Abraj Al AzlContracting
Call العربية
Screeded bathroom with a continuous grey membrane up the wall base

Bathroom waterproofing before tiling in Industrial (near Al Khafji)

Waterproof before you tile

A continuous waterproof membrane on the bathroom floor and wet-area walls, before adhesive and tiles go on

+966 54 311 2066
The service in your area

Bathroom waterproofing before tiling in Industrial (near Al Khafji)

Bathroom waterproofing before tiling in the Industrial area starts with photos of the bathroom floor and walls, sent by call or WhatsApp. The area is made up of buildings, facilities and scattered homes, and bathrooms vary considerably depending on the type of building and its use.

The Industrial area has buildings used for both living and work, including bathrooms that see heavy use, where water, soap and frequent cleaning all come together. Such intensive use reveals any lack in the membrane sooner than ordinary household use would. Since the buildings here vary in shape and age, the photos determine whether a bathroom needs full waterproofing or only limited repair at the joints.

  • The Industrial area is in Al-Ahsa in the Eastern Province, lying close to At Taawun, Al Luluah and An Nahdah.
  • Heavily used bathrooms reveal a weak membrane faster than ordinary household bathrooms do.
What the service includes

The scope of the work in Industrial (near Al Khafji)

  • Sealing around the drain outlet, the door threshold and all pipe sleeves
  • Forming and treating the floor-to-wall corners before the main layer
  • Checking the floor, the render, the corners, the drain outlet and pipe sleeves
  • Cleaning the surface, removing loose parts and treating hairline cracks
How we work

From first contact to the finished job in Industrial (near Al Khafji)

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the walls, the drain outlet and the door threshold, so we can read the surface and decide the right material and treatment.

2

Prepare the surface

The floor and render are cleaned of dust and loose parts, hairline cracks, joints and corners are treated, and pipe sleeves and the drain outlet are sealed before anything else.

3

Apply the membrane

The layer covers the full floor, rises on the walls in the shower and basin area, is worked carefully into the corners and closes around the drain outlet and the door threshold. The material chosen depends on the surface and its condition.

4

Dry, then tiling begins

The membrane is left to dry and cure before tile adhesive and tiles go on, so it is not stressed or wetted from above before it is fully ready.

What sets us apart

Why Abraj Al Azl?

Sealed before it is closedOnce tiled, the membrane cannot be reached, so getting it right before tiling matters far more than any repair afterwards.

Industrial (near Al Khafji) is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

We serve Industrial (near Al Khafji) and around itIncluding At Taawun (near Al Khafji), Al Luluah and An Nahdah (near Al Khafji), as part of our work across the Eastern Province.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing
White insulated dome on a roof among the houses
White stepped dome on an insulated roof above a street

Customer reviews

What our customers said

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

Real Google reviews, shown exactly as their authors wrote them.

Questions

Your questions on bathroom waterproofing before tiling in Industrial (near Al Khafji)

Does the method differ for bathrooms in mixed-use buildings?

Yes, because use is heavier and the space may differ. The photos show how the bathroom is used and what the floor is made of, and from that we decide what suits that building.

Do you waterproof bathrooms in the Industrial area before tiling?

Yes, we serve the Industrial area. Send photos of the bathroom and describe the building and how many people use the bathroom, so we can establish whether waterproofing before tiling is the right step.

What decides the cost of waterproofing a bathroom before tiling?

The floor area and how high the layer runs up the walls, the condition of the render, the number of cracks, corners and pipe sleeves, and the material that suits the surface. Send photos and rough dimensions on WhatsApp, tell us about the project, and we will explain the treatment needed.

Do you cover Industrial (near Al Khafji)?

Yes. We serve Industrial (near Al Khafji) and nearby areas such as At Taawun (near Al Khafji), Al Luluah and An Nahdah (near Al Khafji), from our base in Al Uwaymiriyah, Hofuf. Start with a call or a WhatsApp message.

How is the corner between the floor and the wall sealed?

The corner is the most vulnerable point because it joins two surfaces at a right angle. It is filled and formed with a suitable compound before the waterproof layer is turned up over it, so the layer stays continuous rather than cracking at the bend.

How high up the wall does the membrane go?

It depends on the bathroom layout and where the showerhead and basin sit. In the shower area the layer rises to cover the full wet zone, and at the other walls it turns up a safe distance above the floor. We set the height after seeing the photos and the layout.

Nearby areas

Areas near Industrial (near Al Khafji)

If the site is outside Industrial (near Al Khafji), the same service is available in At Taawun (near Al Khafji), Al Luluah and An Nahdah (near Al Khafji).

Other services in the area

More services in Industrial (near Al Khafji)

Worker applying the white insulation layer on a villa roof by the sea

In Industrial (near Al Khafji) and need bathroom waterproofing before tiling?
Send us photos of the spot

Call us or send photos of the bathroom and the floor on WhatsApp, and we take it from there.

+966 54 311 2066
Call nowWhatsApp