell us about your site in Umm Ghawr
and we will plan the next step with you

One number for calls and WhatsApp, and you talk to us directly.

+966 54 311 2066
Call nowWhatsApp