Abraj Al AzlContracting
Call العربية
Screeded bathroom with a continuous grey membrane up the wall base

Bathroom waterproofing before tiling in Shari

Waterproof before you tile

A continuous waterproof membrane on the bathroom floor and wet-area walls, before adhesive and tiles go on

+966 54 311 2066
The service in your area

Bathroom waterproofing before tiling in Shari

Bathroom waterproofing before tiling in Shari begins with messages containing photos of the bathroom, area and walls sent by WhatsApp or call. The village has both older and newer houses with bathrooms in varied conditions, all needing a moisture-resistant membrane before tile and adhesive are installed.

Shari village has houses of varied age and design, with bathrooms some dating back years and others recently built. Older bathrooms may show visible damp or cracking around pipes, while new ones may need waterproofing before tiling starts. Water from showers penetrates cracks in tile and concrete without a waterproof barrier, causing damp in adjacent walls and foundations. The waterproofing layer is applied to the floor and water-facing walls just before tiling, with photos and measurements determining application method and suitable thickness.

  • Shari is a village in the Eastern Province close to Abu Koola and Salasil and Usayfirat, made up of scattered houses across open land.
  • A bathroom with both wet floor and walls needs comprehensive waterproofing covering all water-exposed areas to ensure water does not seep into layers beneath.
What the service includes

The scope of the work in Shari

  • Forming and treating the floor-to-wall corners before the main layer
  • Cleaning the surface, removing loose parts and treating hairline cracks
  • Leaving the membrane to dry and cure before adhesive and tiling begin
  • Sealing around the drain outlet, the door threshold and all pipe sleeves
How we work

The steps of bathroom waterproofing before tiling in Shari

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the walls, the drain outlet and the door threshold, so we can read the surface and decide the right material and treatment.

2

Prepare the surface

The floor and render are cleaned of dust and loose parts, hairline cracks, joints and corners are treated, and pipe sleeves and the drain outlet are sealed before anything else.

3

Apply the membrane

The layer covers the full floor, rises on the walls in the shower and basin area, is worked carefully into the corners and closes around the drain outlet and the door threshold. The material chosen depends on the surface and its condition.

4

Dry, then tiling begins

The membrane is left to dry and cure before tile adhesive and tiles go on, so it is not stressed or wetted from above before it is fully ready.

What sets us apart

Why Abraj Al Azl?

Sealed before it is closedOnce tiled, the membrane cannot be reached, so getting it right before tiling matters far more than any repair afterwards.

Start from Shari with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

We serve Shari and around itIncluding Abu Koola, Salasil and Usayfirat, as part of our work across the Eastern Province.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing
White insulated dome on a roof among the houses
White stepped dome on an insulated roof above a street

Customer reviews

What our customers said

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Before you book bathroom waterproofing before tiling in Shari

Should the whole bathroom be waterproofed or just certain areas?

All water-exposed areas must be waterproofed, including the floor and walls around the toilet, sink and shower. Photos show which areas need waterproofing and which may not be directly water-facing.

Does the waterproofing material suffer from the dry climate of villages in the Eastern Province?

The waterproofing material itself is not affected by dryness, but application requires certain conditions for proper adhesion and quality. Intense sun heat may affect drying speed and application, so it should be applied at the right time and in suitable conditions.

How is the corner between the floor and the wall sealed?

The corner is the most vulnerable point because it joins two surfaces at a right angle. It is filled and formed with a suitable compound before the waterproof layer is turned up over it, so the layer stays continuous rather than cracking at the bend.

What is the difference between a cementitious coating and a liquid membrane in a bathroom?

The cementitious coating bonds firmly to the concrete slab and the wall and suits flat regular surfaces. The liquid membrane is brushed on and follows corners and detailed areas easily. The choice between them depends on the surface and the bathroom layout, and we decide after seeing the photos.

Do you cover Shari?

Yes. We serve Shari and nearby areas such as Abu Koola, Salasil and Usayfirat, from our base in Al Uwaymiriyah, Hofuf. Start with a call or a WhatsApp message.

Does the surface need to be completely dry before the membrane is applied?

Sufficient dryness is needed for good adhesion. Some materials tolerate a slightly damp surface while others need it fully dry. The surface is checked before work starts, and if visible moisture is present it is left long enough before the membrane is applied. We make this clear when the job is agreed.

Nearby areas

We also offer it in neighbouring areas

We also offer bathroom waterproofing before tiling in Abu Koola, Salasil and Usayfirat, among the closest areas to Shari.

Other services in the area

More services in Shari

Worker applying the white insulation layer on a villa roof by the sea

In Shari and need bathroom waterproofing before tiling?
Send us photos of the spot

Call us or send photos of the bathroom and the floor on WhatsApp, and we take it from there.

+966 54 311 2066
Call nowWhatsApp