Abraj Al AzlContracting
Call العربية
Screeded bathroom with a continuous grey membrane up the wall base

Bathroom waterproofing before tiling in Ar Rakah Ash Shamaliyah

Waterproof before you tile

A continuous waterproof membrane on the bathroom floor and wet-area walls, before adhesive and tiles go on

+966 54 311 2066
The service in your area

Bathroom waterproofing before tiling in Ar Rakah Ash Shamaliyah

Bathroom waterproofing before tiling in Ar Rakah Ash Shamaliyah starts with photos of the floor and wet walls sent by call or WhatsApp. A waterproof membrane goes on the concrete surface before the adhesive and tiles, to protect the bathroom from damp and leaks.

Ar Rakah Ash Shamaliyah consists of villas and apartment buildings, with bathrooms that vary greatly in size and age. A small bathroom in an older villa may show damp in a corner or around a drain, while a larger one in a new building may need full waterproofing before tiling starts. Spray water and steam dampen the walls and floor daily, and a waterproof membrane stands between them and the concrete. Photos show the surface condition and damp level before the method is chosen.

  • Ar Rakah Ash Shamaliyah is a district in the Eastern Province, close to Sports City, Al Qashlah and As Safa, with villas and apartment buildings.
  • A bathroom faces constant moisture from hot water and steam, so the waterproofing must be continuous across the entire floor and wet walls.
What the service includes

What the service covers in Ar Rakah Ash Shamaliyah

  • Cleaning the surface, removing loose parts and treating hairline cracks
  • Checking the floor, the render, the corners, the drain outlet and pipe sleeves
  • Applying the membrane over the full floor and up the walls in the wet zone
  • Leaving the membrane to dry and cure before adhesive and tiling begin
How we work

How we carry out bathroom waterproofing before tiling in Ar Rakah Ash Shamaliyah

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the walls, the drain outlet and the door threshold, so we can read the surface and decide the right material and treatment.

2

Prepare the surface

The floor and render are cleaned of dust and loose parts, hairline cracks, joints and corners are treated, and pipe sleeves and the drain outlet are sealed before anything else.

3

Apply the membrane

The layer covers the full floor, rises on the walls in the shower and basin area, is worked carefully into the corners and closes around the drain outlet and the door threshold. The material chosen depends on the surface and its condition.

4

Dry, then tiling begins

The membrane is left to dry and cure before tile adhesive and tiles go on, so it is not stressed or wetted from above before it is fully ready.

What sets us apart

Why Abraj Al Azl?

Corners and the drain get first attentionThe floor-to-wall corner and the area around the drain outlet are where most leaks begin, and these are treated carefully before the main layer goes on.

Start from Ar Rakah Ash Shamaliyah with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

Ar Rakah Ash Shamaliyah is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing
White insulated dome on a roof among the houses
White stepped dome on an insulated roof above a street

Customer reviews

What our customers said

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

Real Google reviews, shown exactly as their authors wrote them.

Questions

What customers ask in Ar Rakah Ash Shamaliyah

Must old tiles be removed before waterproofing a bathroom in Ar Rakah Ash Shamaliyah?

If the current tiles are sound and show no damp or cracks, removal may not be needed; but photos will show the state of the surface beneath. If damp has reached the concrete, removal is necessary to apply the waterproof membrane properly.

How long does it take to waterproof a bathroom before tiling?

The time depends on the bathroom size and the state of the concrete surface. The photos you send will help us plan the steps needed and arrange the schedule with you.

Can the membrane go straight over the render?

It can, if the render is firm, clean and free of loose parts and cracks. If the render is weak or hollow it is removed or treated first, because the waterproof layer cannot compensate for an unsound surface beneath it.

Do you offer bathroom waterproofing before tiling in Ar Rakah Ash Shamaliyah?

Yes. Ar Rakah Ash Shamaliyah is within our service area in the Eastern Province, and we also work in Sports City (near Al Khobar), Al Qashlah and As Safa. Call us or send photos of the spot on WhatsApp.

Does the surface need to be completely dry before the membrane is applied?

Sufficient dryness is needed for good adhesion. Some materials tolerate a slightly damp surface while others need it fully dry. The surface is checked before work starts, and if visible moisture is present it is left long enough before the membrane is applied. We make this clear when the job is agreed.

What decides the cost of waterproofing a bathroom before tiling?

The floor area and how high the layer runs up the walls, the condition of the render, the number of cracks, corners and pipe sleeves, and the material that suits the surface. Send photos and rough dimensions on WhatsApp, tell us about the project, and we will explain the treatment needed.

Nearby areas

Bathroom waterproofing before tiling near Ar Rakah Ash Shamaliyah

Nearby areas we also cover: Sports City (near Al Khobar), Al Qashlah and As Safa.

Other services in the area

More services in Ar Rakah Ash Shamaliyah

Worker applying the white insulation layer on a villa roof by the sea

Tell us about your site in Ar Rakah Ash Shamaliyah
and we will plan the next step with you

One number for calls and WhatsApp, and you talk to us directly.

+966 54 311 2066
Call nowWhatsApp