Abraj Al AzlContracting
Call العربية
Screeded bathroom with a continuous grey membrane up the wall base

Bathroom waterproofing before tiling in Al Fanar

Waterproof before you tile

A continuous waterproof membrane on the bathroom floor and wet-area walls, before adhesive and tiles go on

+966 54 311 2066
The service in your area

Bathroom waterproofing before tiling in Al Fanar

Bathroom waterproofing before tiling in Al Fanar starts with photos sent via WhatsApp showing the bathroom's dimensions and the condition of its walls and floor. The district has modern villas and apartment buildings, with waterproofing needs varying by the building's age and current moisture level.

Al Fanar features a mix of modern villas and apartment buildings alongside some institutional facilities. Modern villa bathrooms usually have clean, new surfaces, making it straightforward to apply the membrane directly before tiling. Older buildings may show damp marks or cracks needing initial treatment. Hot weather and sensitive humidity make a continuous waterproof membrane essential to ensure water does not seep through walls and floor. Clear photos allow us to identify the best waterproofing method for your bathroom.

  • Al Fanar is a district in the Eastern Province, close to King Faisal University, An Nawras and As Saif, with villas, apartment buildings and some institutional facilities.
  • A new bathroom in a modern villa needs a waterproof membrane on a clean surface before any tiles are laid.
What the service includes

What we do for you in Al Fanar

  • Leaving the membrane to dry and cure before adhesive and tiling begin
  • Applying the membrane over the full floor and up the walls in the wet zone
  • Cleaning the surface, removing loose parts and treating hairline cracks
  • Sealing around the drain outlet, the door threshold and all pipe sleeves
How we work

This is how we work in Al Fanar

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the walls, the drain outlet and the door threshold, so we can read the surface and decide the right material and treatment.

2

Prepare the surface

The floor and render are cleaned of dust and loose parts, hairline cracks, joints and corners are treated, and pipe sleeves and the drain outlet are sealed before anything else.

3

Apply the membrane

The layer covers the full floor, rises on the walls in the shower and basin area, is worked carefully into the corners and closes around the drain outlet and the door threshold. The material chosen depends on the surface and its condition.

4

Dry, then tiling begins

The membrane is left to dry and cure before tile adhesive and tiles go on, so it is not stressed or wetted from above before it is fully ready.

What sets us apart

Why Abraj Al Azl?

Sealed before it is closedOnce tiled, the membrane cannot be reached, so getting it right before tiling matters far more than any repair afterwards.

Your request from Al Fanar comes to usCall or WhatsApp on one number, and we answer you ourselves.

Start from Al Fanar with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing
White insulated dome on a roof among the houses
White stepped dome on an insulated roof above a street

Customer reviews

What our customers said

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Questions about bathroom waterproofing before tiling in Al Fanar

Does waterproofing differ between a villa bathroom and a building bathroom in Al Fanar?

It may differ by age and condition. A modern villa bathroom is usually simpler, but an older building bathroom may need initial damp treatment. Photos show the differences.

What if old tiles are still in the bathroom?

Old tiles must be removed and surfaces thoroughly cleaned before the waterproof membrane is applied. This ensures strong adhesion and effective seepage protection.

Can the membrane go straight over the render?

It can, if the render is firm, clean and free of loose parts and cracks. If the render is weak or hollow it is removed or treated first, because the waterproof layer cannot compensate for an unsound surface beneath it.

What decides the cost of waterproofing a bathroom before tiling?

The floor area and how high the layer runs up the walls, the condition of the render, the number of cracks, corners and pipe sleeves, and the material that suits the surface. Send photos and rough dimensions on WhatsApp, tell us about the project, and we will explain the treatment needed.

How do I request bathroom waterproofing before tiling in Al Fanar?

Call us, or send clear photos of the spot and its location in Al Fanar on WhatsApp, and we will work out the next step with you.

How is the corner between the floor and the wall sealed?

The corner is the most vulnerable point because it joins two surfaces at a right angle. It is filled and formed with a suitable compound before the waterproof layer is turned up over it, so the layer stays continuous rather than cracking at the bend.

Nearby areas

Bathroom waterproofing before tiling near Al Fanar

We also work near Al Fanar, in King Faisal University, An Nawras and As Saif.

Other services in the area

More services in Al Fanar

Worker applying the white insulation layer on a villa roof by the sea

Your first step in Al Fanar:
a call or a WhatsApp message

One number for calls and WhatsApp, and you talk to us directly.

+966 54 311 2066
Call nowWhatsApp