Abraj Al AzlContracting
Call العربية
Screeded bathroom with a continuous grey membrane up the wall base

Bathroom waterproofing before tiling in Al Hussam

Waterproof before you tile

A continuous waterproof membrane on the bathroom floor and wet-area walls, before adhesive and tiles go on

+966 54 311 2066
The service in your area

Bathroom waterproofing before tiling in Al Hussam

Bathroom waterproofing before tiling in Al Hussam begins with a WhatsApp message containing photos of the bathroom and any visible damp. The district has mixed villas and houses, many needing bathroom updates and waterproofing before new tiles.

Al Hussam has old villas and some relatively newer ones. Bathrooms in older villas may show cracks in tiles and adhesive, and water may seep into other rooms or foundations. Newer villas may need simple updating during refurbishment. A continuous waterproof membrane on floors and wet walls protects against water seepage and keeps damp out of the building. Photos of the current bathroom and damp spots show what waterproofing is needed.

  • Al Hussam is a district in the Eastern Province near As Safa, Al Khalidiyah Al Janubiyah and Al Qashlah.
  • Villas built on foundations may face rising damp from the ground, and good bathroom waterproofing reduces water and moisture entry.
What the service includes

The scope of the work in Al Hussam

  • Sealing around the drain outlet, the door threshold and all pipe sleeves
  • Applying the membrane over the full floor and up the walls in the wet zone
  • Checking the floor, the render, the corners, the drain outlet and pipe sleeves
  • Leaving the membrane to dry and cure before adhesive and tiling begin
How we work

The stages of the work in Al Hussam

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the walls, the drain outlet and the door threshold, so we can read the surface and decide the right material and treatment.

2

Prepare the surface

The floor and render are cleaned of dust and loose parts, hairline cracks, joints and corners are treated, and pipe sleeves and the drain outlet are sealed before anything else.

3

Apply the membrane

The layer covers the full floor, rises on the walls in the shower and basin area, is worked carefully into the corners and closes around the drain outlet and the door threshold. The material chosen depends on the surface and its condition.

4

Dry, then tiling begins

The membrane is left to dry and cure before tile adhesive and tiles go on, so it is not stressed or wetted from above before it is fully ready.

What sets us apart

Why Abraj Al Azl?

Sealed before it is closedOnce tiled, the membrane cannot be reached, so getting it right before tiling matters far more than any repair afterwards.

We serve Al Hussam and around itIncluding As Safa, Al Khalidiyah Al Janubiyah and Al Qashlah, as part of our work across the Eastern Province.

Your request from Al Hussam comes to usCall or WhatsApp on one number, and we answer you ourselves.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing
White insulated dome on a roof among the houses
White stepped dome on an insulated roof above a street

Customer reviews

What our customers said

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Before you book bathroom waterproofing before tiling in Al Hussam

What is the difference between waterproofing a bathroom in an old villa versus a new one in Al Hussam?

An old villa may have existing leaks or damp that must be treated before waterproofing. A new villa may need only base waterproofing. Photos show the true condition and help us plan.

Can a bathroom in a villa be waterproofed without full renovation?

That may be possible if the underlying structure is sound. We review photos first to see whether renewing waterproofing alone is enough or more work is needed.

Is Al Hussam within your service area?

Yes, Al Hussam is one of the areas we work in, as are As Safa, Al Khalidiyah Al Janubiyah and Al Qashlah. To start, call us or message us on WhatsApp.

How high up the wall does the membrane go?

It depends on the bathroom layout and where the showerhead and basin sit. In the shower area the layer rises to cover the full wet zone, and at the other walls it turns up a safe distance above the floor. We set the height after seeing the photos and the layout.

What decides the cost of waterproofing a bathroom before tiling?

The floor area and how high the layer runs up the walls, the condition of the render, the number of cracks, corners and pipe sleeves, and the material that suits the surface. Send photos and rough dimensions on WhatsApp, tell us about the project, and we will explain the treatment needed.

Can the membrane go straight over the render?

It can, if the render is firm, clean and free of loose parts and cracks. If the render is weak or hollow it is removed or treated first, because the waterproof layer cannot compensate for an unsound surface beneath it.

Nearby areas

Bathroom waterproofing before tiling near Al Hussam

We also work near Al Hussam, in As Safa, Al Khalidiyah Al Janubiyah and Al Qashlah.

Other services in the area

More services in Al Hussam

Worker applying the white insulation layer on a villa roof by the sea

Bathroom waterproofing before tiling in Al Hussam?
Call us now

One number for calls and WhatsApp, and you talk to us directly.

+966 54 311 2066
Call nowWhatsApp