Abraj Al AzlContracting
Call العربية
Bathroom floor and wall base brushed with a grey waterproof coat before tiling

Bathroom waterproofing in Al Qulayyib

Sealed before the leak shows

Waterproofing bathroom and washroom floors, wall bases and drain openings, at the build stage or after tiling

+966 54 311 2066
The service in your area

Bathroom waterproofing in Al Qulayyib

Bathroom waterproofing in Al Qulayyib begins with WhatsApp photos of the floor, drains and lower walls. Al Qulayyib is a small village with simple houses and villas, whose bathrooms need effective protection from damp and seepage.

Al Qulayyib consists of small scattered houses and villas on wide plots, with medium-sized, simply designed bathrooms. Some are under construction and need preventive waterproofing before tiling; others are established and may show damp marks or slow seepage. Groundwater and humidity may affect floors, especially in ground-level bathrooms. Photos show the condition of floors, walls and drains to determine the type of waterproofing needed.

  • Al Qulayyib is a small village in the Eastern Province, near Al Uyaynah, Al Wannan and Rizhan, comprising scattered houses and villas.
  • In small inland villages, groundwater may affect ground-level bathrooms, making lower waterproofing essential to prevent rising damp.
What the service includes

What the service covers in Al Qulayyib

  • Cleaning the surface and treating hairline cracks and pipe entries
  • Leaving the layer to cure before any finish goes over it
  • Applying a continuous waterproof layer rising at walls and corners
  • Checking the floor, wall bases, corners and the drain opening
How we work

This is how we work in Al Qulayyib

1

Send photos of the bathroom

On WhatsApp: photos of the floor, wall bases, the drain opening, pipe entries and any visible damp, so we can read the stage and choose the right treatment.

2

Inspect and choose the treatment

The surface is checked for the condition of the render, any cracks, pipe openings and the drain. From what is found, the waterproofing material and the stage are decided.

3

Prepare the surface and treat cracks

The surface is cleaned and dried, cracks are treated, pipe openings and the drain ring are closed, and the surface is left ready to take the waterproof layer.

4

Apply the layer and let it cure

The layer covers the floor, rises at the wall bases, the corners and the door threshold, and is left to cure fully before any finish goes over it.

What sets us apart

Why Abraj Al Azl?

Protects the concrete and the reinforcementWater that reaches the reinforcement starts rust from inside, and repairing that later costs far more than waterproofing when it should be done.

Your request from Al Qulayyib comes to usCall or WhatsApp on one number, and we answer you ourselves.

We serve Al Qulayyib and around itIncluding Al Uyaynah, Al Wannan and Rizhan, as part of our work across the Eastern Province.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

White insulated dome on a roof among the houses
White stepped dome on an insulated roof above a street
Concrete roof exposed to the sun with cracks sealed in white lines
Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit

Customer reviews

What our customers said

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

Real Google reviews, shown exactly as their authors wrote them.

Questions

Questions about bathroom waterproofing in Al Qulayyib

Does groundwater affect bathrooms in Al Qulayyib and how do we deal with it?

Groundwater can cause rising damp from the floor and lower walls. We treat this with strong basal waterproofing and proper drainage; more details emerge from your photos and description of the damp condition.

Can a ground-level bathroom in a small village be waterproofed without external drainage?

Drainage depends on water conditions around the house and bathroom location. Photos and details about location and humidity determine whether drainage is necessary or optional to ensure adequate protection.

Do you offer bathroom waterproofing in Al Qulayyib?

Yes. Al Qulayyib is within our service area in the Eastern Province, and we also work in Al Uyaynah, Al Wannan and Rizhan. Call us or send photos of the spot on WhatsApp.

What materials are used in bathroom waterproofing?

Common materials include flexible cementitious coating applied in layers on damp-tolerant surfaces, liquid membrane applied by brush or roller and shaped by the surface, and bitumen rolls fixed to the floor and wall bases. The choice of material depends on the stage of the work and the nature of the surface.

Is kitchen waterproofing different from bathroom waterproofing?

The principle is the same: a continuous layer under the tiles around wet areas and wall bases. But the risk points in a kitchen differ: around the sink, the dishwasher connection and the floor drain, and the need is greater in kitchens above living space. Each service covers its own details separately.

What decides the cost of waterproofing a bathroom?

The floor and wall area to be waterproofed, the stage of the work (before or after tiling), how many cracks and pipe entries there are, whether the tiles must come up, and how accessible the site is. Send photos and rough dimensions on WhatsApp and we will suggest the right treatment.

Nearby areas

Areas near Al Qulayyib

Nearby areas we also cover: Al Uyaynah, Al Wannan and Rizhan.

Other services in the area

More services in Al Qulayyib

Two workers on the roof insulating around an AC unit

We start with you in Al Qulayyib
with one call

One number for calls and WhatsApp, and you talk to us directly.

+966 54 311 2066
Call nowWhatsApp