Abraj Al AzlContracting
Call العربية
Screeded bathroom with a continuous grey membrane up the wall base

Bathroom waterproofing before tiling in Inak

Waterproof before you tile

A continuous waterproof membrane on the bathroom floor and wet-area walls, before adhesive and tiles go on

+966 54 311 2066
The service in your area

Bathroom waterproofing before tiling in Inak

Bathroom waterproofing before tiling in Inak starts with WhatsApp photos of the floor and wet walls. The town has houses and villas with many older bathrooms needing renewal, so a waterproof membrane is essential to protect the structure from damp and leaks before tiles are laid.

Inak's houses vary between old and new, and older bathrooms often show damp marks around plumbing and at corners. Walls may have old peeling paint or plaster, and floors may be plain concrete or cracked tile. A waterproof membrane before retiling stops later seepage into adjacent walls and foundations. Photos show the current surface condition so we can choose the right way to prepare and seal.

  • Inak is a town in the Eastern Province, close to Al Bustan One and Al Mahar, with houses and villas of varying ages.
  • An older bathroom in a house holds moisture for a long time, especially if ventilation is poor, making waterproofing essential before renovation.
What the service includes

The scope of the work in Inak

  • Sealing around the drain outlet, the door threshold and all pipe sleeves
  • Cleaning the surface, removing loose parts and treating hairline cracks
  • Applying the membrane over the full floor and up the walls in the wet zone
  • Forming and treating the floor-to-wall corners before the main layer
How we work

From first contact to the finished job in Inak

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the walls, the drain outlet and the door threshold, so we can read the surface and decide the right material and treatment.

2

Prepare the surface

The floor and render are cleaned of dust and loose parts, hairline cracks, joints and corners are treated, and pipe sleeves and the drain outlet are sealed before anything else.

3

Apply the membrane

The layer covers the full floor, rises on the walls in the shower and basin area, is worked carefully into the corners and closes around the drain outlet and the door threshold. The material chosen depends on the surface and its condition.

4

Dry, then tiling begins

The membrane is left to dry and cure before tile adhesive and tiles go on, so it is not stressed or wetted from above before it is fully ready.

What sets us apart

Why Abraj Al Azl?

Sealed before it is closedOnce tiled, the membrane cannot be reached, so getting it right before tiling matters far more than any repair afterwards.

We serve Inak and around itIncluding Al Bustan One, Al Mahar and Al Badr, as part of our work across the Eastern Province.

Start from Inak with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing
White insulated dome on a roof among the houses
White stepped dome on an insulated roof above a street

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

Real Google reviews, shown exactly as their authors wrote them.

Questions

Your questions on bathroom waterproofing before tiling in Inak

Can an old bathroom in Inak be waterproofed without removing the existing tiles?

If the tiles are sound and water is not currently leaking, localised sealing may be possible. But new tiling requires full waterproofing under the new tiles, and the photos show us the surface condition so we can advise you.

How thick is the waterproof membrane you apply in Inak bathrooms?

The membrane thickness depends on the material type, the surfaces to be sealed, and existing damp. Photos show us the actual condition and help us choose the right thickness and material for your bathroom.

Does the surface need to be completely dry before the membrane is applied?

Sufficient dryness is needed for good adhesion. Some materials tolerate a slightly damp surface while others need it fully dry. The surface is checked before work starts, and if visible moisture is present it is left long enough before the membrane is applied. We make this clear when the job is agreed.

How high up the wall does the membrane go?

It depends on the bathroom layout and where the showerhead and basin sit. In the shower area the layer rises to cover the full wet zone, and at the other walls it turns up a safe distance above the floor. We set the height after seeing the photos and the layout.

Do you offer bathroom waterproofing before tiling in Inak?

Yes. Inak is within our service area in the Eastern Province, and we also work in Al Bustan One, Al Mahar and Al Badr. Call us or send photos of the spot on WhatsApp.

How is the corner between the floor and the wall sealed?

The corner is the most vulnerable point because it joins two surfaces at a right angle. It is filled and formed with a suitable compound before the waterproof layer is turned up over it, so the layer stays continuous rather than cracking at the bend.

Nearby areas

Areas near Inak

We also work near Inak, in Al Bustan One, Al Mahar and Al Badr.

Other services in the area

More services in Inak

Worker applying the white insulation layer on a villa roof by the sea

We start with you in Inak
with one call

Call us or send photos of the bathroom and the floor on WhatsApp, and we take it from there.

+966 54 311 2066
Call nowWhatsApp