Abraj Al AzlContracting
Call العربية
Screeded bathroom with a continuous grey membrane up the wall base

Bathroom waterproofing before tiling in Al Aujam

Waterproof before you tile

A continuous waterproof membrane on the bathroom floor and wet-area walls, before adhesive and tiles go on

+966 54 311 2066
The service in your area

Bathroom waterproofing before tiling in Al Aujam

Bathroom waterproofing before tiling in Al Aujam starts with photos you send by call or WhatsApp. We apply a continuous waterproof membrane to the bathroom floor and wet-area walls before tiles are laid, to protect against seepage and dampness in the floors and walls below.

Al Aujam is a residential district with villas of varying sizes and apartment blocks, where bathrooms require reliable waterproofing before final construction. Bathrooms differ by building age and interior layout, and a new bathroom may have simple or complex flooring. Water seeping from a non-waterproofed bathroom causes dampness in adjoining walls and floors and decay of concrete structures. Clear photos of the bare floor and wet walls help us choose the right membrane and method.

  • Al Aujam is a district in the Eastern Province, close to Al Awjam, Al Badi and At Talal, with villas and small apartment blocks.
  • A rebuilt bathroom needs full waterproofing on the new floor before any tiling or adhesive is applied.
What the service includes

The bathroom waterproofing before tiling work in Al Aujam

  • Leaving the membrane to dry and cure before adhesive and tiling begin
  • Forming and treating the floor-to-wall corners before the main layer
  • Applying the membrane over the full floor and up the walls in the wet zone
  • Cleaning the surface, removing loose parts and treating hairline cracks
How we work

The stages of the work in Al Aujam

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the walls, the drain outlet and the door threshold, so we can read the surface and decide the right material and treatment.

2

Prepare the surface

The floor and render are cleaned of dust and loose parts, hairline cracks, joints and corners are treated, and pipe sleeves and the drain outlet are sealed before anything else.

3

Apply the membrane

The layer covers the full floor, rises on the walls in the shower and basin area, is worked carefully into the corners and closes around the drain outlet and the door threshold. The material chosen depends on the surface and its condition.

4

Dry, then tiling begins

The membrane is left to dry and cure before tile adhesive and tiles go on, so it is not stressed or wetted from above before it is fully ready.

What sets us apart

Why Abraj Al Azl?

Corners and the drain get first attentionThe floor-to-wall corner and the area around the drain outlet are where most leaks begin, and these are treated carefully before the main layer goes on.

We serve Al Aujam and around itIncluding Al Awjam, Al Badi (near Al Awjam) and At Talal (near Al Awjam), as part of our work across the Eastern Province.

Al Aujam is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing
White insulated dome on a roof among the houses
White stepped dome on an insulated roof above a street

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

Real Google reviews, shown exactly as their authors wrote them.

Questions

Your questions on bathroom waterproofing before tiling in Al Aujam

Can a bathroom in an Al Aujam villa be waterproofed without removing the old tiles?

No, the old tiles and grout must be removed to reach the base surface. After cleaning the floor and walls we apply the new membrane. If the old tiles remain, they may trap moisture behind them and waterproofing will not be achieved.

How many coats of waterproof membrane does an Al Aujam bathroom need?

It depends on the surface condition and water load. The photos show the issue and area, and we choose the method based on what we see. Some bathrooms need one thick coat, others may need reinforcement at corners and joints.

Does the surface need to be completely dry before the membrane is applied?

Sufficient dryness is needed for good adhesion. Some materials tolerate a slightly damp surface while others need it fully dry. The surface is checked before work starts, and if visible moisture is present it is left long enough before the membrane is applied. We make this clear when the job is agreed.

What is the difference between a cementitious coating and a liquid membrane in a bathroom?

The cementitious coating bonds firmly to the concrete slab and the wall and suits flat regular surfaces. The liquid membrane is brushed on and follows corners and detailed areas easily. The choice between them depends on the surface and the bathroom layout, and we decide after seeing the photos.

Do you offer bathroom waterproofing before tiling in Al Aujam?

Yes. Al Aujam is within our service area in the Eastern Province, and we also work in Al Awjam, Al Badi (near Al Awjam) and At Talal (near Al Awjam). Call us or send photos of the spot on WhatsApp.

Can the membrane go straight over the render?

It can, if the render is firm, clean and free of loose parts and cracks. If the render is weak or hollow it is removed or treated first, because the waterproof layer cannot compensate for an unsound surface beneath it.

Nearby areas

Areas near Al Aujam

Nearby areas we also cover: Al Awjam, Al Badi (near Al Awjam) and At Talal (near Al Awjam).

Other services in the area

More services in Al Aujam

Worker applying the white insulation layer on a villa roof by the sea

Your first step in Al Aujam:
a call or a WhatsApp message

Call us, or send photos of the spot and a short description of the problem on WhatsApp.

+966 54 311 2066
Call nowWhatsApp