Abraj Al AzlContracting
Call العربية
Screeded bathroom with a continuous grey membrane up the wall base

Bathroom waterproofing before tiling in Al Tawyah

Waterproof before you tile

A continuous waterproof membrane on the bathroom floor and wet-area walls, before adhesive and tiles go on

+966 54 311 2066
The service in your area

Bathroom waterproofing before tiling in Al Tawyah

Bathroom waterproofing before tiling in Al Tawyah begins with WhatsApp photos of the floor, walls and pipe entry points. Al Tawyah is a residential district with homes and villas of various sizes and bathrooms that may be new or need renewal, each requiring a tight waterproof membrane on water-exposed surfaces.

Al Tawyah homes have varied residential designs, and bathrooms differ in layout and size. Some have integrated showers or basins, and surface variations may collect water if not addressed. The waterproof membrane must fill gaps and reach all joints and corners. Photos help us understand the bathroom layout and potential problems before choosing the waterproofing method.

  • Al Tawyah is a district in the Eastern Province, close to Al Wahah, Al Bustan and Al Dana, with residential homes and villas.
  • A bathroom with an open shower or large basin needs a strong waterproof membrane that withstands direct water splash.
What the service includes

What we do for you in Al Tawyah

  • Checking the floor, the render, the corners, the drain outlet and pipe sleeves
  • Cleaning the surface, removing loose parts and treating hairline cracks
  • Applying the membrane over the full floor and up the walls in the wet zone
  • Sealing around the drain outlet, the door threshold and all pipe sleeves
How we work

The stages of the work in Al Tawyah

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the walls, the drain outlet and the door threshold, so we can read the surface and decide the right material and treatment.

2

Prepare the surface

The floor and render are cleaned of dust and loose parts, hairline cracks, joints and corners are treated, and pipe sleeves and the drain outlet are sealed before anything else.

3

Apply the membrane

The layer covers the full floor, rises on the walls in the shower and basin area, is worked carefully into the corners and closes around the drain outlet and the door threshold. The material chosen depends on the surface and its condition.

4

Dry, then tiling begins

The membrane is left to dry and cure before tile adhesive and tiles go on, so it is not stressed or wetted from above before it is fully ready.

What sets us apart

Why Abraj Al Azl?

Corners and the drain get first attentionThe floor-to-wall corner and the area around the drain outlet are where most leaks begin, and these are treated carefully before the main layer goes on.

Start from Al Tawyah with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

We serve Al Tawyah and around itIncluding Al Wahah (near Ghizlan), Al Bustan (near Ghizlan) and Al Dana (near Ghizlan), as part of our work across the Eastern Province.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing
White insulated dome on a roof among the houses
White stepped dome on an insulated roof above a street

Customer reviews

What our customers said

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Before you book bathroom waterproofing before tiling in Al Tawyah

Must all old material be removed to waterproof a bathroom?

Yes, the surface must be clean and free of old material and dust. Any old adhesive or tile remains must be completely removed. Photos show the current condition and we will tell you what is needed before starting.

How much of the bathroom wall needs to be waterproofed?

Walls that touch water directly, such as shower walls and around the basin and sink, need waterproofing. The height depends on the bathroom design and water sources. Photos show which surfaces are exposed to water and which need protection.

Can the membrane go straight over the render?

It can, if the render is firm, clean and free of loose parts and cracks. If the render is weak or hollow it is removed or treated first, because the waterproof layer cannot compensate for an unsound surface beneath it.

What decides the cost of waterproofing a bathroom before tiling?

The floor area and how high the layer runs up the walls, the condition of the render, the number of cracks, corners and pipe sleeves, and the material that suits the surface. Send photos and rough dimensions on WhatsApp, tell us about the project, and we will explain the treatment needed.

Do you offer bathroom waterproofing before tiling in Al Tawyah?

Yes. Al Tawyah is within our service area in the Eastern Province, and we also work in Al Wahah (near Ghizlan), Al Bustan (near Ghizlan) and Al Dana (near Ghizlan). Call us or send photos of the spot on WhatsApp.

Does the surface need to be completely dry before the membrane is applied?

Sufficient dryness is needed for good adhesion. Some materials tolerate a slightly damp surface while others need it fully dry. The surface is checked before work starts, and if visible moisture is present it is left long enough before the membrane is applied. We make this clear when the job is agreed.

Nearby areas

The same service in nearby areas

We also offer bathroom waterproofing before tiling in Al Wahah (near Ghizlan), Al Bustan (near Ghizlan) and Al Dana (near Ghizlan), among the closest areas to Al Tawyah.

Other services in the area

More services in Al Tawyah

Worker applying the white insulation layer on a villa roof by the sea

Your first step in Al Tawyah:
a call or a WhatsApp message

Describe the problem and where it is in Al Tawyah, and we will tell you the right next step.

+966 54 311 2066
Call nowWhatsApp