Abraj Al AzlContracting
Call العربية
Screeded bathroom with a continuous grey membrane up the wall base

Bathroom waterproofing before tiling in Ar Rabie (near Nuayriyah)

Waterproof before you tile

A continuous waterproof membrane on the bathroom floor and wet-area walls, before adhesive and tiles go on

+966 54 311 2066
The service in your area

Bathroom waterproofing before tiling in Ar Rabie (near Nuayriyah)

Bathroom waterproofing in Ar Rabie begins with a WhatsApp message containing photos of the bathroom, surroundings and pipe entry. The district has houses and villas of various sizes, each bathroom having different conditions based on building age and interior design.

Rabie has newer houses and larger villas, with bathrooms ranging from modern to those needing renovation. A bathroom needing renovation may have a cracked or sloped floor and walls stuck with old tiles that may hide existing damp. A modern bathroom may only need the membrane without extra floor preparation. Coastal humidity means the membrane must be continuous and thick enough. Photos show surface condition and whether preparatory work is needed before the membrane.

  • Ar Rabie is a district in the Eastern Province near Al Khalij, Al Muruj and Al Aziziyah, with houses and villas of varying sizes.
  • A bathroom may look new after retiling but if there is no waterproof membrane under the tiles, damp problems may appear after some time.
What the service includes

The main items of bathroom waterproofing before tiling in Ar Rabie (near Nuayriyah)

  • Cleaning the surface, removing loose parts and treating hairline cracks
  • Forming and treating the floor-to-wall corners before the main layer
  • Sealing around the drain outlet, the door threshold and all pipe sleeves
  • Leaving the membrane to dry and cure before adhesive and tiling begin
How we work

How we carry out bathroom waterproofing before tiling in Ar Rabie (near Nuayriyah)

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the walls, the drain outlet and the door threshold, so we can read the surface and decide the right material and treatment.

2

Prepare the surface

The floor and render are cleaned of dust and loose parts, hairline cracks, joints and corners are treated, and pipe sleeves and the drain outlet are sealed before anything else.

3

Apply the membrane

The layer covers the full floor, rises on the walls in the shower and basin area, is worked carefully into the corners and closes around the drain outlet and the door threshold. The material chosen depends on the surface and its condition.

4

Dry, then tiling begins

The membrane is left to dry and cure before tile adhesive and tiles go on, so it is not stressed or wetted from above before it is fully ready.

What sets us apart

Why Abraj Al Azl?

Sealed before it is closedOnce tiled, the membrane cannot be reached, so getting it right before tiling matters far more than any repair afterwards.

Ar Rabie (near Nuayriyah) is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

Your request from Ar Rabie (near Nuayriyah) comes to usCall or WhatsApp on one number, and we answer you ourselves.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing
White insulated dome on a roof among the houses
White stepped dome on an insulated roof above a street

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

Real Google reviews, shown exactly as their authors wrote them.

Questions

What customers ask in Ar Rabie (near Nuayriyah)

Must old tiles be removed before applying the waterproof membrane in Ar Rabie?

If old tiles are firmly stuck and the mortar beneath is sound, we may apply the membrane directly. But if there is loose tiles or a hollow sound when tapped, the tiles must be removed first. Photos show the condition and help us decide.

Does a waterproof membrane solve damp that already exists in an old bathroom in Ar Rabie?

The membrane stops new moisture from current and future water, but existing damp in the walls must dry first. If photos show current damp, we will tell you what treatment is needed before the membrane is applied.

What is the difference between a cementitious coating and a liquid membrane in a bathroom?

The cementitious coating bonds firmly to the concrete slab and the wall and suits flat regular surfaces. The liquid membrane is brushed on and follows corners and detailed areas easily. The choice between them depends on the surface and the bathroom layout, and we decide after seeing the photos.

Can the membrane go straight over the render?

It can, if the render is firm, clean and free of loose parts and cracks. If the render is weak or hollow it is removed or treated first, because the waterproof layer cannot compensate for an unsound surface beneath it.

Is Ar Rabie (near Nuayriyah) within your service area?

Yes, Ar Rabie (near Nuayriyah) is one of the areas we work in, as are Al Khalij (near Nuayriyah), Al Muruj (near Nuayriyah) and Al Aziziyah (near Nuayriyah). To start, call us or message us on WhatsApp.

How high up the wall does the membrane go?

It depends on the bathroom layout and where the showerhead and basin sit. In the shower area the layer rises to cover the full wet zone, and at the other walls it turns up a safe distance above the floor. We set the height after seeing the photos and the layout.

Nearby areas

Areas near Ar Rabie (near Nuayriyah)

If the site is outside Ar Rabie (near Nuayriyah), the same service is available in Al Khalij (near Nuayriyah), Al Muruj (near Nuayriyah) and Al Aziziyah (near Nuayriyah).

Other services in the area

More services in Ar Rabie (near Nuayriyah)

Worker applying the white insulation layer on a villa roof by the sea

Your first step in Ar Rabie (near Nuayriyah):
a call or a WhatsApp message

Describe the problem and where it is in Ar Rabie (near Nuayriyah), and we will tell you the right next step.

+966 54 311 2066
Call nowWhatsApp