Abraj Al AzlContracting
Call العربية
Screeded bathroom with a continuous grey membrane up the wall base

Bathroom waterproofing before tiling in Abqaiq

Waterproof before you tile

A continuous waterproof membrane on the bathroom floor and wet-area walls, before adhesive and tiles go on

+966 54 311 2066
The service in your area

Bathroom waterproofing before tiling in Abqaiq

Bathroom waterproofing in Abqaiq begins with a WhatsApp message containing photos of the bathroom and its surroundings. Abqaiq has various residential and institutional buildings, each bathroom needing careful assessment and appropriate waterproofing before tiling.

Abqaiq has diverse buildings including residential villas, apartment units and institutional structures, each type having different waterproofing characteristics. A villa may contain multiple bathrooms with varied designs, while a small residential unit requires precision in limited spaces. Older buildings may have old pipes and previous seepage that must be treated. Photos show the current condition, space and any past problems, helping us choose the waterproof membrane suited to you.

  • Abqaiq is a town in the Eastern Province, near Al Madinah, Al Andalus and the Airport, with diverse residential and institutional buildings.
  • Bathrooms in small residential units need precise waterproofing reaching all corners and joints without wasting material.
What the service includes

The bathroom waterproofing before tiling work in Abqaiq

  • Checking the floor, the render, the corners, the drain outlet and pipe sleeves
  • Forming and treating the floor-to-wall corners before the main layer
  • Cleaning the surface, removing loose parts and treating hairline cracks
  • Leaving the membrane to dry and cure before adhesive and tiling begin
How we work

The steps of bathroom waterproofing before tiling in Abqaiq

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the walls, the drain outlet and the door threshold, so we can read the surface and decide the right material and treatment.

2

Prepare the surface

The floor and render are cleaned of dust and loose parts, hairline cracks, joints and corners are treated, and pipe sleeves and the drain outlet are sealed before anything else.

3

Apply the membrane

The layer covers the full floor, rises on the walls in the shower and basin area, is worked carefully into the corners and closes around the drain outlet and the door threshold. The material chosen depends on the surface and its condition.

4

Dry, then tiling begins

The membrane is left to dry and cure before tile adhesive and tiles go on, so it is not stressed or wetted from above before it is fully ready.

What sets us apart

Why Abraj Al Azl?

Corners and the drain get first attentionThe floor-to-wall corner and the area around the drain outlet are where most leaks begin, and these are treated carefully before the main layer goes on.

Abqaiq is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

Your request from Abqaiq comes to usCall or WhatsApp on one number, and we answer you ourselves.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing
White insulated dome on a roof among the houses
White stepped dome on an insulated roof above a street

Customer reviews

What our customers said

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

Real Google reviews, shown exactly as their authors wrote them.

Questions

Questions about bathroom waterproofing before tiling in Abqaiq

Can a bathroom in a small residential unit be waterproofed without disturbing neighbours?

Yes, we work efficiently and clean up afterwards. We start by assessing the bathroom from photos, and when we begin actual work, we handle noise and dust carefully. Tell us your neighbours' rest times so we can schedule appropriately.

What if the bathroom is on the ground floor with external moisture underneath?

Any external moisture must be dealt with first if present, then we apply the waterproof membrane from inside. Photos will show if external moisture exists, and we will advise you on the steps needed before waterproofing begins.

What is the difference between a cementitious coating and a liquid membrane in a bathroom?

The cementitious coating bonds firmly to the concrete slab and the wall and suits flat regular surfaces. The liquid membrane is brushed on and follows corners and detailed areas easily. The choice between them depends on the surface and the bathroom layout, and we decide after seeing the photos.

How is the corner between the floor and the wall sealed?

The corner is the most vulnerable point because it joins two surfaces at a right angle. It is filled and formed with a suitable compound before the waterproof layer is turned up over it, so the layer stays continuous rather than cracking at the bend.

Do you cover Abqaiq?

Yes. We serve Abqaiq and nearby areas such as Al Madinah, Al Andalus (near Abqaiq) and Airport (near Abqaiq), from our base in Al Uwaymiriyah, Hofuf. Start with a call or a WhatsApp message.

How high up the wall does the membrane go?

It depends on the bathroom layout and where the showerhead and basin sit. In the shower area the layer rises to cover the full wet zone, and at the other walls it turns up a safe distance above the floor. We set the height after seeing the photos and the layout.

Nearby areas

The same service in nearby areas

If the site is outside Abqaiq, the same service is available in Al Madinah, Al Andalus (near Abqaiq) and Airport (near Abqaiq).

Other services in the area

More services in Abqaiq

Worker applying the white insulation layer on a villa roof by the sea

Bathroom waterproofing before tiling in Abqaiq?
Call us now

One number for calls and WhatsApp, and you talk to us directly.

+966 54 311 2066
Call nowWhatsApp