Abraj Al AzlContracting
Call العربية
Screeded bathroom with a continuous grey membrane up the wall base

Bathroom waterproofing before tiling in Al Hunayy

Waterproof before you tile

A continuous waterproof membrane on the bathroom floor and wet-area walls, before adhesive and tiles go on

+966 54 311 2066
The service in your area

Bathroom waterproofing before tiling in Al Hunayy

We provide bathroom waterproofing before tiling in Al Hunayy, with a continuous waterproof membrane laid on the floor and wet-area walls before adhesive and tiles go down. We start from photos of the bathroom, sent by call or WhatsApp.

Al Hunayy is a village whose homes are mostly standalone houses and villas, with bathrooms of widely differing age. Older bathrooms often show cracks at corners and at the floor-to-wall joint, where water can seep beneath the tiles. Newer bathrooms handle moisture differently, so the photos show which case applies before any method is chosen.

  • Al Hunayy is a village in the Al-Ahsa governorate of the Eastern Province, close to Al Qusaybi, Udhailiyah and Al Uthmaniyah.
  • Joints between floor and wall crack first, so they are usually treated before any other lining work.
What the service includes

The bathroom waterproofing before tiling work in Al Hunayy

  • Forming and treating the floor-to-wall corners before the main layer
  • Cleaning the surface, removing loose parts and treating hairline cracks
  • Checking the floor, the render, the corners, the drain outlet and pipe sleeves
  • Leaving the membrane to dry and cure before adhesive and tiling begin
How we work

The steps of bathroom waterproofing before tiling in Al Hunayy

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the walls, the drain outlet and the door threshold, so we can read the surface and decide the right material and treatment.

2

Prepare the surface

The floor and render are cleaned of dust and loose parts, hairline cracks, joints and corners are treated, and pipe sleeves and the drain outlet are sealed before anything else.

3

Apply the membrane

The layer covers the full floor, rises on the walls in the shower and basin area, is worked carefully into the corners and closes around the drain outlet and the door threshold. The material chosen depends on the surface and its condition.

4

Dry, then tiling begins

The membrane is left to dry and cure before tile adhesive and tiles go on, so it is not stressed or wetted from above before it is fully ready.

What sets us apart

Why Abraj Al Azl?

Corners and the drain get first attentionThe floor-to-wall corner and the area around the drain outlet are where most leaks begin, and these are treated carefully before the main layer goes on.

Your request from Al Hunayy comes to usCall or WhatsApp on one number, and we answer you ourselves.

Start from Al Hunayy with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing
White insulated dome on a roof among the houses
White stepped dome on an insulated roof above a street

Customer reviews

What our customers said

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

Real Google reviews, shown exactly as their authors wrote them.

Questions

Your questions on bathroom waterproofing before tiling in Al Hunayy

Can a bathroom in Al Hunayy be waterproofed without removing the old tiles?

That depends on the condition of the tiles and the adhesive beneath them, which the photos reveal. If the tiles are firm and sound it may be possible, but hollow or cracked tiles usually need removing to ensure a proper seal.

What should photos of a bathroom in Al Hunayy show?

Send clear photos of the floor, wall corners and the area around the shower or basin, noting any stains or cracks. The clearer the photos, the easier it is to decide the next step.

What is the difference between a cementitious coating and a liquid membrane in a bathroom?

The cementitious coating bonds firmly to the concrete slab and the wall and suits flat regular surfaces. The liquid membrane is brushed on and follows corners and detailed areas easily. The choice between them depends on the surface and the bathroom layout, and we decide after seeing the photos.

What decides the cost of waterproofing a bathroom before tiling?

The floor area and how high the layer runs up the walls, the condition of the render, the number of cracks, corners and pipe sleeves, and the material that suits the surface. Send photos and rough dimensions on WhatsApp, tell us about the project, and we will explain the treatment needed.

How is the corner between the floor and the wall sealed?

The corner is the most vulnerable point because it joins two surfaces at a right angle. It is filled and formed with a suitable compound before the waterproof layer is turned up over it, so the layer stays continuous rather than cracking at the bend.

Is Al Hunayy within your service area?

Yes, Al Hunayy is one of the areas we work in, as are Al Qusaybi, Udhailiyah and Al Uthmaniyah. To start, call us or message us on WhatsApp.

Nearby areas

The same service in nearby areas

If the site is outside Al Hunayy, the same service is available in Al Qusaybi, Udhailiyah and Al Uthmaniyah.

Other services in the area

More services in Al Hunayy

Worker applying the white insulation layer on a villa roof by the sea

We start with you in Al Hunayy
with one call

One number for calls and WhatsApp, and you talk to us directly.

+966 54 311 2066
Call nowWhatsApp