Abraj Al AzlContracting
Call العربية
Screeded bathroom with a continuous grey membrane up the wall base

Bathroom waterproofing before tiling in As Suayyirah

Waterproof before you tile

A continuous waterproof membrane on the bathroom floor and wet-area walls, before adhesive and tiles go on

+966 54 311 2066
The service in your area

Bathroom waterproofing before tiling in As Suayyirah

Bathroom waterproofing before tiling in As Suayyirah starts with a photo of the floor and wet walls sent by call or WhatsApp. Villages contain houses and villas with varied bathroom layouts, and the waterproof membrane protects the concrete before adhesive and tiles are laid.

As Suayyirah comprises houses and villas, some older and some newly built, each with a bathroom floor and walls needing water protection before tiling. Water from daily use presses against the concrete and may cause dampness or leaks if not properly waterproofed. The resistant membrane stops that water reaching the layers beneath. Photos show the surface condition and help choose the right thickness and material.

  • As Suayyirah is a village in the Eastern Province, close to Khubayra', Ar Rabie and Ghirnatah, with houses and villas of varied sizes.
  • Bathrooms in houses and villas are prone to water leaks if not waterproofed before tiling.
What the service includes

What we do for you in As Suayyirah

  • Sealing around the drain outlet, the door threshold and all pipe sleeves
  • Leaving the membrane to dry and cure before adhesive and tiling begin
  • Forming and treating the floor-to-wall corners before the main layer
  • Cleaning the surface, removing loose parts and treating hairline cracks
How we work

This is how we work in As Suayyirah

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the walls, the drain outlet and the door threshold, so we can read the surface and decide the right material and treatment.

2

Prepare the surface

The floor and render are cleaned of dust and loose parts, hairline cracks, joints and corners are treated, and pipe sleeves and the drain outlet are sealed before anything else.

3

Apply the membrane

The layer covers the full floor, rises on the walls in the shower and basin area, is worked carefully into the corners and closes around the drain outlet and the door threshold. The material chosen depends on the surface and its condition.

4

Dry, then tiling begins

The membrane is left to dry and cure before tile adhesive and tiles go on, so it is not stressed or wetted from above before it is fully ready.

What sets us apart

Why Abraj Al Azl?

Corners and the drain get first attentionThe floor-to-wall corner and the area around the drain outlet are where most leaks begin, and these are treated carefully before the main layer goes on.

As Suayyirah is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

Bathroom waterproofing before tiling in As SuayyirahWe choose the method and the materials once we know the condition of the spot.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing
White insulated dome on a roof among the houses
White stepped dome on an insulated roof above a street

Customer reviews

What our customers said

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

Real Google reviews, shown exactly as their authors wrote them.

Questions

Before you book bathroom waterproofing before tiling in As Suayyirah

Is the waterproof membrane necessary for every bathroom in As Suayyirah?

Yes, because daily water exposure stresses the concrete. The membrane protects the walls and foundation from leaks and dampness, especially if the bathroom is next to a bedroom or living room.

How long must waterproofing cure before tiling starts?

That depends on the material used and conditions around it. The photos and our call will tell you the time we need, and we will tell you when tiling can begin.

What should I send you from As Suayyirah?

Send clear photos of the spot and a short description of the problem on WhatsApp, mention that you are in As Suayyirah, and we will work out the next step with you.

Can the membrane go straight over the render?

It can, if the render is firm, clean and free of loose parts and cracks. If the render is weak or hollow it is removed or treated first, because the waterproof layer cannot compensate for an unsound surface beneath it.

What decides the cost of waterproofing a bathroom before tiling?

The floor area and how high the layer runs up the walls, the condition of the render, the number of cracks, corners and pipe sleeves, and the material that suits the surface. Send photos and rough dimensions on WhatsApp, tell us about the project, and we will explain the treatment needed.

How is the corner between the floor and the wall sealed?

The corner is the most vulnerable point because it joins two surfaces at a right angle. It is filled and formed with a suitable compound before the waterproof layer is turned up over it, so the layer stays continuous rather than cracking at the bend.

Nearby areas

Areas near As Suayyirah

We also offer bathroom waterproofing before tiling in Khubayra', Ar Rabie (near Qaryah al Ulya) and Ghirnatah (near Qaryah al Ulya), among the closest areas to As Suayyirah.

Other services in the area

More services in As Suayyirah

Worker applying the white insulation layer on a villa roof by the sea

Bathroom waterproofing before tiling in As Suayyirah?
Call us now

One number for calls and WhatsApp, and you talk to us directly.

+966 54 311 2066
Call nowWhatsApp