Abraj Al AzlContracting
Call العربية
Screeded bathroom with a continuous grey membrane up the wall base

Bathroom waterproofing before tiling in Ash Shayyit

Waterproof before you tile

A continuous waterproof membrane on the bathroom floor and wet-area walls, before adhesive and tiles go on

+966 54 311 2066
The service in your area

Bathroom waterproofing before tiling in Ash Shayyit

Waterproofing bathrooms in Ash Shayyit before tiling starts with WhatsApp photos of the bathroom inside and out. The village has houses and villas where bathrooms often suffer from damp that rots tiles and walls underneath.

Homes and villas in Ash Shayyit have bathrooms of varying size and age. Damp builds up behind old tiles and around door frames and openings, especially where drainage is poor or walls have cracked. A waterproof membrane on the floor and wet walls before tiling stops water reaching the foundations and structure. The photos you send give us a clear picture of the damage level and the right solution.

  • Ash Shayyit is a village in the Eastern Province, near Al Mahawa, Khubayra' and Umm ash Shifallah, with houses and villas.
  • In rural houses, ground drainage may be weak, so water pools around the bathroom rise and damp risk grows.
What the service includes

The scope of the work in Ash Shayyit

  • Checking the floor, the render, the corners, the drain outlet and pipe sleeves
  • Applying the membrane over the full floor and up the walls in the wet zone
  • Leaving the membrane to dry and cure before adhesive and tiling begin
  • Cleaning the surface, removing loose parts and treating hairline cracks
How we work

The stages of the work in Ash Shayyit

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the walls, the drain outlet and the door threshold, so we can read the surface and decide the right material and treatment.

2

Prepare the surface

The floor and render are cleaned of dust and loose parts, hairline cracks, joints and corners are treated, and pipe sleeves and the drain outlet are sealed before anything else.

3

Apply the membrane

The layer covers the full floor, rises on the walls in the shower and basin area, is worked carefully into the corners and closes around the drain outlet and the door threshold. The material chosen depends on the surface and its condition.

4

Dry, then tiling begins

The membrane is left to dry and cure before tile adhesive and tiles go on, so it is not stressed or wetted from above before it is fully ready.

What sets us apart

Why Abraj Al Azl?

Corners and the drain get first attentionThe floor-to-wall corner and the area around the drain outlet are where most leaks begin, and these are treated carefully before the main layer goes on.

Start from Ash Shayyit with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

Your request from Ash Shayyit comes to usCall or WhatsApp on one number, and we answer you ourselves.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing
White insulated dome on a roof among the houses
White stepped dome on an insulated roof above a street

Customer reviews

What our customers said

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Common questions on bathroom waterproofing before tiling in Ash Shayyit

What is the difference between waterproofing a damp bathroom and a dry one in Ash Shayyit?

A damp bathroom needs drying and cleaning first, then any cracks or holes repaired before the membrane goes on. A dry bathroom is easier because the surface is ready. In both cases, photos help us plan the steps needed.

Do you treat damp and mould before waterproofing a bathroom in Ash Shayyit?

Yes, if there is mould or heavy damp it must be treated before the membrane goes on. Send clear photos so we can tell you whether extra treatment is needed before we start.

How is the corner between the floor and the wall sealed?

The corner is the most vulnerable point because it joins two surfaces at a right angle. It is filled and formed with a suitable compound before the waterproof layer is turned up over it, so the layer stays continuous rather than cracking at the bend.

Do you cover Ash Shayyit?

Yes. We serve Ash Shayyit and nearby areas such as Al Mahawa, Umm ash Shifallah and Khubayra', from our base in Al Uwaymiriyah, Hofuf. Start with a call or a WhatsApp message.

How high up the wall does the membrane go?

It depends on the bathroom layout and where the showerhead and basin sit. In the shower area the layer rises to cover the full wet zone, and at the other walls it turns up a safe distance above the floor. We set the height after seeing the photos and the layout.

Does the surface need to be completely dry before the membrane is applied?

Sufficient dryness is needed for good adhesion. Some materials tolerate a slightly damp surface while others need it fully dry. The surface is checked before work starts, and if visible moisture is present it is left long enough before the membrane is applied. We make this clear when the job is agreed.

Nearby areas

Bathroom waterproofing before tiling near Ash Shayyit

If the site is outside Ash Shayyit, the same service is available in Al Mahawa, Umm ash Shifallah and Khubayra'.

Other services in the area

More services in Ash Shayyit

Worker applying the white insulation layer on a villa roof by the sea

We start with you in Ash Shayyit
with one call

Call us or send photos of the bathroom and the floor on WhatsApp, and we take it from there.

+966 54 311 2066
Call nowWhatsApp