Abraj Al AzlContracting
Call العربية
Bathroom floor and wall base brushed with a grey waterproof coat before tiling

Bathroom waterproofing in Ash Shweikah

Sealed before the leak shows

Waterproofing bathroom and washroom floors, wall bases and drain openings, at the build stage or after tiling

+966 54 311 2066
The service in your area

Bathroom waterproofing in Ash Shweikah

Bathroom waterproofing in Ash Shweikah starts with clear photos of the floor, walls and drain openings sent via WhatsApp or phone. The district has houses and villas, many of whose bathrooms need protection from water leaks and damp.

Ash Shweikah consists of houses and villas of varying sizes and ages. An older bathroom may need damp, cracks and leaks around the floor and walls treated. A newer one benefits from waterproofing early in the build process before tiling. Each case depends on the base building material, the location of drain openings and the bathroom's age. Your photos help us assess the situation and choose the right protection method.

  • Ash Shweikah is a district in the Eastern Province, located near Al Masudiyah, Kuwaikib and Al Wadiah.
  • An older bathroom may need its tiles removed and accumulated moisture underneath treated before the floor and walls are waterproofed again.
What the service includes

What the service covers in Ash Shweikah

  • Leaving the layer to cure before any finish goes over it
  • Cleaning the surface and treating hairline cracks and pipe entries
  • Closing the drain opening ring and the bathroom door threshold
  • Checking the floor, wall bases, corners and the drain opening
How we work

The steps of bathroom waterproofing in Ash Shweikah

1

Send photos of the bathroom

On WhatsApp: photos of the floor, wall bases, the drain opening, pipe entries and any visible damp, so we can read the stage and choose the right treatment.

2

Inspect and choose the treatment

The surface is checked for the condition of the render, any cracks, pipe openings and the drain. From what is found, the waterproofing material and the stage are decided.

3

Prepare the surface and treat cracks

The surface is cleaned and dried, cracks are treated, pipe openings and the drain ring are closed, and the surface is left ready to take the waterproof layer.

4

Apply the layer and let it cure

The layer covers the floor, rises at the wall bases, the corners and the door threshold, and is left to cure fully before any finish goes over it.

What sets us apart

Why Abraj Al Azl?

Protects the rooms and ceiling belowA continuous layer stops water moving to the ceiling below the bathroom or to the wall of the room next to it.

Ash Shweikah is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

Your request from Ash Shweikah comes to usCall or WhatsApp on one number, and we answer you ourselves.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

White insulated dome on a roof among the houses
White stepped dome on an insulated roof above a street
Concrete roof exposed to the sun with cracks sealed in white lines
Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Before you book bathroom waterproofing in Ash Shweikah

What is the difference between waterproofing a new and an old bathroom in Ash Shweikah?

A new bathroom is waterproofed just before tiling, so the protection is complete from the start. An old one may need its tiles removed and damp treated first, then waterproofing applied. Photos show which stage you are at and what is needed.

Can a bathroom in Ash Shweikah be waterproofed without breaking walls?

Yes, in most cases. We focus on treating cracks, openings and joints from the surface and applying protection. If deeper work is needed, the photos will show it and we will discuss it with you first.

What decides the cost of waterproofing a bathroom?

The floor and wall area to be waterproofed, the stage of the work (before or after tiling), how many cracks and pipe entries there are, whether the tiles must come up, and how accessible the site is. Send photos and rough dimensions on WhatsApp and we will suggest the right treatment.

What should I send you from Ash Shweikah?

Send clear photos of the spot and a short description of the problem on WhatsApp, mention that you are in Ash Shweikah, and we will work out the next step with you.

How often should a bathroom be waterproofed in a building's life?

There is no fixed interval. The layer is affected by how well it was first applied, by movement in the building, by shocks to the tiles and by changes to the plumbing. The main signal is damp patches appearing or render crumbling at the wall base, not a date. At the first sign, send us a photo.

Why does damp appear on the ceiling of the room below the bathroom?

Water gets in through the drain opening, pipe entries or the corner between the floor and the wall, then travels horizontally inside the slab until it appears somewhere else. The stain on the ceiling can be far from the actual entry point. Photos from above and below help us trace the source.

Nearby areas

We also offer it in neighbouring areas

Nearby areas we also cover: Al Masudiyah, Kuwaikib and Al Wadiah.

Other services in the area

More services in Ash Shweikah

Two workers on the roof insulating around an AC unit

Tell us about your site in Ash Shweikah
and we will plan the next step with you

Call us, or send photos of the spot and a short description of the problem on WhatsApp.

+966 54 311 2066
Call nowWhatsApp