Abraj Al AzlContracting
Call العربية
Screeded bathroom with a continuous grey membrane up the wall base

Bathroom waterproofing before tiling in Ghanwa

Waterproof before you tile

A continuous waterproof membrane on the bathroom floor and wet-area walls, before adhesive and tiles go on

+966 54 311 2066
The service in your area

Bathroom waterproofing before tiling in Ghanwa

Waterproofing bathrooms in Ghanwa before tiling begins with photos of the bathroom sent via WhatsApp or call. Ghanwa is a small hamlet with closely-spaced houses and villas, where each bathroom needs a continuous waterproof membrane protecting against water seepage.

In Ghanwa, houses and villas stand close together, and most bathrooms are older or middle-aged. Interior walls may show moisture or dampness, especially around pipes and joints, and floors may be slightly uneven due to natural settlement. A waterproof membrane before tiling protects against these conditions and prevents them worsening. Photos help determine if prior treatment is needed for cracks or damaged surfaces.

  • Ghanwa is a hamlet in the Eastern Province, close to Az Zughayn, Al Khubrah and As Sarrar.
  • In closely-spaced dwellings, bathrooms may share walls with other rooms, so waterproofing prevents moisture transferring between them.
What the service includes

The main items of bathroom waterproofing before tiling in Ghanwa

  • Sealing around the drain outlet, the door threshold and all pipe sleeves
  • Cleaning the surface, removing loose parts and treating hairline cracks
  • Forming and treating the floor-to-wall corners before the main layer
  • Leaving the membrane to dry and cure before adhesive and tiling begin
How we work

How we carry out bathroom waterproofing before tiling in Ghanwa

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the walls, the drain outlet and the door threshold, so we can read the surface and decide the right material and treatment.

2

Prepare the surface

The floor and render are cleaned of dust and loose parts, hairline cracks, joints and corners are treated, and pipe sleeves and the drain outlet are sealed before anything else.

3

Apply the membrane

The layer covers the full floor, rises on the walls in the shower and basin area, is worked carefully into the corners and closes around the drain outlet and the door threshold. The material chosen depends on the surface and its condition.

4

Dry, then tiling begins

The membrane is left to dry and cure before tile adhesive and tiles go on, so it is not stressed or wetted from above before it is fully ready.

What sets us apart

Why Abraj Al Azl?

Sealed before it is closedOnce tiled, the membrane cannot be reached, so getting it right before tiling matters far more than any repair afterwards.

Ghanwa is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

Start from Ghanwa with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing
White insulated dome on a roof among the houses
White stepped dome on an insulated roof above a street

Customer reviews

What our customers said

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Common questions on bathroom waterproofing before tiling in Ghanwa

Is waterproofing the floor alone enough, or must the walls be sealed too?

Walls must also be sealed, especially in the shower area and around pipes. Water splashes and runs down walls, so waterproofing protects shared walls with other rooms.

Does an uneven floor affect the quality of waterproofing?

Slightly uneven floors do not prevent membrane application. If there are large variations or cracks, we may need initial levelling. Photos show what needs treatment before waterproofing.

Can the membrane go straight over the render?

It can, if the render is firm, clean and free of loose parts and cracks. If the render is weak or hollow it is removed or treated first, because the waterproof layer cannot compensate for an unsound surface beneath it.

Does the surface need to be completely dry before the membrane is applied?

Sufficient dryness is needed for good adhesion. Some materials tolerate a slightly damp surface while others need it fully dry. The surface is checked before work starts, and if visible moisture is present it is left long enough before the membrane is applied. We make this clear when the job is agreed.

How high up the wall does the membrane go?

It depends on the bathroom layout and where the showerhead and basin sit. In the shower area the layer rises to cover the full wet zone, and at the other walls it turns up a safe distance above the floor. We set the height after seeing the photos and the layout.

Is Ghanwa within your service area?

Yes, Ghanwa is one of the areas we work in, as are Az Zughayn, Al Khubrah and As Sarrar. To start, call us or message us on WhatsApp.

Nearby areas

We also offer it in neighbouring areas

If the site is outside Ghanwa, the same service is available in Az Zughayn, Al Khubrah and As Sarrar.

Other services in the area

More services in Ghanwa

Worker applying the white insulation layer on a villa roof by the sea

We start with you in Ghanwa
with one call

Call us or send photos of the bathroom and the floor on WhatsApp, and we take it from there.

+966 54 311 2066
Call nowWhatsApp