Abraj Al AzlContracting
Call العربية
Screeded bathroom with a continuous grey membrane up the wall base

Bathroom waterproofing before tiling in Ar Rabie (near Hafar Al-Batin)

Waterproof before you tile

A continuous waterproof membrane on the bathroom floor and wet-area walls, before adhesive and tiles go on

+966 54 311 2066
The service in your area

Bathroom waterproofing before tiling in Ar Rabie (near Hafar Al-Batin)

Bathroom waterproofing before tiling in Ar Rabie starts with WhatsApp photos of the floor and wet walls. The area has small industrial and residential buildings where bathrooms face constant moisture and potential leaks from pipes and joints.

Buildings in Ar Rabie are mostly small and relatively old, with tight bathrooms and multiple pipe joints. Moisture accumulates in corners and edges, and a slightly raised floor causes water to pool around the foundations. The waterproof membrane must cover the floor and extend up the walls before tiling, protecting the structure from seepage and cracking. Photos show the wall condition and existing pipes so we can choose the best method for that space.

  • Ar Rabie is a district in Al-Ahsa near the Industrial area, Ar Rawdah and Fulaij, containing small residential and industrial buildings.
  • Small bathrooms in older buildings need complete waterproofing before tiling because moisture easily seeps into walls and foundations.
What the service includes

The main items of bathroom waterproofing before tiling in Ar Rabie (near Hafar Al-Batin)

  • Cleaning the surface, removing loose parts and treating hairline cracks
  • Checking the floor, the render, the corners, the drain outlet and pipe sleeves
  • Leaving the membrane to dry and cure before adhesive and tiling begin
  • Applying the membrane over the full floor and up the walls in the wet zone
How we work

The steps of bathroom waterproofing before tiling in Ar Rabie (near Hafar Al-Batin)

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the walls, the drain outlet and the door threshold, so we can read the surface and decide the right material and treatment.

2

Prepare the surface

The floor and render are cleaned of dust and loose parts, hairline cracks, joints and corners are treated, and pipe sleeves and the drain outlet are sealed before anything else.

3

Apply the membrane

The layer covers the full floor, rises on the walls in the shower and basin area, is worked carefully into the corners and closes around the drain outlet and the door threshold. The material chosen depends on the surface and its condition.

4

Dry, then tiling begins

The membrane is left to dry and cure before tile adhesive and tiles go on, so it is not stressed or wetted from above before it is fully ready.

What sets us apart

Why Abraj Al Azl?

Sealed before it is closedOnce tiled, the membrane cannot be reached, so getting it right before tiling matters far more than any repair afterwards.

Your request from Ar Rabie (near Hafar Al-Batin) comes to usCall or WhatsApp on one number, and we answer you ourselves.

Bathroom waterproofing before tiling in Ar Rabie (near Hafar Al-Batin)We choose the method and the materials once we know the condition of the spot.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing
White insulated dome on a roof among the houses
White stepped dome on an insulated roof above a street

Customer reviews

What our customers said

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

Real Google reviews, shown exactly as their authors wrote them.

Questions

What customers ask in Ar Rabie (near Hafar Al-Batin)

Must old pipes be removed before waterproofing a bathroom in Ar Rabie?

Not always; it depends on their condition. If they are sound and properly placed, the bathroom can be waterproofed carefully around them. Send photos of the pipes and joints so we can decide if they need repair first.

How thick should the waterproof membrane be in a bathroom before tiling?

Thickness is determined by the surface condition, available materials and the bathroom's location. Photos help us choose the right method to ensure complete protection from moisture and leaks.

What decides the cost of waterproofing a bathroom before tiling?

The floor area and how high the layer runs up the walls, the condition of the render, the number of cracks, corners and pipe sleeves, and the material that suits the surface. Send photos and rough dimensions on WhatsApp, tell us about the project, and we will explain the treatment needed.

How high up the wall does the membrane go?

It depends on the bathroom layout and where the showerhead and basin sit. In the shower area the layer rises to cover the full wet zone, and at the other walls it turns up a safe distance above the floor. We set the height after seeing the photos and the layout.

How is the corner between the floor and the wall sealed?

The corner is the most vulnerable point because it joins two surfaces at a right angle. It is filled and formed with a suitable compound before the waterproof layer is turned up over it, so the layer stays continuous rather than cracking at the bend.

What should I send you from Ar Rabie (near Hafar Al-Batin)?

Send clear photos of the spot and a short description of the problem on WhatsApp, mention that you are in Ar Rabie (near Hafar Al-Batin), and we will work out the next step with you.

Nearby areas

We also offer it in neighbouring areas

We also work near Ar Rabie (near Hafar Al-Batin), in Industrial (near Hafar Al-Batin), Ar Rawdah (near Hafar Al-Batin) and Fulaij.

Other services in the area

More services in Ar Rabie (near Hafar Al-Batin)

Worker applying the white insulation layer on a villa roof by the sea

Your first step in Ar Rabie (near Hafar Al-Batin):
a call or a WhatsApp message

One number for calls and WhatsApp, and you talk to us directly.

+966 54 311 2066
Call nowWhatsApp