Abraj Al AzlContracting
Call العربية
Screeded bathroom with a continuous grey membrane up the wall base

Bathroom waterproofing before tiling in Az Zawr (near Tarout)

Waterproof before you tile

A continuous waterproof membrane on the bathroom floor and wet-area walls, before adhesive and tiles go on

+966 54 311 2066
The service in your area

Bathroom waterproofing before tiling in Az Zawr (near Tarout)

Bathroom waterproofing before tiling in Az Zawr begins with WhatsApp photos from different angles. We apply a continuous waterproof layer that stops water from the bathroom reaching the building foundation and surrounding walls.

Az Zawr has villas and small residential blocks on varied plots. Many of these buildings were built before waterproofing standards were strict, so older bathrooms may leak. Waterproofing the bathroom again before retiling protects the walls and foundation from dampness and cracking. Clear photos of the floor, wet walls and any past seepage marks help us pick the right waterproof membrane.

  • Az Zawr is a district in the Eastern Province, near An Narjis One, Sanabis and Al Jawharah, with villas and small residential blocks.
  • A bathroom in an older building may show seepage marks around walls or ceiling, so new waterproofing before tiling stops these problems from growing worse.
What the service includes

What the service covers in Az Zawr (near Tarout)

  • Cleaning the surface, removing loose parts and treating hairline cracks
  • Leaving the membrane to dry and cure before adhesive and tiling begin
  • Checking the floor, the render, the corners, the drain outlet and pipe sleeves
  • Forming and treating the floor-to-wall corners before the main layer
How we work

This is how we work in Az Zawr (near Tarout)

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the walls, the drain outlet and the door threshold, so we can read the surface and decide the right material and treatment.

2

Prepare the surface

The floor and render are cleaned of dust and loose parts, hairline cracks, joints and corners are treated, and pipe sleeves and the drain outlet are sealed before anything else.

3

Apply the membrane

The layer covers the full floor, rises on the walls in the shower and basin area, is worked carefully into the corners and closes around the drain outlet and the door threshold. The material chosen depends on the surface and its condition.

4

Dry, then tiling begins

The membrane is left to dry and cure before tile adhesive and tiles go on, so it is not stressed or wetted from above before it is fully ready.

What sets us apart

Why Abraj Al Azl?

Sealed before it is closedOnce tiled, the membrane cannot be reached, so getting it right before tiling matters far more than any repair afterwards.

Bathroom waterproofing before tiling in Az Zawr (near Tarout)We choose the method and the materials once we know the condition of the spot.

Start from Az Zawr (near Tarout) with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing
White insulated dome on a roof among the houses
White stepped dome on an insulated roof above a street

Customer reviews

What our customers said

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

Real Google reviews, shown exactly as their authors wrote them.

Questions

Common questions on bathroom waterproofing before tiling in Az Zawr (near Tarout)

How do I know if my bathroom in Az Zawr needs new waterproofing?

Damp stains on walls or ceiling, musty smell, or loose tiles all point to seepage. Send photos of these signs and we will tell you if new waterproofing is needed.

Can an old bathroom in Az Zawr be waterproofed without fully removing all the old tiles?

No, proper waterproofing requires removing all old tiles, adhesive and debris before the new membrane goes on. This ensures strong bonding and effective protection from seepage.

Do you cover Az Zawr (near Tarout)?

Yes. We serve Az Zawr (near Tarout) and nearby areas such as Az Zour (near An Narjis One), An Narjis One and Sanabis (near An Narjis One), from our base in Al Uwaymiriyah, Hofuf. Start with a call or a WhatsApp message.

What decides the cost of waterproofing a bathroom before tiling?

The floor area and how high the layer runs up the walls, the condition of the render, the number of cracks, corners and pipe sleeves, and the material that suits the surface. Send photos and rough dimensions on WhatsApp, tell us about the project, and we will explain the treatment needed.

How is the corner between the floor and the wall sealed?

The corner is the most vulnerable point because it joins two surfaces at a right angle. It is filled and formed with a suitable compound before the waterproof layer is turned up over it, so the layer stays continuous rather than cracking at the bend.

What is the difference between a cementitious coating and a liquid membrane in a bathroom?

The cementitious coating bonds firmly to the concrete slab and the wall and suits flat regular surfaces. The liquid membrane is brushed on and follows corners and detailed areas easily. The choice between them depends on the surface and the bathroom layout, and we decide after seeing the photos.

Nearby areas

Areas near Az Zawr (near Tarout)

We also work near Az Zawr (near Tarout), in Az Zour (near An Narjis One), An Narjis One and Sanabis (near An Narjis One).

Other services in the area

More services in Az Zawr (near Tarout)

Worker applying the white insulation layer on a villa roof by the sea

In Az Zawr (near Tarout) and need bathroom waterproofing before tiling?
Send us photos of the spot

One number for calls and WhatsApp, and you talk to us directly.

+966 54 311 2066
Call nowWhatsApp