
Bathroom waterproofing before tiling in Al Kurnaish
Bathroom waterproofing before tiling in Al Kurnaish starts with photos of the bathroom floor and walls, sent by call or on WhatsApp. The district is largely made up of houses and small residential buildings, where bathrooms are often tiled over older screeds, so the membrane must be laid before any adhesive goes down.
Al Kurnaish is mostly houses and small residential buildings, and many of its bathrooms were tiled some time ago over an older screed. In that kind of building, the floor and the lower wall around the shower are the parts most exposed to water seeping beneath tiles and joints. A continuous membrane laid before the adhesive and tiles limits that seepage, provided the old surface is sound and clean. The photos will show whether the existing screed can take the new layer or needs repair first.
- Al Kurnaish is a district in the Eastern Province lying close to Al Yarmok, Al Bandariyah and Al Bustan.
- Water that gets under bathroom tiles usually moves through joints and old screeds, which is why the membrane must run beneath the tiles.
What we do for you in Al Kurnaish
- Forming and treating the floor-to-wall corners before the main layer
- Checking the floor, the render, the corners, the drain outlet and pipe sleeves
- Applying the membrane over the full floor and up the walls in the wet zone
- Cleaning the surface, removing loose parts and treating hairline cracks
The steps of bathroom waterproofing before tiling in Al Kurnaish
Send photos of the bathroom
On WhatsApp: photos of the floor, the walls, the drain outlet and the door threshold, so we can read the surface and decide the right material and treatment.
Prepare the surface
The floor and render are cleaned of dust and loose parts, hairline cracks, joints and corners are treated, and pipe sleeves and the drain outlet are sealed before anything else.
Apply the membrane
The layer covers the full floor, rises on the walls in the shower and basin area, is worked carefully into the corners and closes around the drain outlet and the door threshold. The material chosen depends on the surface and its condition.
Dry, then tiling begins
The membrane is left to dry and cure before tile adhesive and tiles go on, so it is not stressed or wetted from above before it is fully ready.
Why Abraj Al Azl?
Sealed before it is closedOnce tiled, the membrane cannot be reached, so getting it right before tiling matters far more than any repair afterwards.
Your request from Al Kurnaish comes to usCall or WhatsApp on one number, and we answer you ourselves.
Start from Al Kurnaish with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.
Talk to us directlyCall or WhatsApp on the same number.
Some of our work

















What our customers said
أفضل شركة عزل اسطح الفوم وخزانات المياه
ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب
اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم
Real Google reviews, shown exactly as their authors wrote them.
Your questions on bathroom waterproofing before tiling in Al Kurnaish
Can an existing bathroom floor be waterproofed before new tiling?
Often yes, when the old screed is firm and clean. Loose tiles and hollow areas are removed and the surface is prepared, and the photos will tell us whether that is enough for your bathroom.
Does the waterproofing also cover the wall behind the shower?
Yes, the walls around the shower are included in the membrane where needed. Send photos of the floor and walls together, and tell us which walls get the most splashing so we can plan the work with you.
How is the corner between the floor and the wall sealed?
The corner is the most vulnerable point because it joins two surfaces at a right angle. It is filled and formed with a suitable compound before the waterproof layer is turned up over it, so the layer stays continuous rather than cracking at the bend.
Do you cover Al Kurnaish?
Yes. We serve Al Kurnaish and nearby areas such as Al Yarmok (near Al Khobar), Al Bandariyah and Al Bustan (near Al Khobar), from our base in Al Uwaymiriyah, Hofuf. Start with a call or a WhatsApp message.
What decides the cost of waterproofing a bathroom before tiling?
The floor area and how high the layer runs up the walls, the condition of the render, the number of cracks, corners and pipe sleeves, and the material that suits the surface. Send photos and rough dimensions on WhatsApp, tell us about the project, and we will explain the treatment needed.
What is the difference between a cementitious coating and a liquid membrane in a bathroom?
The cementitious coating bonds firmly to the concrete slab and the wall and suits flat regular surfaces. The liquid membrane is brushed on and follows corners and detailed areas easily. The choice between them depends on the surface and the bathroom layout, and we decide after seeing the photos.
Areas near Al Kurnaish
If the site is outside Al Kurnaish, the same service is available in Al Yarmok (near Al Khobar), Al Bandariyah and Al Bustan (near Al Khobar).
More services in Al Kurnaish



