
Bathroom waterproofing before tiling in Ibn Sharar
Bathroom waterproofing before tiling in Ibn Sharar begins with WhatsApp messages containing photos of the bathroom and its dimensions. The village has scattered houses and villas with bathrooms that vary in size and layout, all needing a moisture-resistant membrane before adhesive and tiles are laid.
The village contains houses and villas of varying age and design, so bathrooms range from tight spaces to generous ones, some newly built and others being renovated. Moisture from showers and cleaning penetrates tile into concrete without a waterproof barrier, causing damp in adjoining walls. The waterproofing layer is applied to the floor and wet walls before tiling, with its thickness and method chosen after reviewing photos and assessing the condition.
- Ibn Sharar is a village in the Eastern Province close to Al Hayra and Manakh, with scattered houses and villas spread across open land.
- A newly built bathroom may lack a waterproofing layer before tiling if it was not planned from the start, making repairs later harder and more costly.
The bathroom waterproofing before tiling work in Ibn Sharar
- Sealing around the drain outlet, the door threshold and all pipe sleeves
- Applying the membrane over the full floor and up the walls in the wet zone
- Forming and treating the floor-to-wall corners before the main layer
- Cleaning the surface, removing loose parts and treating hairline cracks
The steps of bathroom waterproofing before tiling in Ibn Sharar
Send photos of the bathroom
On WhatsApp: photos of the floor, the walls, the drain outlet and the door threshold, so we can read the surface and decide the right material and treatment.
Prepare the surface
The floor and render are cleaned of dust and loose parts, hairline cracks, joints and corners are treated, and pipe sleeves and the drain outlet are sealed before anything else.
Apply the membrane
The layer covers the full floor, rises on the walls in the shower and basin area, is worked carefully into the corners and closes around the drain outlet and the door threshold. The material chosen depends on the surface and its condition.
Dry, then tiling begins
The membrane is left to dry and cure before tile adhesive and tiles go on, so it is not stressed or wetted from above before it is fully ready.
Why Abraj Al Azl?
Sealed before it is closedOnce tiled, the membrane cannot be reached, so getting it right before tiling matters far more than any repair afterwards.
We serve Ibn Sharar and around itIncluding Al Hayra, Manakh and Umm Qulayb, as part of our work across the Eastern Province.
Bathroom waterproofing before tiling in Ibn ShararWe choose the method and the materials once we know the condition of the spot.
We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.
Some of our work

















What our customers said
ماشاء الله تبارك الرحمن عزل اسطح ممتاز
أفضل شركة عزل اسطح الفوم وخزانات المياه
اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم
Real Google reviews, shown exactly as their authors wrote them.
Questions about bathroom waterproofing before tiling in Ibn Sharar
Can waterproofing be added to an older bathroom in Ibn Sharar?
Yes, but the existing tile must be removed first. Send photos of the bathroom and tell us if you plan to fully renovate it; the photos will show whether the concrete needs repair before waterproofing is applied.
Is waterproofing necessary before tile in every bathroom?
Yes, because water will penetrate tile grout and adhesive joints. A moisture-resistant membrane beneath the tile protects the concrete and walls and prevents damp and mould from appearing.
What should I send you from Ibn Sharar?
Send clear photos of the spot and a short description of the problem on WhatsApp, mention that you are in Ibn Sharar, and we will work out the next step with you.
What is the difference between a cementitious coating and a liquid membrane in a bathroom?
The cementitious coating bonds firmly to the concrete slab and the wall and suits flat regular surfaces. The liquid membrane is brushed on and follows corners and detailed areas easily. The choice between them depends on the surface and the bathroom layout, and we decide after seeing the photos.
Does the surface need to be completely dry before the membrane is applied?
Sufficient dryness is needed for good adhesion. Some materials tolerate a slightly damp surface while others need it fully dry. The surface is checked before work starts, and if visible moisture is present it is left long enough before the membrane is applied. We make this clear when the job is agreed.
How is the corner between the floor and the wall sealed?
The corner is the most vulnerable point because it joins two surfaces at a right angle. It is filled and formed with a suitable compound before the waterproof layer is turned up over it, so the layer stays continuous rather than cracking at the bend.
We also offer it in neighbouring areas
Nearby areas we also cover: Al Hayra, Manakh and Umm Qulayb.
More services in Ibn Sharar



