Abraj Al AzlContracting
Call العربية
Screeded bathroom with a continuous grey membrane up the wall base

Bathroom waterproofing before tiling in Al Yarmuk (near Ghizlan)

Waterproof before you tile

A continuous waterproof membrane on the bathroom floor and wet-area walls, before adhesive and tiles go on

+966 54 311 2066
The service in your area

Bathroom waterproofing before tiling in Al Yarmuk (near Ghizlan)

Bathroom waterproofing before tiling in Al Yarmuk begins with a message containing floor and wall photos sent by WhatsApp or call. The district has residential buildings of varied size and age, and each bathroom needs tight water protection over the wet surface before tiles are placed.

Bathrooms in Al Yarmuk range from small ones in older flats to larger ones in modern buildings. Floors may be slightly uneven in older buildings, and walls may have fine cracks or fractures. The waterproof membrane must first clean the surface of dust, dirt and debris, then bond firmly to every part. Photos help us assess whether the surface needs repair or levelling before the membrane is applied.

  • Al Yarmuk is a district in the Eastern Province near Al Murjan, Industrial Arifi and Al Bustan, with multiple residential buildings.
  • A bathroom in an older building may have damp in the walls, which can affect how well the waterproof membrane sticks to the surface.
What the service includes

The main items of bathroom waterproofing before tiling in Al Yarmuk (near Ghizlan)

  • Checking the floor, the render, the corners, the drain outlet and pipe sleeves
  • Sealing around the drain outlet, the door threshold and all pipe sleeves
  • Forming and treating the floor-to-wall corners before the main layer
  • Cleaning the surface, removing loose parts and treating hairline cracks
How we work

The steps of bathroom waterproofing before tiling in Al Yarmuk (near Ghizlan)

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the walls, the drain outlet and the door threshold, so we can read the surface and decide the right material and treatment.

2

Prepare the surface

The floor and render are cleaned of dust and loose parts, hairline cracks, joints and corners are treated, and pipe sleeves and the drain outlet are sealed before anything else.

3

Apply the membrane

The layer covers the full floor, rises on the walls in the shower and basin area, is worked carefully into the corners and closes around the drain outlet and the door threshold. The material chosen depends on the surface and its condition.

4

Dry, then tiling begins

The membrane is left to dry and cure before tile adhesive and tiles go on, so it is not stressed or wetted from above before it is fully ready.

What sets us apart

Why Abraj Al Azl?

Sealed before it is closedOnce tiled, the membrane cannot be reached, so getting it right before tiling matters far more than any repair afterwards.

Your request from Al Yarmuk (near Ghizlan) comes to usCall or WhatsApp on one number, and we answer you ourselves.

Start from Al Yarmuk (near Ghizlan) with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing
White insulated dome on a roof among the houses
White stepped dome on an insulated roof above a street

Customer reviews

What our customers said

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

Real Google reviews, shown exactly as their authors wrote them.

Questions

Common questions on bathroom waterproofing before tiling in Al Yarmuk (near Ghizlan)

Does damp in old bathroom walls prevent membrane application in Al Yarmuk?

Severe damp can affect the membrane's adhesion. The walls may need drying first or the damp treated at its source. Photos will show us the damp level and we will tell you what steps are needed.

Does a bathroom need special ventilation after the membrane is applied in Al Yarmuk?

Good ventilation matters for any bathroom after application, so the membrane dries properly and moisture does not build up. A window or fan is usually there, but make sure air flows in and out easily.

What is the difference between a cementitious coating and a liquid membrane in a bathroom?

The cementitious coating bonds firmly to the concrete slab and the wall and suits flat regular surfaces. The liquid membrane is brushed on and follows corners and detailed areas easily. The choice between them depends on the surface and the bathroom layout, and we decide after seeing the photos.

What decides the cost of waterproofing a bathroom before tiling?

The floor area and how high the layer runs up the walls, the condition of the render, the number of cracks, corners and pipe sleeves, and the material that suits the surface. Send photos and rough dimensions on WhatsApp, tell us about the project, and we will explain the treatment needed.

How high up the wall does the membrane go?

It depends on the bathroom layout and where the showerhead and basin sit. In the shower area the layer rises to cover the full wet zone, and at the other walls it turns up a safe distance above the floor. We set the height after seeing the photos and the layout.

Do you cover Al Yarmuk (near Ghizlan)?

Yes. We serve Al Yarmuk (near Ghizlan) and nearby areas such as Al Murjan (near Ghizlan), Industrial Arifi and Al Bustan (near Ghizlan), from our base in Al Uwaymiriyah, Hofuf. Start with a call or a WhatsApp message.

Nearby areas

Bathroom waterproofing before tiling near Al Yarmuk (near Ghizlan)

We also work near Al Yarmuk (near Ghizlan), in Al Murjan (near Ghizlan), Industrial Arifi and Al Bustan (near Ghizlan).

Other services in the area

More services in Al Yarmuk (near Ghizlan)

Worker applying the white insulation layer on a villa roof by the sea

Tell us about your site in Al Yarmuk (near Ghizlan)
and we will plan the next step with you

One number for calls and WhatsApp, and you talk to us directly.

+966 54 311 2066
Call nowWhatsApp