Abraj Al AzlContracting
Call العربية
Screeded bathroom with a continuous grey membrane up the wall base

Bathroom waterproofing before tiling in Umm as Sahik

Waterproof before you tile

A continuous waterproof membrane on the bathroom floor and wet-area walls, before adhesive and tiles go on

+966 54 311 2066
The service in your area

Bathroom waterproofing before tiling in Umm as Sahik

Bathroom waterproofing before tiling in Umm as Sahik starts with WhatsApp photos of the floor, walls and pipes. The town has villas and small apartment blocks of varied ages, and bathroom conditions differ by the age of the building and its stage of completion.

Umm as Sahik is a town of villas and small apartment blocks of different ages. Older villas may need bathroom waterproofing renewed before re-tiling, while newer units in small apartment blocks may need basic waterproofing before first finishing. Floors may be uneven in older villas, walls differ in thickness, and drains sit in different places. Clear bathroom photos help us choose the right method for applying the waterproof membrane to the floor and wet-area walls.

  • Umm as Sahik is a town in the Eastern Province, near Al Rehab, Al Hazm and Al Budur, with villas and small apartment blocks.
  • Bathrooms in older villas and small apartment blocks may develop water leaks if the waterproofing before tiling is not thorough and precise.
What the service includes

The main items of bathroom waterproofing before tiling in Umm as Sahik

  • Applying the membrane over the full floor and up the walls in the wet zone
  • Sealing around the drain outlet, the door threshold and all pipe sleeves
  • Leaving the membrane to dry and cure before adhesive and tiling begin
  • Cleaning the surface, removing loose parts and treating hairline cracks
How we work

This is how we work in Umm as Sahik

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the walls, the drain outlet and the door threshold, so we can read the surface and decide the right material and treatment.

2

Prepare the surface

The floor and render are cleaned of dust and loose parts, hairline cracks, joints and corners are treated, and pipe sleeves and the drain outlet are sealed before anything else.

3

Apply the membrane

The layer covers the full floor, rises on the walls in the shower and basin area, is worked carefully into the corners and closes around the drain outlet and the door threshold. The material chosen depends on the surface and its condition.

4

Dry, then tiling begins

The membrane is left to dry and cure before tile adhesive and tiles go on, so it is not stressed or wetted from above before it is fully ready.

What sets us apart

Why Abraj Al Azl?

Sealed before it is closedOnce tiled, the membrane cannot be reached, so getting it right before tiling matters far more than any repair afterwards.

Start from Umm as Sahik with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

Bathroom waterproofing before tiling in Umm as SahikWe choose the method and the materials once we know the condition of the spot.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing
White insulated dome on a roof among the houses
White stepped dome on an insulated roof above a street

Customer reviews

What our customers said

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

Real Google reviews, shown exactly as their authors wrote them.

Questions

Common questions on bathroom waterproofing before tiling in Umm as Sahik

Do you re-waterproof an old bathroom in a villa before new tiling in Umm as Sahik?

Yes, we waterproof an old bathroom before new tiles go on. First we inspect the floor and walls from photos to check they are sound, then we remove the old tiles and previous seal and apply a new tight waterproof membrane.

How long does waterproofing a bathroom take in Umm as Sahik before tiling?

The time depends on the condition of the floor and walls, the size of the bathroom, and the number of pipes and drains. The photos you send help us estimate the time more accurately before work begins.

Do you offer bathroom waterproofing before tiling in Umm as Sahik?

Yes. Umm as Sahik is within our service area in the Eastern Province, and we also work in Al Rehab, Al Hazm (near Umm as Sahik) and Al Budur. Call us or send photos of the spot on WhatsApp.

What is the difference between a cementitious coating and a liquid membrane in a bathroom?

The cementitious coating bonds firmly to the concrete slab and the wall and suits flat regular surfaces. The liquid membrane is brushed on and follows corners and detailed areas easily. The choice between them depends on the surface and the bathroom layout, and we decide after seeing the photos.

How is the corner between the floor and the wall sealed?

The corner is the most vulnerable point because it joins two surfaces at a right angle. It is filled and formed with a suitable compound before the waterproof layer is turned up over it, so the layer stays continuous rather than cracking at the bend.

How high up the wall does the membrane go?

It depends on the bathroom layout and where the showerhead and basin sit. In the shower area the layer rises to cover the full wet zone, and at the other walls it turns up a safe distance above the floor. We set the height after seeing the photos and the layout.

Nearby areas

Bathroom waterproofing before tiling near Umm as Sahik

We also offer bathroom waterproofing before tiling in Al Rehab, Al Hazm (near Umm as Sahik) and Al Budur, among the closest areas to Umm as Sahik.

Other services in the area

More services in Umm as Sahik

Worker applying the white insulation layer on a villa roof by the sea

Your first step in Umm as Sahik:
a call or a WhatsApp message

Call us or send photos of the bathroom and the floor on WhatsApp, and we take it from there.

+966 54 311 2066
Call nowWhatsApp