Abraj Al AzlContracting
Call العربية
Screeded bathroom with a continuous grey membrane up the wall base

Bathroom waterproofing before tiling in At Tubi (near Qatif)

Waterproof before you tile

A continuous waterproof membrane on the bathroom floor and wet-area walls, before adhesive and tiles go on

+966 54 311 2066
The service in your area

Bathroom waterproofing before tiling in At Tubi (near Qatif)

We waterproof bathrooms before tiling in At Tubi, starting with photos of the floor and the walls around the shower, received by call or WhatsApp. The town has scattered homes and rural houses, and the protective layer goes on before adhesive and tiles in every case.

At Tubi has scattered homes and rural housing close to farmland, and many bathrooms there are tiled directly onto unwaterproofed concrete floors. Without a barrier, such floors carry moisture up into the tiles over time, so the layer goes on the floor and around the shower before any tiling. The photos show whether the existing floor can take the layer or needs preparing first.

  • At Tubi is a town in the Eastern Province, near Al Madaris, Ash Shahba and Al Madani, with scattered homes and rural housing.
  • An unwaterproofed concrete floor draws moisture into tiles and adhesive if no barrier separates them.
What the service includes

What we do for you in At Tubi (near Qatif)

  • Sealing around the drain outlet, the door threshold and all pipe sleeves
  • Checking the floor, the render, the corners, the drain outlet and pipe sleeves
  • Applying the membrane over the full floor and up the walls in the wet zone
  • Leaving the membrane to dry and cure before adhesive and tiling begin
How we work

This is how we work in At Tubi (near Qatif)

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the walls, the drain outlet and the door threshold, so we can read the surface and decide the right material and treatment.

2

Prepare the surface

The floor and render are cleaned of dust and loose parts, hairline cracks, joints and corners are treated, and pipe sleeves and the drain outlet are sealed before anything else.

3

Apply the membrane

The layer covers the full floor, rises on the walls in the shower and basin area, is worked carefully into the corners and closes around the drain outlet and the door threshold. The material chosen depends on the surface and its condition.

4

Dry, then tiling begins

The membrane is left to dry and cure before tile adhesive and tiles go on, so it is not stressed or wetted from above before it is fully ready.

What sets us apart

Why Abraj Al Azl?

Sealed before it is closedOnce tiled, the membrane cannot be reached, so getting it right before tiling matters far more than any repair afterwards.

Your request from At Tubi (near Qatif) comes to usCall or WhatsApp on one number, and we answer you ourselves.

At Tubi (near Qatif) is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing
White insulated dome on a roof among the houses
White stepped dome on an insulated roof above a street

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

Real Google reviews, shown exactly as their authors wrote them.

Questions

Common questions on bathroom waterproofing before tiling in At Tubi (near Qatif)

Can a rural bathroom in At Tubi be tiled straight onto a concrete floor?

Not without waterproofing, because concrete carries moisture into the adhesive and tiles. From the photos we determine whether the floor needs preparing before the protective layer goes on.

Does bathroom waterproofing in At Tubi differ from cities?

The principle does not change, but scattered homes sometimes need a different approach for older floors. The photos reveal this difference and tell us where to start.

Does the surface need to be completely dry before the membrane is applied?

Sufficient dryness is needed for good adhesion. Some materials tolerate a slightly damp surface while others need it fully dry. The surface is checked before work starts, and if visible moisture is present it is left long enough before the membrane is applied. We make this clear when the job is agreed.

How high up the wall does the membrane go?

It depends on the bathroom layout and where the showerhead and basin sit. In the shower area the layer rises to cover the full wet zone, and at the other walls it turns up a safe distance above the floor. We set the height after seeing the photos and the layout.

Do you cover At Tubi (near Qatif)?

Yes. We serve At Tubi (near Qatif) and nearby areas such as At Tawbi (near Ad Doij), Al Madaris and Ash Shahba, from our base in Al Uwaymiriyah, Hofuf. Start with a call or a WhatsApp message.

Can the membrane go straight over the render?

It can, if the render is firm, clean and free of loose parts and cracks. If the render is weak or hollow it is removed or treated first, because the waterproof layer cannot compensate for an unsound surface beneath it.

Nearby areas

The same service in nearby areas

Nearby areas we also cover: At Tawbi (near Ad Doij), Al Madaris and Ash Shahba.

Other services in the area

More services in At Tubi (near Qatif)

Worker applying the white insulation layer on a villa roof by the sea

Bathroom waterproofing before tiling in At Tubi (near Qatif)?
Call us now

Describe the problem and where it is in At Tubi (near Qatif), and we will tell you the right next step.

+966 54 311 2066
Call nowWhatsApp