Abraj Al AzlContracting
Call العربية
Screeded bathroom with a continuous grey membrane up the wall base

Bathroom waterproofing before tiling in Hafar Al-Batin

Waterproof before you tile

A continuous waterproof membrane on the bathroom floor and wet-area walls, before adhesive and tiles go on

+966 54 311 2066
The service in your area

Bathroom waterproofing before tiling in Hafar Al-Batin

We waterproof bathrooms before tiling in Hafar Al-Batin, applying a continuous membrane across the floor and the wet-area walls. Send photos of the bathroom by call or WhatsApp and we will assess the condition before any work begins.

Hafar Al-Batin has houses and multi-storey residential buildings whose drainage and finishing work vary in age. In older bathrooms, damp usually appears along the floor edges and at the joints between tiles and walls. The condition of the floor decides whether levelling or crack treatment is needed before the membrane goes on, and the photos show whether waterproofing alone is enough in your case.

  • Hafar Al-Batin is a city in the Eastern Province, with the Khalidiyah, Aziziyah and Baladiyah districts within its residential area.
  • Dampness in a bathroom usually starts at the edges and joints rather than the centre of the floor.
What the service includes

The bathroom waterproofing before tiling work in Hafar Al-Batin

  • Sealing around the drain outlet, the door threshold and all pipe sleeves
  • Leaving the membrane to dry and cure before adhesive and tiling begin
  • Applying the membrane over the full floor and up the walls in the wet zone
  • Cleaning the surface, removing loose parts and treating hairline cracks
How we work

This is how we work in Hafar Al-Batin

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the walls, the drain outlet and the door threshold, so we can read the surface and decide the right material and treatment.

2

Prepare the surface

The floor and render are cleaned of dust and loose parts, hairline cracks, joints and corners are treated, and pipe sleeves and the drain outlet are sealed before anything else.

3

Apply the membrane

The layer covers the full floor, rises on the walls in the shower and basin area, is worked carefully into the corners and closes around the drain outlet and the door threshold. The material chosen depends on the surface and its condition.

4

Dry, then tiling begins

The membrane is left to dry and cure before tile adhesive and tiles go on, so it is not stressed or wetted from above before it is fully ready.

What sets us apart

Why Abraj Al Azl?

Sealed before it is closedOnce tiled, the membrane cannot be reached, so getting it right before tiling matters far more than any repair afterwards.

Start from Hafar Al-Batin with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

Bathroom waterproofing before tiling in Hafar Al-BatinWe choose the method and the materials once we know the condition of the spot.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing
White insulated dome on a roof among the houses
White stepped dome on an insulated roof above a street

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Your questions on bathroom waterproofing before tiling in Hafar Al-Batin

Does the bathroom need to be cleared before waterproofing in Hafar Al-Batin?

Yes, it is best to remove fixtures and any damaged tiles so the floor and walls are exposed. We will confirm what needs removing once we have reviewed the photos.

Can you waterproof a bathroom in an apartment within a building in Hafar Al-Batin?

Yes, we work on bathrooms in flats and houses alike. Send photos and tell us which floor it is, so we can judge whether the damp comes from the bathroom itself or from adjoining units.

What decides the cost of waterproofing a bathroom before tiling?

The floor area and how high the layer runs up the walls, the condition of the render, the number of cracks, corners and pipe sleeves, and the material that suits the surface. Send photos and rough dimensions on WhatsApp, tell us about the project, and we will explain the treatment needed.

Can the membrane go straight over the render?

It can, if the render is firm, clean and free of loose parts and cracks. If the render is weak or hollow it is removed or treated first, because the waterproof layer cannot compensate for an unsound surface beneath it.

What is the difference between a cementitious coating and a liquid membrane in a bathroom?

The cementitious coating bonds firmly to the concrete slab and the wall and suits flat regular surfaces. The liquid membrane is brushed on and follows corners and detailed areas easily. The choice between them depends on the surface and the bathroom layout, and we decide after seeing the photos.

What should I send you from Hafar Al-Batin?

Send clear photos of the spot and a short description of the problem on WhatsApp, mention that you are in Hafar Al-Batin, and we will work out the next step with you.

Nearby areas

Areas near Hafar Al-Batin

We also work near Hafar Al-Batin, in Al Khalidiyah (near Hafar Al-Batin), Al Aziziyah (near Hafar Al-Batin) and Al Baladiyah.

Other services in the area

More services in Hafar Al-Batin

Worker applying the white insulation layer on a villa roof by the sea

Bathroom waterproofing before tiling in Hafar Al-Batin?
Call us now

One number for calls and WhatsApp, and you talk to us directly.

+966 54 311 2066
Call nowWhatsApp