Abraj Al AzlContracting
Call العربية
Screeded bathroom with a continuous grey membrane up the wall base

Bathroom waterproofing before tiling in Ash Shamiyah

Waterproof before you tile

A continuous waterproof membrane on the bathroom floor and wet-area walls, before adhesive and tiles go on

+966 54 311 2066
The service in your area

Bathroom waterproofing before tiling in Ash Shamiyah

Bathroom waterproofing before tiling in Ash Shamiyah starts with a photo message or WhatsApp call. The village has houses in varied designs, and a new bathroom needs a waterproof membrane before tiling, while an older one may face leaks beneath the floor.

Ash Shamiyah spreads across scattered houses and villas of different ages, many needing updates. A modern bathroom benefits from complete waterproofing on the floor and wet walls before tiles are adhered, ensuring protection from leaks into adjacent walls and foundations. An older bathroom or one with existing leaks may show damp in an adjoining room or at the base, making new waterproofing before retiling necessary. Photos reveal the extent of damage and the suitable solution.

  • Ash Shamiyah is a village in the Eastern Province, close to Ash Shihiyah, Al Wahah and Al Majd.
  • A bathroom without waterproofing may leave damp marks in adjoining walls over time.
What the service includes

What the service covers in Ash Shamiyah

  • Cleaning the surface, removing loose parts and treating hairline cracks
  • Checking the floor, the render, the corners, the drain outlet and pipe sleeves
  • Sealing around the drain outlet, the door threshold and all pipe sleeves
  • Applying the membrane over the full floor and up the walls in the wet zone
How we work

From first contact to the finished job in Ash Shamiyah

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the walls, the drain outlet and the door threshold, so we can read the surface and decide the right material and treatment.

2

Prepare the surface

The floor and render are cleaned of dust and loose parts, hairline cracks, joints and corners are treated, and pipe sleeves and the drain outlet are sealed before anything else.

3

Apply the membrane

The layer covers the full floor, rises on the walls in the shower and basin area, is worked carefully into the corners and closes around the drain outlet and the door threshold. The material chosen depends on the surface and its condition.

4

Dry, then tiling begins

The membrane is left to dry and cure before tile adhesive and tiles go on, so it is not stressed or wetted from above before it is fully ready.

What sets us apart

Why Abraj Al Azl?

Sealed before it is closedOnce tiled, the membrane cannot be reached, so getting it right before tiling matters far more than any repair afterwards.

We serve Ash Shamiyah and around itIncluding Ash Shihiyah, Al Wahah (near Ash Shihiyah) and Al Majd, as part of our work across the Eastern Province.

Your request from Ash Shamiyah comes to usCall or WhatsApp on one number, and we answer you ourselves.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing
White insulated dome on a roof among the houses
White stepped dome on an insulated roof above a street

Customer reviews

What our customers said

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

Real Google reviews, shown exactly as their authors wrote them.

Questions

Questions about bathroom waterproofing before tiling in Ash Shamiyah

Is waterproofing before tiling better than re-waterproofing old tiles?

Yes, waterproofing before tiling offers complete and continuous protection. Re-sealing over old tiles is less effective and shorter-lived.

Can a bathroom in an old house in Ash Shamiyah be waterproofed without breaking walls?

If tiles are present, they can be removed and new waterproofing laid. If there are no leak signs on external walls, no additional breaking or demolition is needed.

What decides the cost of waterproofing a bathroom before tiling?

The floor area and how high the layer runs up the walls, the condition of the render, the number of cracks, corners and pipe sleeves, and the material that suits the surface. Send photos and rough dimensions on WhatsApp, tell us about the project, and we will explain the treatment needed.

How high up the wall does the membrane go?

It depends on the bathroom layout and where the showerhead and basin sit. In the shower area the layer rises to cover the full wet zone, and at the other walls it turns up a safe distance above the floor. We set the height after seeing the photos and the layout.

What is the difference between a cementitious coating and a liquid membrane in a bathroom?

The cementitious coating bonds firmly to the concrete slab and the wall and suits flat regular surfaces. The liquid membrane is brushed on and follows corners and detailed areas easily. The choice between them depends on the surface and the bathroom layout, and we decide after seeing the photos.

Do you offer bathroom waterproofing before tiling in Ash Shamiyah?

Yes. Ash Shamiyah is within our service area in the Eastern Province, and we also work in Ash Shihiyah, Al Wahah (near Ash Shihiyah) and Al Majd. Call us or send photos of the spot on WhatsApp.

Nearby areas

The same service in nearby areas

Nearby areas we also cover: Ash Shihiyah, Al Wahah (near Ash Shihiyah) and Al Majd.

Other services in the area

More services in Ash Shamiyah

Worker applying the white insulation layer on a villa roof by the sea

We start with you in Ash Shamiyah
with one call

Call us or send photos of the bathroom and the floor on WhatsApp, and we take it from there.

+966 54 311 2066
Call nowWhatsApp