Abraj Al AzlContracting
Call العربية
Screeded bathroom with a continuous grey membrane up the wall base

Bathroom waterproofing before tiling in Al Uwaimiriyah District

Waterproof before you tile

A continuous waterproof membrane on the bathroom floor and wet-area walls, before adhesive and tiles go on

+966 54 311 2066
The service in your area

Bathroom waterproofing before tiling in Al Uwaimiriyah District

Bathroom waterproofing before tiling in Al Uwaimiriyah District starts with WhatsApp photos of the bathroom and damp walls. We apply a continuous waterproof membrane to the floor and walls before tiles are laid, to protect against water seepage and damp.

Al Uwaimiriyah District contains houses and villas, many of which are older and have bathrooms with traditional tiling methods. An older bathroom often shows damp around the walls and floor, especially near joints, corners and seams. Walls carrying a water heater or pipes need extra care. Photos show the damp and how far it has spread so we can choose the right approach before tiling begins.

  • Al Uwaimiriyah District is a residential district in the Eastern Province, near Al Marbidia, Ladhah and Al Mirqab districts.
  • Bathrooms in older homes need full waterproofing because water penetrates aging grout and tiles easily.
What the service includes

What we do for you in Al Uwaimiriyah District

  • Cleaning the surface, removing loose parts and treating hairline cracks
  • Leaving the membrane to dry and cure before adhesive and tiling begin
  • Forming and treating the floor-to-wall corners before the main layer
  • Sealing around the drain outlet, the door threshold and all pipe sleeves
How we work

The steps of bathroom waterproofing before tiling in Al Uwaimiriyah District

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the walls, the drain outlet and the door threshold, so we can read the surface and decide the right material and treatment.

2

Prepare the surface

The floor and render are cleaned of dust and loose parts, hairline cracks, joints and corners are treated, and pipe sleeves and the drain outlet are sealed before anything else.

3

Apply the membrane

The layer covers the full floor, rises on the walls in the shower and basin area, is worked carefully into the corners and closes around the drain outlet and the door threshold. The material chosen depends on the surface and its condition.

4

Dry, then tiling begins

The membrane is left to dry and cure before tile adhesive and tiles go on, so it is not stressed or wetted from above before it is fully ready.

What sets us apart

Why Abraj Al Azl?

Sealed before it is closedOnce tiled, the membrane cannot be reached, so getting it right before tiling matters far more than any repair afterwards.

Al Uwaimiriyah District is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

Your request from Al Uwaimiriyah District comes to usCall or WhatsApp on one number, and we answer you ourselves.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing
White insulated dome on a roof among the houses
White stepped dome on an insulated roof above a street

Customer reviews

What our customers said

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Before you book bathroom waterproofing before tiling in Al Uwaimiriyah District

Can an existing bathroom be waterproofed without breaking out the old tiles?

If the tiles are sound and the damp is only beneath them, it may be possible in some cases, but photos will show whether the tiles are damaged or the grout is loose. We usually advise removing the tiles and laying the waterproof membrane afresh to ensure complete protection.

Do you waterproof bathrooms in villas and houses in Al Uwaimiriyah District?

Yes, we serve Al Uwaimiriyah District. Send us photos of the bathroom and any visible damp patches, and tell us whether the tiles will be replaced or only the damp is being treated.

Do you cover Al Uwaimiriyah District?

Yes. We serve Al Uwaimiriyah District and nearby areas such as Al Marbidia District, Ladhah District and Al Mirqab District, from our base in Al Uwaymiriyah, Hofuf. Start with a call or a WhatsApp message.

How high up the wall does the membrane go?

It depends on the bathroom layout and where the showerhead and basin sit. In the shower area the layer rises to cover the full wet zone, and at the other walls it turns up a safe distance above the floor. We set the height after seeing the photos and the layout.

What decides the cost of waterproofing a bathroom before tiling?

The floor area and how high the layer runs up the walls, the condition of the render, the number of cracks, corners and pipe sleeves, and the material that suits the surface. Send photos and rough dimensions on WhatsApp, tell us about the project, and we will explain the treatment needed.

Can the membrane go straight over the render?

It can, if the render is firm, clean and free of loose parts and cracks. If the render is weak or hollow it is removed or treated first, because the waterproof layer cannot compensate for an unsound surface beneath it.

Nearby areas

The same service in nearby areas

We also offer bathroom waterproofing before tiling in Al Marbidia District, Ladhah District and Al Mirqab District, among the closest areas to Al Uwaimiriyah District.

Other services in the area

More services in Al Uwaimiriyah District

Worker applying the white insulation layer on a villa roof by the sea

Your first step in Al Uwaimiriyah District:
a call or a WhatsApp message

One number for calls and WhatsApp, and you talk to us directly.

+966 54 311 2066
Call nowWhatsApp