Abraj Al AzlContracting
Call العربية
Screeded bathroom with a continuous grey membrane up the wall base

Bathroom waterproofing before tiling in Maaqla

Waterproof before you tile

A continuous waterproof membrane on the bathroom floor and wet-area walls, before adhesive and tiles go on

+966 54 311 2066
The service in your area

Bathroom waterproofing before tiling in Maaqla

In Maaqla we waterproof bathrooms before tiling, with a continuous membrane over the floor and wet-area walls before adhesive and tiles. Send a photo of the bathroom by call or WhatsApp.

Maaqla is a village mixing private houses with public buildings, and its bathrooms vary in size and age. In a heavily used bathroom damp builds up at the shower floor and where tiles meet the wall, and these points are treated first before any tiling. The scope of work depends on what the photos show about the floor and the drain.

  • Maaqla is a village in the Eastern Province, near Al Boweibiya, Sihmah and the government departments, with houses and public buildings.
  • Heavily used bathrooms need the drain checked more closely than others.
What the service includes

What we do for you in Maaqla

  • Leaving the membrane to dry and cure before adhesive and tiling begin
  • Forming and treating the floor-to-wall corners before the main layer
  • Checking the floor, the render, the corners, the drain outlet and pipe sleeves
  • Applying the membrane over the full floor and up the walls in the wet zone
How we work

From first contact to the finished job in Maaqla

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the walls, the drain outlet and the door threshold, so we can read the surface and decide the right material and treatment.

2

Prepare the surface

The floor and render are cleaned of dust and loose parts, hairline cracks, joints and corners are treated, and pipe sleeves and the drain outlet are sealed before anything else.

3

Apply the membrane

The layer covers the full floor, rises on the walls in the shower and basin area, is worked carefully into the corners and closes around the drain outlet and the door threshold. The material chosen depends on the surface and its condition.

4

Dry, then tiling begins

The membrane is left to dry and cure before tile adhesive and tiles go on, so it is not stressed or wetted from above before it is fully ready.

What sets us apart

Why Abraj Al Azl?

Corners and the drain get first attentionThe floor-to-wall corner and the area around the drain outlet are where most leaks begin, and these are treated carefully before the main layer goes on.

We serve Maaqla and around itIncluding Al Boweibiya, Sihmah and Government Departments (near Umm al Hawshat), as part of our work across the Eastern Province.

Start from Maaqla with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing
White insulated dome on a roof among the houses
White stepped dome on an insulated roof above a street

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

What customers ask in Maaqla

Is waterproofing suitable for shared bathrooms in Maaqla?

Yes, provided the floor and drain are accessible. We ask for photos of the shared bathroom to gauge the use and where water collects.

What decides the amount of work in a Maaqla bathroom?

It is set by the condition of the floor and drain and how many spots need treating. We give no timing before reviewing the photos and assessing the state of the bathroom.

Does the surface need to be completely dry before the membrane is applied?

Sufficient dryness is needed for good adhesion. Some materials tolerate a slightly damp surface while others need it fully dry. The surface is checked before work starts, and if visible moisture is present it is left long enough before the membrane is applied. We make this clear when the job is agreed.

What is the difference between a cementitious coating and a liquid membrane in a bathroom?

The cementitious coating bonds firmly to the concrete slab and the wall and suits flat regular surfaces. The liquid membrane is brushed on and follows corners and detailed areas easily. The choice between them depends on the surface and the bathroom layout, and we decide after seeing the photos.

Can the membrane go straight over the render?

It can, if the render is firm, clean and free of loose parts and cracks. If the render is weak or hollow it is removed or treated first, because the waterproof layer cannot compensate for an unsound surface beneath it.

Is Maaqla within your service area?

Yes, Maaqla is one of the areas we work in, as are Al Boweibiya, Sihmah and Government Departments (near Umm al Hawshat). To start, call us or message us on WhatsApp.

Nearby areas

Areas near Maaqla

Nearby areas we also cover: Al Boweibiya, Sihmah and Government Departments (near Umm al Hawshat).

Other services in the area

More services in Maaqla

Worker applying the white insulation layer on a villa roof by the sea

In Maaqla and need bathroom waterproofing before tiling?
Send us photos of the spot

Describe the problem and where it is in Maaqla, and we will tell you the right next step.

+966 54 311 2066
Call nowWhatsApp