Abraj Al AzlContracting
Call العربية
Screeded bathroom with a continuous grey membrane up the wall base

Bathroom waterproofing before tiling in Al Hamra (near Dammam)

Waterproof before you tile

A continuous waterproof membrane on the bathroom floor and wet-area walls, before adhesive and tiles go on

+966 54 311 2066
The service in your area

Bathroom waterproofing before tiling in Al Hamra (near Dammam)

We offer bathroom waterproofing before tiling in Al Hamra, Al-Ahsa, applying a leak-resistant membrane to the floor and wet-area walls before adhesive and tiles. Send bathroom photos by call or WhatsApp.

Al Hamra in Al-Ahsa has family houses of modest size, mostly single or two storeys, and its bathrooms vary in age. Small bathrooms are often tiled without a membrane beneath, so water gradually reaches the structure. The photos show the state of the floor and the walls around the shower to establish what is needed.

  • Al Hamra is a residential district in Al-Ahsa in the Eastern Province, close to Az Zuhur, Al Jawharah and As Salam.
  • Small bathrooms with open showers get spray across the walls more than others, so the walls around the shower need protection.
What the service includes

The main items of bathroom waterproofing before tiling in Al Hamra (near Dammam)

  • Forming and treating the floor-to-wall corners before the main layer
  • Sealing around the drain outlet, the door threshold and all pipe sleeves
  • Cleaning the surface, removing loose parts and treating hairline cracks
  • Leaving the membrane to dry and cure before adhesive and tiling begin
How we work

The stages of the work in Al Hamra (near Dammam)

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the walls, the drain outlet and the door threshold, so we can read the surface and decide the right material and treatment.

2

Prepare the surface

The floor and render are cleaned of dust and loose parts, hairline cracks, joints and corners are treated, and pipe sleeves and the drain outlet are sealed before anything else.

3

Apply the membrane

The layer covers the full floor, rises on the walls in the shower and basin area, is worked carefully into the corners and closes around the drain outlet and the door threshold. The material chosen depends on the surface and its condition.

4

Dry, then tiling begins

The membrane is left to dry and cure before tile adhesive and tiles go on, so it is not stressed or wetted from above before it is fully ready.

What sets us apart

Why Abraj Al Azl?

Sealed before it is closedOnce tiled, the membrane cannot be reached, so getting it right before tiling matters far more than any repair afterwards.

Al Hamra (near Dammam) is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

We serve Al Hamra (near Dammam) and around itIncluding Az Zuhur (near Dammam), Al Jawharah (near Sayhat) and As Salam (near Dammam), as part of our work across the Eastern Province.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing
White insulated dome on a roof among the houses
White stepped dome on an insulated roof above a street

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

Real Google reviews, shown exactly as their authors wrote them.

Questions

Before you book bathroom waterproofing before tiling in Al Hamra (near Dammam)

Does a small bathroom with an open shower in Al Hamra need waterproofing?

Usually yes, since spray reaches the walls and floor repeatedly. The photos identify which areas need waterproofing before tiling.

Do you waterproof bathrooms in mid-sized homes in Al Hamra?

Yes, we serve Al Hamra in Al-Ahsa. Send photos of the bathroom and its floor, and we will explain in detail what is needed before tiling.

Can the membrane go straight over the render?

It can, if the render is firm, clean and free of loose parts and cracks. If the render is weak or hollow it is removed or treated first, because the waterproof layer cannot compensate for an unsound surface beneath it.

Do you cover Al Hamra (near Dammam)?

Yes. We serve Al Hamra (near Dammam) and nearby areas such as Az Zuhur (near Dammam), Al Jawharah (near Sayhat) and As Salam (near Dammam), from our base in Al Uwaymiriyah, Hofuf. Start with a call or a WhatsApp message.

How is the corner between the floor and the wall sealed?

The corner is the most vulnerable point because it joins two surfaces at a right angle. It is filled and formed with a suitable compound before the waterproof layer is turned up over it, so the layer stays continuous rather than cracking at the bend.

What decides the cost of waterproofing a bathroom before tiling?

The floor area and how high the layer runs up the walls, the condition of the render, the number of cracks, corners and pipe sleeves, and the material that suits the surface. Send photos and rough dimensions on WhatsApp, tell us about the project, and we will explain the treatment needed.

Nearby areas

The same service in nearby areas

Nearby areas we also cover: Az Zuhur (near Dammam), Al Jawharah (near Sayhat) and As Salam (near Dammam).

Other services in the area

More services in Al Hamra (near Dammam)

Worker applying the white insulation layer on a villa roof by the sea

In Al Hamra (near Dammam) and need bathroom waterproofing before tiling?
Send us photos of the spot

Call us, or send photos of the spot and a short description of the problem on WhatsApp.

+966 54 311 2066
Call nowWhatsApp