Abraj Al AzlContracting
Call العربية
Screeded bathroom with a continuous grey membrane up the wall base

Bathroom waterproofing before tiling in Badr

Waterproof before you tile

A continuous waterproof membrane on the bathroom floor and wet-area walls, before adhesive and tiles go on

+966 54 311 2066
The service in your area

Bathroom waterproofing before tiling in Badr

Bathroom waterproofing before tiling in Badr starts with photos sent via WhatsApp or a call. The district has villas and multi-storey houses, and their bathrooms need a tight waterproof membrane before tiling to prevent water leaks.

Badr has houses of different sizes, some standalone villas and some residential buildings, some older and some newer. A bathroom in an old house may have cracked concrete surfaces and walls with accumulated damp, while a new bathroom needs protection from the start. Water leaking from a bathroom on an upper floor can damage units below and interior walls. Clear photos of the floor, walls and any cracks help determine the right treatment before the membrane and tiles are laid.

  • Badr is a district in the Eastern Province, close to Ohod, An Noor and Al Manar.
  • Bathrooms in multi-storey houses need strong waterproofing because leaks affect shared units and walls.
What the service includes

The bathroom waterproofing before tiling work in Badr

  • Sealing around the drain outlet, the door threshold and all pipe sleeves
  • Leaving the membrane to dry and cure before adhesive and tiling begin
  • Cleaning the surface, removing loose parts and treating hairline cracks
  • Applying the membrane over the full floor and up the walls in the wet zone
How we work

This is how we work in Badr

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the walls, the drain outlet and the door threshold, so we can read the surface and decide the right material and treatment.

2

Prepare the surface

The floor and render are cleaned of dust and loose parts, hairline cracks, joints and corners are treated, and pipe sleeves and the drain outlet are sealed before anything else.

3

Apply the membrane

The layer covers the full floor, rises on the walls in the shower and basin area, is worked carefully into the corners and closes around the drain outlet and the door threshold. The material chosen depends on the surface and its condition.

4

Dry, then tiling begins

The membrane is left to dry and cure before tile adhesive and tiles go on, so it is not stressed or wetted from above before it is fully ready.

What sets us apart

Why Abraj Al Azl?

Sealed before it is closedOnce tiled, the membrane cannot be reached, so getting it right before tiling matters far more than any repair afterwards.

Bathroom waterproofing before tiling in BadrWe choose the method and the materials once we know the condition of the spot.

Your request from Badr comes to usCall or WhatsApp on one number, and we answer you ourselves.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing
White insulated dome on a roof among the houses
White stepped dome on an insulated roof above a street

Customer reviews

What our customers said

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

Real Google reviews, shown exactly as their authors wrote them.

Questions

Your questions on bathroom waterproofing before tiling in Badr

If the house is old in Badr, will damp walls stop the waterproof membrane from bonding?

Damp or wet surfaces will not allow the membrane to bond securely. Walls and floors must be cleaned and dried first, and may need treatment for accumulated moisture. Photos will show whether additional preparatory steps are needed.

Do you waterproof bathrooms in both villas and apartment blocks in Badr?

Yes, we serve Badr and waterproof bathrooms in villas and apartment blocks alike. Send photos of the bathroom and tell us whether it is in a villa or apartment block, and we will plan the right access and work method.

Can the membrane go straight over the render?

It can, if the render is firm, clean and free of loose parts and cracks. If the render is weak or hollow it is removed or treated first, because the waterproof layer cannot compensate for an unsound surface beneath it.

Does the surface need to be completely dry before the membrane is applied?

Sufficient dryness is needed for good adhesion. Some materials tolerate a slightly damp surface while others need it fully dry. The surface is checked before work starts, and if visible moisture is present it is left long enough before the membrane is applied. We make this clear when the job is agreed.

How high up the wall does the membrane go?

It depends on the bathroom layout and where the showerhead and basin sit. In the shower area the layer rises to cover the full wet zone, and at the other walls it turns up a safe distance above the floor. We set the height after seeing the photos and the layout.

Is Badr within your service area?

Yes, Badr is one of the areas we work in, as are Ohod, An Noor (near Ohod) and Al Manar (near Dammam). To start, call us or message us on WhatsApp.

Nearby areas

The same service in nearby areas

Nearby areas we also cover: Ohod, An Noor (near Ohod) and Al Manar (near Dammam).

Other services in the area

More services in Badr

Worker applying the white insulation layer on a villa roof by the sea

Bathroom waterproofing before tiling in Badr?
Call us now

Describe the problem and where it is in Badr, and we will tell you the right next step.

+966 54 311 2066
Call nowWhatsApp