Abraj Al AzlContracting
Call العربية
Screeded bathroom with a continuous grey membrane up the wall base

Bathroom waterproofing before tiling in Ash Shuruq (near Al Khunn)

Waterproof before you tile

A continuous waterproof membrane on the bathroom floor and wet-area walls, before adhesive and tiles go on

+966 54 311 2066
The service in your area

Bathroom waterproofing before tiling in Ash Shuruq (near Al Khunn)

Bathroom waterproofing before tiling in Ash Shuruq starts with photos sent by call or WhatsApp. The district has modern homes and villas where bathrooms need a strong waterproof layer before new tiles are fitted.

Ash Shuruq is a relatively modern district with mostly new residential buildings and contemporary villas, yet even new buildings need solid waterproofing in bathrooms before tiles are laid. A modern bathroom may be well designed but the original waterproofing may not be enough or may need improving when retiling. Water and steam penetrate even modern foundations without proper waterproofing. Photos show the quality of the current waterproofing and what steps are needed to improve it.

  • Ash Shuruq is a district in the Eastern Province, close to Al Muruj, Al Yasmin and Ar Rabie, with modern residential homes and villas.
  • Modern villa bathrooms face daily water flow and humidity, so proper waterproofing before new tiles ensures long-term protection of the building.
What the service includes

The scope of the work in Ash Shuruq (near Al Khunn)

  • Cleaning the surface, removing loose parts and treating hairline cracks
  • Leaving the membrane to dry and cure before adhesive and tiling begin
  • Sealing around the drain outlet, the door threshold and all pipe sleeves
  • Forming and treating the floor-to-wall corners before the main layer
How we work

The steps of bathroom waterproofing before tiling in Ash Shuruq (near Al Khunn)

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the walls, the drain outlet and the door threshold, so we can read the surface and decide the right material and treatment.

2

Prepare the surface

The floor and render are cleaned of dust and loose parts, hairline cracks, joints and corners are treated, and pipe sleeves and the drain outlet are sealed before anything else.

3

Apply the membrane

The layer covers the full floor, rises on the walls in the shower and basin area, is worked carefully into the corners and closes around the drain outlet and the door threshold. The material chosen depends on the surface and its condition.

4

Dry, then tiling begins

The membrane is left to dry and cure before tile adhesive and tiles go on, so it is not stressed or wetted from above before it is fully ready.

What sets us apart

Why Abraj Al Azl?

Corners and the drain get first attentionThe floor-to-wall corner and the area around the drain outlet are where most leaks begin, and these are treated carefully before the main layer goes on.

Ash Shuruq (near Al Khunn) is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

Bathroom waterproofing before tiling in Ash Shuruq (near Al Khunn)We choose the method and the materials once we know the condition of the spot.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing
White insulated dome on a roof among the houses
White stepped dome on an insulated roof above a street

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

What customers ask in Ash Shuruq (near Al Khunn)

Does a new villa in Ash Shuruq need its bathroom waterproofed before the first tiles go on?

Yes, even a new villa benefits from professional waterproofing before tiling. The original waterproofing may be basic only, and extra waterproofing prevents future leaks. Photos will show whether there is existing waterproofing and whether it needs upgrading.

Should waterproofing be renewed in a new villa bathroom if we retile it?

It is advisable to renew the waterproofing when retiling, as the old membrane may be weakened after years of water and steam. Fresh waterproofing gives you better protection and extends the life of the tiles and walls. Send photos so we can see the bathroom's state.

How is the corner between the floor and the wall sealed?

The corner is the most vulnerable point because it joins two surfaces at a right angle. It is filled and formed with a suitable compound before the waterproof layer is turned up over it, so the layer stays continuous rather than cracking at the bend.

Can the membrane go straight over the render?

It can, if the render is firm, clean and free of loose parts and cracks. If the render is weak or hollow it is removed or treated first, because the waterproof layer cannot compensate for an unsound surface beneath it.

What decides the cost of waterproofing a bathroom before tiling?

The floor area and how high the layer runs up the walls, the condition of the render, the number of cracks, corners and pipe sleeves, and the material that suits the surface. Send photos and rough dimensions on WhatsApp, tell us about the project, and we will explain the treatment needed.

Is Ash Shuruq (near Al Khunn) within your service area?

Yes, Ash Shuruq (near Al Khunn) is one of the areas we work in, as are Al Muruj (near Al Khunn), Al Yasmin (near Al Khunn) and Ar Rabie (near Al Khunn). To start, call us or message us on WhatsApp.

Nearby areas

We also offer it in neighbouring areas

Nearby areas we also cover: Al Muruj (near Al Khunn), Al Yasmin (near Al Khunn) and Ar Rabie (near Al Khunn).

Other services in the area

More services in Ash Shuruq (near Al Khunn)

Worker applying the white insulation layer on a villa roof by the sea

We start with you in Ash Shuruq (near Al Khunn)
with one call

One number for calls and WhatsApp, and you talk to us directly.

+966 54 311 2066
Call nowWhatsApp