Abraj Al AzlContracting
Call العربية
Screeded bathroom with a continuous grey membrane up the wall base

Bathroom waterproofing before tiling in Al Wurud (near Ash Shihiyah)

Waterproof before you tile

A continuous waterproof membrane on the bathroom floor and wet-area walls, before adhesive and tiles go on

+966 54 311 2066
The service in your area

Bathroom waterproofing before tiling in Al Wurud (near Ash Shihiyah)

We waterproof bathrooms in Al Wurud before tiling, with a continuous layer over the floor and wet-area walls. Send photos of the bathroom by call or WhatsApp.

Al Wurud is residential, with houses and small multi-storey apartment buildings, some built in an older style. Bathrooms on upper floors carry the weight of water and tile together, so the lining must stay continuous at doorways and drain openings. Photos taken beforehand show which bathrooms need full lining and which only need joint repair.

  • Al Wurud is a residential district in Al-Ahsa, near Al Majd, Al Wahah and Ash Shihiyah.
  • The floor drain is a common leak point in a bathroom, so it is sealed carefully before any other layer.
What the service includes

The bathroom waterproofing before tiling work in Al Wurud (near Ash Shihiyah)

  • Sealing around the drain outlet, the door threshold and all pipe sleeves
  • Checking the floor, the render, the corners, the drain outlet and pipe sleeves
  • Cleaning the surface, removing loose parts and treating hairline cracks
  • Forming and treating the floor-to-wall corners before the main layer
How we work

This is how we work in Al Wurud (near Ash Shihiyah)

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the walls, the drain outlet and the door threshold, so we can read the surface and decide the right material and treatment.

2

Prepare the surface

The floor and render are cleaned of dust and loose parts, hairline cracks, joints and corners are treated, and pipe sleeves and the drain outlet are sealed before anything else.

3

Apply the membrane

The layer covers the full floor, rises on the walls in the shower and basin area, is worked carefully into the corners and closes around the drain outlet and the door threshold. The material chosen depends on the surface and its condition.

4

Dry, then tiling begins

The membrane is left to dry and cure before tile adhesive and tiles go on, so it is not stressed or wetted from above before it is fully ready.

What sets us apart

Why Abraj Al Azl?

Sealed before it is closedOnce tiled, the membrane cannot be reached, so getting it right before tiling matters far more than any repair afterwards.

Bathroom waterproofing before tiling in Al Wurud (near Ash Shihiyah)We choose the method and the materials once we know the condition of the spot.

Start from Al Wurud (near Ash Shihiyah) with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing
White insulated dome on a roof among the houses
White stepped dome on an insulated roof above a street

Customer reviews

What our customers said

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

Real Google reviews, shown exactly as their authors wrote them.

Questions

Questions about bathroom waterproofing before tiling in Al Wurud (near Ash Shihiyah)

Can a bathroom on an upper floor in Al Wurud be lined?

Yes, the lining is applied to the concrete floor of that level after its condition is checked. The photos show whether the floor needs repair first.

Why does the drain opening matter in Al Wurud bathrooms?

It breaks the waterproof layer and needs a tight seal around it. A clear photo of the opening helps judge what is needed.

How high up the wall does the membrane go?

It depends on the bathroom layout and where the showerhead and basin sit. In the shower area the layer rises to cover the full wet zone, and at the other walls it turns up a safe distance above the floor. We set the height after seeing the photos and the layout.

Can the membrane go straight over the render?

It can, if the render is firm, clean and free of loose parts and cracks. If the render is weak or hollow it is removed or treated first, because the waterproof layer cannot compensate for an unsound surface beneath it.

Do you cover Al Wurud (near Ash Shihiyah)?

Yes. We serve Al Wurud (near Ash Shihiyah) and nearby areas such as Al Majd, Al Wahah (near Ash Shihiyah) and Ash Shihiyah, from our base in Al Uwaymiriyah, Hofuf. Start with a call or a WhatsApp message.

What is the difference between a cementitious coating and a liquid membrane in a bathroom?

The cementitious coating bonds firmly to the concrete slab and the wall and suits flat regular surfaces. The liquid membrane is brushed on and follows corners and detailed areas easily. The choice between them depends on the surface and the bathroom layout, and we decide after seeing the photos.

Nearby areas

Areas near Al Wurud (near Ash Shihiyah)

If the site is outside Al Wurud (near Ash Shihiyah), the same service is available in Al Majd, Al Wahah (near Ash Shihiyah) and Ash Shihiyah.

Other services in the area

More services in Al Wurud (near Ash Shihiyah)

Worker applying the white insulation layer on a villa roof by the sea

Tell us about your site in Al Wurud (near Ash Shihiyah)
and we will plan the next step with you

Call us or send photos of the bathroom and the floor on WhatsApp, and we take it from there.

+966 54 311 2066
Call nowWhatsApp