Abraj Al AzlContracting
Call العربية
Screeded bathroom with a continuous grey membrane up the wall base

Bathroom waterproofing before tiling in Ar Rawdah (near Qaryah al Ulya)

Waterproof before you tile

A continuous waterproof membrane on the bathroom floor and wet-area walls, before adhesive and tiles go on

+966 54 311 2066
The service in your area

Bathroom waterproofing before tiling in Ar Rawdah (near Qaryah al Ulya)

Bathroom waterproofing before tiling in Ar Rawdah begins with WhatsApp photos of the floor, walls and any damp marks. The area has villas and homes of varying ages, with many bathrooms needing water protection before final tiling.

Bathrooms in this Ar Rawdah area vary between modern villas and older homes, each requiring careful surface inspection before starting. Concrete walls and floors may retain moisture due to humid coastal climate, which can affect membrane effectiveness if not dried properly first. After cleaning and drying the surface, the membrane is laid on all floor and wet walls to a set height, ensuring water does not reach the layers below. Photos show the current condition and help choose the right method.

  • Ar Rawdah is a district in the Eastern Province, close to Qaryah al Ulya, Az Zuhur and Al Muruj, with varied villas and homes.
  • Bathrooms in homes and villas need a reliable waterproof membrane to prevent water leaking into foundations and surrounding walls.
What the service includes

The main items of bathroom waterproofing before tiling in Ar Rawdah (near Qaryah al Ulya)

  • Applying the membrane over the full floor and up the walls in the wet zone
  • Forming and treating the floor-to-wall corners before the main layer
  • Checking the floor, the render, the corners, the drain outlet and pipe sleeves
  • Leaving the membrane to dry and cure before adhesive and tiling begin
How we work

The steps of bathroom waterproofing before tiling in Ar Rawdah (near Qaryah al Ulya)

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the walls, the drain outlet and the door threshold, so we can read the surface and decide the right material and treatment.

2

Prepare the surface

The floor and render are cleaned of dust and loose parts, hairline cracks, joints and corners are treated, and pipe sleeves and the drain outlet are sealed before anything else.

3

Apply the membrane

The layer covers the full floor, rises on the walls in the shower and basin area, is worked carefully into the corners and closes around the drain outlet and the door threshold. The material chosen depends on the surface and its condition.

4

Dry, then tiling begins

The membrane is left to dry and cure before tile adhesive and tiles go on, so it is not stressed or wetted from above before it is fully ready.

What sets us apart

Why Abraj Al Azl?

Corners and the drain get first attentionThe floor-to-wall corner and the area around the drain outlet are where most leaks begin, and these are treated carefully before the main layer goes on.

Your request from Ar Rawdah (near Qaryah al Ulya) comes to usCall or WhatsApp on one number, and we answer you ourselves.

Bathroom waterproofing before tiling in Ar Rawdah (near Qaryah al Ulya)We choose the method and the materials once we know the condition of the spot.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing
White insulated dome on a roof among the houses
White stepped dome on an insulated roof above a street

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

Real Google reviews, shown exactly as their authors wrote them.

Questions

Common questions on bathroom waterproofing before tiling in Ar Rawdah (near Qaryah al Ulya)

How many times should the waterproof membrane be applied to one bathroom?

This depends on the surface condition and material type. Some cases need one strong coat, others may benefit from an extra layer. Photos will help us decide what suits your situation.

Can the bathroom be used right after the membrane is applied?

No, the membrane must dry completely before water is used or tiles are laid. We will tell you the right timing after seeing the photos and knowing the material type.

What decides the cost of waterproofing a bathroom before tiling?

The floor area and how high the layer runs up the walls, the condition of the render, the number of cracks, corners and pipe sleeves, and the material that suits the surface. Send photos and rough dimensions on WhatsApp, tell us about the project, and we will explain the treatment needed.

How high up the wall does the membrane go?

It depends on the bathroom layout and where the showerhead and basin sit. In the shower area the layer rises to cover the full wet zone, and at the other walls it turns up a safe distance above the floor. We set the height after seeing the photos and the layout.

What should I send you from Ar Rawdah (near Qaryah al Ulya)?

Send clear photos of the spot and a short description of the problem on WhatsApp, mention that you are in Ar Rawdah (near Qaryah al Ulya), and we will work out the next step with you.

Can the membrane go straight over the render?

It can, if the render is firm, clean and free of loose parts and cracks. If the render is weak or hollow it is removed or treated first, because the waterproof layer cannot compensate for an unsound surface beneath it.

Nearby areas

Bathroom waterproofing before tiling near Ar Rawdah (near Qaryah al Ulya)

If the site is outside Ar Rawdah (near Qaryah al Ulya), the same service is available in Qaryah al Ulya, Az Zuhur (near Qaryah al Ulya) and Al Muruj (near Qaryah al Ulya).

Other services in the area

More services in Ar Rawdah (near Qaryah al Ulya)

Worker applying the white insulation layer on a villa roof by the sea

We start with you in Ar Rawdah (near Qaryah al Ulya)
with one call

One number for calls and WhatsApp, and you talk to us directly.

+966 54 311 2066
Call nowWhatsApp