
Bathroom waterproofing before tiling in An Narjis
Bathroom waterproofing before tiling in An Narjis begins by sending a bathroom photo via WhatsApp or call. The district contains villas and apartment buildings, where bathrooms need a continuous waterproof membrane before tiling to protect the structure from damp and seepage.
An Narjis has villas of varying sizes and low-rise apartment buildings. Villa bathrooms may be relatively spacious and include separate shower areas and spa tubs, while apartment bathrooms are smaller and confined to limited space. All these bathrooms face constant moisture from running water and steam, and the waterproof membrane protects walls and floors from seepage. We examine photos to understand bathroom layout and which areas need deeper waterproofing.
- An Narjis is a district in the Eastern Province, close to Al Awwamiyah, Az Zarah and Ath Thuraiya, containing villas and apartment buildings.
- Spacious bathrooms in villas need a membrane covering larger areas, and precision at joints and corners ensures no seepage occurs.
What the service covers in An Narjis
- Applying the membrane over the full floor and up the walls in the wet zone
- Sealing around the drain outlet, the door threshold and all pipe sleeves
- Forming and treating the floor-to-wall corners before the main layer
- Cleaning the surface, removing loose parts and treating hairline cracks
This is how we work in An Narjis
Send photos of the bathroom
On WhatsApp: photos of the floor, the walls, the drain outlet and the door threshold, so we can read the surface and decide the right material and treatment.
Prepare the surface
The floor and render are cleaned of dust and loose parts, hairline cracks, joints and corners are treated, and pipe sleeves and the drain outlet are sealed before anything else.
Apply the membrane
The layer covers the full floor, rises on the walls in the shower and basin area, is worked carefully into the corners and closes around the drain outlet and the door threshold. The material chosen depends on the surface and its condition.
Dry, then tiling begins
The membrane is left to dry and cure before tile adhesive and tiles go on, so it is not stressed or wetted from above before it is fully ready.
Why Abraj Al Azl?
Corners and the drain get first attentionThe floor-to-wall corner and the area around the drain outlet are where most leaks begin, and these are treated carefully before the main layer goes on.
An Narjis is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.
Bathroom waterproofing before tiling in An NarjisWe choose the method and the materials once we know the condition of the spot.
We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.
Some of our work

















What our customers said
ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب
ماشاء الله تبارك الرحمن عزل اسطح ممتاز
اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم
Real Google reviews, shown exactly as their authors wrote them.
What customers ask in An Narjis
Does waterproofing differ between a villa bathroom and an apartment bathroom in An Narjis?
The basic method is the same, but a villa bathroom may be larger and need more membrane coverage. Photos show bathroom size and which areas need complete coverage.
Does a bathroom with a spa tub need extra waterproofing?
A spa tub may cause greater moisture as water can spill around it. We cover a larger area round the tub and the surrounding floor. Photos help us assess the tub location and protection needed.
What decides the cost of waterproofing a bathroom before tiling?
The floor area and how high the layer runs up the walls, the condition of the render, the number of cracks, corners and pipe sleeves, and the material that suits the surface. Send photos and rough dimensions on WhatsApp, tell us about the project, and we will explain the treatment needed.
How high up the wall does the membrane go?
It depends on the bathroom layout and where the showerhead and basin sit. In the shower area the layer rises to cover the full wet zone, and at the other walls it turns up a safe distance above the floor. We set the height after seeing the photos and the layout.
Can the membrane go straight over the render?
It can, if the render is firm, clean and free of loose parts and cracks. If the render is weak or hollow it is removed or treated first, because the waterproof layer cannot compensate for an unsound surface beneath it.
Do you cover An Narjis?
Yes. We serve An Narjis and nearby areas such as Al Awwamiyah, Az Zarah and Ath Thuraiya, from our base in Al Uwaymiriyah, Hofuf. Start with a call or a WhatsApp message.
Bathroom waterproofing before tiling near An Narjis
We also work near An Narjis, in Al Awwamiyah, Az Zarah and Ath Thuraiya.
More services in An Narjis



