Abraj Al AzlContracting
Call العربية
Bathroom floor and wall base brushed with a grey waterproof coat before tiling

Bathroom waterproofing in Al Yamamah

Sealed before the leak shows

Waterproofing bathroom and washroom floors, wall bases and drain openings, at the build stage or after tiling

+966 54 311 2066
The service in your area

Bathroom waterproofing in Al Yamamah

Bathroom waterproofing in Al Yamamah begins with WhatsApp photos of the floor, walls and drains. The district has houses and villas of varying ages, and their bathrooms need protection before tiling or after to stop water seeping into the layers below.

Bathrooms in Al Yamamah vary by building age and internal layout. Older houses may have uneven floors or loose drains, letting water seep into the foundation easily. In modern villas installation is simpler before tiling. Photos show whether the building is new or old, and whether the floor is already damp or the protection is just precaution.

  • Al Yamamah is a district in the Eastern Province, close to Ad Dirah, Az Zomorod and Al Nakhil, with varied houses and villas.
  • Drains in older bathrooms may be made of materials that do not tolerate heavy loads of water and humidity.
What the service includes

What we do for you in Al Yamamah

  • Closing the drain opening ring and the bathroom door threshold
  • Cleaning the surface and treating hairline cracks and pipe entries
  • Checking the floor, wall bases, corners and the drain opening
  • Treating washroom floors and wet surfaces with the material suited to each condition
How we work

This is how we work in Al Yamamah

1

Send photos of the bathroom

On WhatsApp: photos of the floor, wall bases, the drain opening, pipe entries and any visible damp, so we can read the stage and choose the right treatment.

2

Inspect and choose the treatment

The surface is checked for the condition of the render, any cracks, pipe openings and the drain. From what is found, the waterproofing material and the stage are decided.

3

Prepare the surface and treat cracks

The surface is cleaned and dried, cracks are treated, pipe openings and the drain ring are closed, and the surface is left ready to take the waterproof layer.

4

Apply the layer and let it cure

The layer covers the floor, rises at the wall bases, the corners and the door threshold, and is left to cure fully before any finish goes over it.

What sets us apart

Why Abraj Al Azl?

Protects the concrete and the reinforcementWater that reaches the reinforcement starts rust from inside, and repairing that later costs far more than waterproofing when it should be done.

Your request from Al Yamamah comes to usCall or WhatsApp on one number, and we answer you ourselves.

We serve Al Yamamah and around itIncluding Ad Dirah, Az Zomorod and Al Nakhil (near Tarout), as part of our work across the Eastern Province.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

White insulated dome on a roof among the houses
White stepped dome on an insulated roof above a street
Concrete roof exposed to the sun with cracks sealed in white lines
Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit

Customer reviews

What our customers said

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

What customers ask in Al Yamamah

Can an old bathroom in Al Yamamah be waterproofed after the house is built?

Yes, but it depends on the condition of the structure and floor. If the floor shows damp or cracks, the photos will reveal it and we will tell you whether waterproofing alone is enough or other repairs are needed.

What is the difference between waterproofing before and after tiling?

Before tiling, waterproofing is easier and more thorough, protecting the foundation and walls alike. After tiling it is only at drains and corners. Send photos of your bathroom now so we can guide you on which suits your case.

Can the bathroom floor be waterproofed without lifting the tiles?

In some cases yes: if joints and cracks are limited and the tile surface is sound, sealing the joints or applying a clear waterproof coat over the tiles can work. But if the layer under the tiles is missing or the leak is advanced, lifting them is the right treatment. Send photos and we will advise.

What is the difference between waterproofing before and after tiling?

Before tiling, the layer goes onto a clean open surface and covers everything fully, which is the best outcome. After tiling, the situation is assessed: if grout joints and cracks are the problem, treatment from above may work; if the original layer is absent or damaged, the tiles may need to come up. Photos help us decide which fits.

What materials are used in bathroom waterproofing?

Common materials include flexible cementitious coating applied in layers on damp-tolerant surfaces, liquid membrane applied by brush or roller and shaped by the surface, and bitumen rolls fixed to the floor and wall bases. The choice of material depends on the stage of the work and the nature of the surface.

What should I send you from Al Yamamah?

Send clear photos of the spot and a short description of the problem on WhatsApp, mention that you are in Al Yamamah, and we will work out the next step with you.

Nearby areas

The same service in nearby areas

We also offer bathroom waterproofing in Ad Dirah, Az Zomorod and Al Nakhil (near Tarout), among the closest areas to Al Yamamah.

Other services in the area

More services in Al Yamamah

Two workers on the roof insulating around an AC unit

Tell us about your site in Al Yamamah
and we will plan the next step with you

Call us, or send photos of the spot and a short description of the problem on WhatsApp.

+966 54 311 2066
Call nowWhatsApp