Abraj Al AzlContracting
Call العربية
Screeded bathroom with a continuous grey membrane up the wall base

Bathroom waterproofing before tiling in Tarout

Waterproof before you tile

A continuous waterproof membrane on the bathroom floor and wet-area walls, before adhesive and tiles go on

+966 54 311 2066
The service in your area

Bathroom waterproofing before tiling in Tarout

Bathroom waterproofing before tiling in Tarout begins with photos sent by call or WhatsApp. The town is on an island and has both old and new villas and houses, where the bathroom needs a continuous waterproof membrane on floor and walls.

Tarout is a coastal town of mostly villas and closely built houses on small plots. The coastal location means air humidity and salt affect materials, and leaks appear faster than inland. Old bathrooms may have worn tiles and weak mortar, while new ones need strong membrane from first build. High coastal moisture makes waterproofing essential for the building's lifespan.

  • Tarout is a coastal town in the Eastern Province, with districts including Al Jabal, Al Nakhil and Ad Dirah.
  • Coastal homes face high humidity and salt in the air, speeding tile and mortar wear if the waterproof membrane is not strong.
What the service includes

The bathroom waterproofing before tiling work in Tarout

  • Sealing around the drain outlet, the door threshold and all pipe sleeves
  • Applying the membrane over the full floor and up the walls in the wet zone
  • Checking the floor, the render, the corners, the drain outlet and pipe sleeves
  • Cleaning the surface, removing loose parts and treating hairline cracks
How we work

The stages of the work in Tarout

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the walls, the drain outlet and the door threshold, so we can read the surface and decide the right material and treatment.

2

Prepare the surface

The floor and render are cleaned of dust and loose parts, hairline cracks, joints and corners are treated, and pipe sleeves and the drain outlet are sealed before anything else.

3

Apply the membrane

The layer covers the full floor, rises on the walls in the shower and basin area, is worked carefully into the corners and closes around the drain outlet and the door threshold. The material chosen depends on the surface and its condition.

4

Dry, then tiling begins

The membrane is left to dry and cure before tile adhesive and tiles go on, so it is not stressed or wetted from above before it is fully ready.

What sets us apart

Why Abraj Al Azl?

Sealed before it is closedOnce tiled, the membrane cannot be reached, so getting it right before tiling matters far more than any repair afterwards.

Tarout is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

We serve Tarout and around itIncluding Al Jabal, Al Nakhil (near Tarout) and Ad Dirah, as part of our work across the Eastern Province.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing
White insulated dome on a roof among the houses
White stepped dome on an insulated roof above a street

Customer reviews

What our customers said

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

Real Google reviews, shown exactly as their authors wrote them.

Questions

Common questions on bathroom waterproofing before tiling in Tarout

Does the waterproof membrane protect against salt in the coastal air?

The membrane protects the building under the tiles from water, reducing salt reaction with materials. But salt in outdoor air means periodic tile and mortar maintenance. A good membrane makes this less urgent.

Can an old bathroom in a coastal house be waterproofed without demolition?

If the tiles and mortar are sound, a new membrane can go on. But if tiles are crumbling or mortar is weak, they must be removed first. Photos show the current state and what is possible.

How is the corner between the floor and the wall sealed?

The corner is the most vulnerable point because it joins two surfaces at a right angle. It is filled and formed with a suitable compound before the waterproof layer is turned up over it, so the layer stays continuous rather than cracking at the bend.

What is the difference between a cementitious coating and a liquid membrane in a bathroom?

The cementitious coating bonds firmly to the concrete slab and the wall and suits flat regular surfaces. The liquid membrane is brushed on and follows corners and detailed areas easily. The choice between them depends on the surface and the bathroom layout, and we decide after seeing the photos.

What decides the cost of waterproofing a bathroom before tiling?

The floor area and how high the layer runs up the walls, the condition of the render, the number of cracks, corners and pipe sleeves, and the material that suits the surface. Send photos and rough dimensions on WhatsApp, tell us about the project, and we will explain the treatment needed.

Is Tarout within your service area?

Yes, Tarout is one of the areas we work in, as are Al Jabal, Al Nakhil (near Tarout) and Ad Dirah. To start, call us or message us on WhatsApp.

Nearby areas

We also offer it in neighbouring areas

If the site is outside Tarout, the same service is available in Al Jabal, Al Nakhil (near Tarout) and Ad Dirah.

Other services in the area

More services in Tarout

Worker applying the white insulation layer on a villa roof by the sea

In Tarout and need bathroom waterproofing before tiling?
Send us photos of the spot

Call us or send photos of the bathroom and the floor on WhatsApp, and we take it from there.

+966 54 311 2066
Call nowWhatsApp