Abraj Al AzlContracting
Call العربية
Screeded bathroom with a continuous grey membrane up the wall base

Bathroom waterproofing before tiling in Nuayriyah

Waterproof before you tile

A continuous waterproof membrane on the bathroom floor and wet-area walls, before adhesive and tiles go on

+966 54 311 2066
The service in your area

Bathroom waterproofing before tiling in Nuayriyah

We offer bathroom waterproofing before tiling in Nuayriyah, applying a continuous membrane to the floor and wet-area walls before adhesive and tiles. Send bathroom photos by call or WhatsApp so we know what is needed.

Nuayriyah is a town of houses and small residential blocks, and many bathrooms there were tiled directly onto concrete some years ago. In these homes the usual entry point for damp is the junction between floor and wall, where water collects. The photos reveal the exposed joints before we decide how far the membrane should run.

  • Nuayriyah is a town in the Eastern Province, lying near Al Muhammadiyah, Al Faisaliyah and Al Aziziyah.
  • The floor-to-wall junction is the most exposed spot for leaks in older houses.
What the service includes

The main items of bathroom waterproofing before tiling in Nuayriyah

  • Cleaning the surface, removing loose parts and treating hairline cracks
  • Forming and treating the floor-to-wall corners before the main layer
  • Leaving the membrane to dry and cure before adhesive and tiling begin
  • Checking the floor, the render, the corners, the drain outlet and pipe sleeves
How we work

How we carry out bathroom waterproofing before tiling in Nuayriyah

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the walls, the drain outlet and the door threshold, so we can read the surface and decide the right material and treatment.

2

Prepare the surface

The floor and render are cleaned of dust and loose parts, hairline cracks, joints and corners are treated, and pipe sleeves and the drain outlet are sealed before anything else.

3

Apply the membrane

The layer covers the full floor, rises on the walls in the shower and basin area, is worked carefully into the corners and closes around the drain outlet and the door threshold. The material chosen depends on the surface and its condition.

4

Dry, then tiling begins

The membrane is left to dry and cure before tile adhesive and tiles go on, so it is not stressed or wetted from above before it is fully ready.

What sets us apart

Why Abraj Al Azl?

Corners and the drain get first attentionThe floor-to-wall corner and the area around the drain outlet are where most leaks begin, and these are treated carefully before the main layer goes on.

Nuayriyah is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

Start from Nuayriyah with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing
White insulated dome on a roof among the houses
White stepped dome on an insulated roof above a street

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

Real Google reviews, shown exactly as their authors wrote them.

Questions

Common questions on bathroom waterproofing before tiling in Nuayriyah

Do you waterproof both the floor and walls of a bathroom in Nuayriyah?

Usually yes, since water moves from the floor up the walls at the joints. The membrane runs up the wet-area walls to the proper height, which the photos help confirm.

Does existing tile have to come out to waterproof a bathroom in Nuayriyah?

Not always. If the tiles are firmly bonded they may be covered, while loose or hollow sections will be removed. The photos tell us which.

Does the surface need to be completely dry before the membrane is applied?

Sufficient dryness is needed for good adhesion. Some materials tolerate a slightly damp surface while others need it fully dry. The surface is checked before work starts, and if visible moisture is present it is left long enough before the membrane is applied. We make this clear when the job is agreed.

Can the membrane go straight over the render?

It can, if the render is firm, clean and free of loose parts and cracks. If the render is weak or hollow it is removed or treated first, because the waterproof layer cannot compensate for an unsound surface beneath it.

What should I send you from Nuayriyah?

Send clear photos of the spot and a short description of the problem on WhatsApp, mention that you are in Nuayriyah, and we will work out the next step with you.

What decides the cost of waterproofing a bathroom before tiling?

The floor area and how high the layer runs up the walls, the condition of the render, the number of cracks, corners and pipe sleeves, and the material that suits the surface. Send photos and rough dimensions on WhatsApp, tell us about the project, and we will explain the treatment needed.

Nearby areas

Bathroom waterproofing before tiling near Nuayriyah

We also work near Nuayriyah, in Al Muhammadiyah (near Nuayriyah), Al Faisaliyah (near Nuayriyah) and Al Aziziyah (near Nuayriyah).

Other services in the area

More services in Nuayriyah

Worker applying the white insulation layer on a villa roof by the sea

We start with you in Nuayriyah
with one call

Describe the problem and where it is in Nuayriyah, and we will tell you the right next step.

+966 54 311 2066
Call nowWhatsApp