Abraj Al AzlContracting
Call العربية
Screeded bathroom with a continuous grey membrane up the wall base

Bathroom waterproofing before tiling in Government Departments

Waterproof before you tile

A continuous waterproof membrane on the bathroom floor and wet-area walls, before adhesive and tiles go on

+966 54 311 2066
The service in your area

Bathroom waterproofing before tiling in Government Departments

We waterproof bathrooms before tiling in the Government Departments area, Hofuf, beginning with photos of the bathroom sent by call or WhatsApp. The area is made up of scattered houses and residential blocks, and its bathroom floors and joints need a continuous membrane before adhesive and tiles go on.

The area has older houses alongside newer residential blocks, with bathrooms of differing age, and damp often shows at the joints and around drain openings. Work begins by checking the base and removing loose tiles, then a continuous membrane goes on the floor and the wet walls before retiling. The photos show whether a bathroom needs full treatment or a targeted repair.

  • The Government Departments area is a district in Hofuf, Al-Ahsa, in the Eastern Province, lying near Yebrin and Ar Rabie.
  • The floor-to-wall joints are the first part of a bathroom to take on moisture, so good treatment starts there.
What the service includes

What we do for you in Government Departments

  • Sealing around the drain outlet, the door threshold and all pipe sleeves
  • Applying the membrane over the full floor and up the walls in the wet zone
  • Forming and treating the floor-to-wall corners before the main layer
  • Leaving the membrane to dry and cure before adhesive and tiling begin
How we work

From first contact to the finished job in Government Departments

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the walls, the drain outlet and the door threshold, so we can read the surface and decide the right material and treatment.

2

Prepare the surface

The floor and render are cleaned of dust and loose parts, hairline cracks, joints and corners are treated, and pipe sleeves and the drain outlet are sealed before anything else.

3

Apply the membrane

The layer covers the full floor, rises on the walls in the shower and basin area, is worked carefully into the corners and closes around the drain outlet and the door threshold. The material chosen depends on the surface and its condition.

4

Dry, then tiling begins

The membrane is left to dry and cure before tile adhesive and tiles go on, so it is not stressed or wetted from above before it is fully ready.

What sets us apart

Why Abraj Al Azl?

Sealed before it is closedOnce tiled, the membrane cannot be reached, so getting it right before tiling matters far more than any repair afterwards.

Start from Government Departments with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

Government Departments is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing
White insulated dome on a roof among the houses
White stepped dome on an insulated roof above a street

Customer reviews

What our customers said

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Your questions on bathroom waterproofing before tiling in Government Departments

Do you treat older bathrooms in the Government Departments area?

Yes, older bathrooms are treated after the base is checked. If the base is sound it can be worked on, and if it is damaged the photos will tell you so before any work begins.

How does the work begin for a bathroom in a residential block in the Government Departments area?

Send photos of the bathroom and the building, and mention the floor if relevant, so we know whether arrangements with neighbours or the building owner are needed. We then agree the next step with you.

Does the surface need to be completely dry before the membrane is applied?

Sufficient dryness is needed for good adhesion. Some materials tolerate a slightly damp surface while others need it fully dry. The surface is checked before work starts, and if visible moisture is present it is left long enough before the membrane is applied. We make this clear when the job is agreed.

What is the difference between a cementitious coating and a liquid membrane in a bathroom?

The cementitious coating bonds firmly to the concrete slab and the wall and suits flat regular surfaces. The liquid membrane is brushed on and follows corners and detailed areas easily. The choice between them depends on the surface and the bathroom layout, and we decide after seeing the photos.

Is Government Departments within your service area?

Yes, Government Departments is one of the areas we work in, as are Yebrin (near Al Ekhaa), Yabrin (near Al Khunn) and Ar Rabie (near Al Khunn). To start, call us or message us on WhatsApp.

How high up the wall does the membrane go?

It depends on the bathroom layout and where the showerhead and basin sit. In the shower area the layer rises to cover the full wet zone, and at the other walls it turns up a safe distance above the floor. We set the height after seeing the photos and the layout.

Nearby areas

The same service in nearby areas

We also work near Government Departments, in Yebrin (near Al Ekhaa), Yabrin (near Al Khunn) and Ar Rabie (near Al Khunn).

Other services in the area

More services in Government Departments

Worker applying the white insulation layer on a villa roof by the sea

In Government Departments and need bathroom waterproofing before tiling?
Send us photos of the spot

Call us, or send photos of the spot and a short description of the problem on WhatsApp.

+966 54 311 2066
Call nowWhatsApp