Abraj Al AzlContracting
Call العربية
Screeded bathroom with a continuous grey membrane up the wall base

Bathroom waterproofing before tiling in Al Iskan (near Al Khobar)

Waterproof before you tile

A continuous waterproof membrane on the bathroom floor and wet-area walls, before adhesive and tiles go on

+966 54 311 2066
The service in your area

Bathroom waterproofing before tiling in Al Iskan (near Al Khobar)

Bathroom waterproofing before tiling in Al Iskan starts with a photo of the floor and wet walls, sent by call or WhatsApp. The district has villas and apartment blocks of varying ages, each with bathrooms that need a continuous waterproof membrane before tiles are laid.

Bathrooms in Al Iskan range from older ones in established villas to newer ones in modern apartment blocks. An older bathroom may have an uneven floor or cracks in the concrete, while a newer one has a prepared surface but still needs the membrane before tiling. Coastal humidity makes the waterproof membrane essential to prevent water leaking into walls and foundations. The photos show the surface condition and what repairs are needed before the membrane is applied.

  • Al Iskan is a district in the Eastern Province, close to the coast and industrial areas, with both villas and apartment blocks.
  • Bathrooms in the district face persistent coastal humidity, making a waterproof membrane essential before tiling.
What the service includes

The bathroom waterproofing before tiling work in Al Iskan (near Al Khobar)

  • Cleaning the surface, removing loose parts and treating hairline cracks
  • Forming and treating the floor-to-wall corners before the main layer
  • Leaving the membrane to dry and cure before adhesive and tiling begin
  • Applying the membrane over the full floor and up the walls in the wet zone
How we work

The stages of the work in Al Iskan (near Al Khobar)

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the walls, the drain outlet and the door threshold, so we can read the surface and decide the right material and treatment.

2

Prepare the surface

The floor and render are cleaned of dust and loose parts, hairline cracks, joints and corners are treated, and pipe sleeves and the drain outlet are sealed before anything else.

3

Apply the membrane

The layer covers the full floor, rises on the walls in the shower and basin area, is worked carefully into the corners and closes around the drain outlet and the door threshold. The material chosen depends on the surface and its condition.

4

Dry, then tiling begins

The membrane is left to dry and cure before tile adhesive and tiles go on, so it is not stressed or wetted from above before it is fully ready.

What sets us apart

Why Abraj Al Azl?

Corners and the drain get first attentionThe floor-to-wall corner and the area around the drain outlet are where most leaks begin, and these are treated carefully before the main layer goes on.

Your request from Al Iskan (near Al Khobar) comes to usCall or WhatsApp on one number, and we answer you ourselves.

We serve Al Iskan (near Al Khobar) and around itIncluding As Sahil (near Al Khobar), Sinaiyah Ath Thuqbah and Sinaiyah Al Fawaziyah, as part of our work across the Eastern Province.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing
White insulated dome on a roof among the houses
White stepped dome on an insulated roof above a street

Customer reviews

What our customers said

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

Real Google reviews, shown exactly as their authors wrote them.

Questions

Common questions on bathroom waterproofing before tiling in Al Iskan (near Al Khobar)

Do we need to repair the floor before waterproofing the bathroom in Al Iskan?

It may be necessary; it depends on the surface. If the floor is uneven or has deep cracks, it must be repaired first to prepare the surface for the membrane. Send photos of the bathroom and we will advise you on what is needed.

How long does bathroom waterproofing take before tiling can start?

The time varies depending on the bathroom size and surface condition. After the membrane is applied, it must dry sufficiently before tiling can begin, and we will advise you on the schedule after seeing the photos.

Can the membrane go straight over the render?

It can, if the render is firm, clean and free of loose parts and cracks. If the render is weak or hollow it is removed or treated first, because the waterproof layer cannot compensate for an unsound surface beneath it.

How is the corner between the floor and the wall sealed?

The corner is the most vulnerable point because it joins two surfaces at a right angle. It is filled and formed with a suitable compound before the waterproof layer is turned up over it, so the layer stays continuous rather than cracking at the bend.

What decides the cost of waterproofing a bathroom before tiling?

The floor area and how high the layer runs up the walls, the condition of the render, the number of cracks, corners and pipe sleeves, and the material that suits the surface. Send photos and rough dimensions on WhatsApp, tell us about the project, and we will explain the treatment needed.

Do you offer bathroom waterproofing before tiling in Al Iskan (near Al Khobar)?

Yes. Al Iskan (near Al Khobar) is within our service area in the Eastern Province, and we also work in As Sahil (near Al Khobar), Sinaiyah Ath Thuqbah and Sinaiyah Al Fawaziyah. Call us or send photos of the spot on WhatsApp.

Nearby areas

We also offer it in neighbouring areas

We also work near Al Iskan (near Al Khobar), in As Sahil (near Al Khobar), Sinaiyah Ath Thuqbah and Sinaiyah Al Fawaziyah.

Other services in the area

More services in Al Iskan (near Al Khobar)

Worker applying the white insulation layer on a villa roof by the sea

Your first step in Al Iskan (near Al Khobar):
a call or a WhatsApp message

Describe the problem and where it is in Al Iskan (near Al Khobar), and we will tell you the right next step.

+966 54 311 2066
Call nowWhatsApp