Abraj Al AzlContracting
Call العربية
Bathroom floor and wall base brushed with a grey waterproof coat before tiling

Bathroom waterproofing in Al Muruj (near Al Khunn)

Sealed before the leak shows

Waterproofing bathroom and washroom floors, wall bases and drain openings, at the build stage or after tiling

+966 54 311 2066
The service in your area

Bathroom waterproofing in Al Muruj (near Al Khunn)

Bathroom waterproofing in Al Muruj begins with WhatsApp or call photos of the floor, walls, outlets and visible dampness. The district is a mixed residential area with villas and apartment blocks, each unit's bathroom potentially needing separate assessment.

Villas and apartment blocks in Al Muruj vary in age and material, so some bathrooms are old and others new. An older bathroom may show cracks and leaks at corners and joints, while a newer one may need its original waterproofing reinforced. Humid air and heavy water use weaken any bathroom's waterproofing over time. Reviewing photos shows the condition of tiles, grout and the extent of dampness, helping us choose the right approach for each case.

  • Al Muruj is a residential district in the Eastern Province, near Yabrin, Ar Rabie and Al Yasmin.
  • A bathroom showing dampness on walls and floor is gradually losing its waterproofing and needs to be resealed.
What the service includes

The scope of the work in Al Muruj (near Al Khunn)

  • Checking the floor, wall bases, corners and the drain opening
  • Closing the drain opening ring and the bathroom door threshold
  • Cleaning the surface and treating hairline cracks and pipe entries
  • Treating washroom floors and wet surfaces with the material suited to each condition
How we work

From first contact to the finished job in Al Muruj (near Al Khunn)

1

Send photos of the bathroom

On WhatsApp: photos of the floor, wall bases, the drain opening, pipe entries and any visible damp, so we can read the stage and choose the right treatment.

2

Inspect and choose the treatment

The surface is checked for the condition of the render, any cracks, pipe openings and the drain. From what is found, the waterproofing material and the stage are decided.

3

Prepare the surface and treat cracks

The surface is cleaned and dried, cracks are treated, pipe openings and the drain ring are closed, and the surface is left ready to take the waterproof layer.

4

Apply the layer and let it cure

The layer covers the floor, rises at the wall bases, the corners and the door threshold, and is left to cure fully before any finish goes over it.

What sets us apart

Why Abraj Al Azl?

Protects the concrete and the reinforcementWater that reaches the reinforcement starts rust from inside, and repairing that later costs far more than waterproofing when it should be done.

Your request from Al Muruj (near Al Khunn) comes to usCall or WhatsApp on one number, and we answer you ourselves.

We serve Al Muruj (near Al Khunn) and around itIncluding Yabrin (near Al Khunn), Ar Rabie (near Al Khunn) and Al Yasmin (near Al Khunn), as part of our work across the Eastern Province.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

White insulated dome on a roof among the houses
White stepped dome on an insulated roof above a street
Concrete roof exposed to the sun with cracks sealed in white lines
Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit

Customer reviews

What our customers said

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

Real Google reviews, shown exactly as their authors wrote them.

Questions

Common questions on bathroom waterproofing in Al Muruj (near Al Khunn)

Does dampness in walls of a room next to a bathroom mean the bathroom is not the only source?

The leak could be from the bathroom itself or from nearby water pipes. Photos help us locate the dampness precisely and see how far it has spread, clarifying the source and the right fix.

Can a bathroom be waterproofed while leaving cracked tiles in place?

That depends on how severe the cracking is and where it is. Photos show whether the tiles allow waterproofing beneath them or whether they need relaying. We will help you make the best choice for your bathroom.

Is Al Muruj (near Al Khunn) within your service area?

Yes, Al Muruj (near Al Khunn) is one of the areas we work in, as are Yabrin (near Al Khunn), Ar Rabie (near Al Khunn) and Al Yasmin (near Al Khunn). To start, call us or message us on WhatsApp.

What materials are used in bathroom waterproofing?

Common materials include flexible cementitious coating applied in layers on damp-tolerant surfaces, liquid membrane applied by brush or roller and shaped by the surface, and bitumen rolls fixed to the floor and wall bases. The choice of material depends on the stage of the work and the nature of the surface.

How often should a bathroom be waterproofed in a building's life?

There is no fixed interval. The layer is affected by how well it was first applied, by movement in the building, by shocks to the tiles and by changes to the plumbing. The main signal is damp patches appearing or render crumbling at the wall base, not a date. At the first sign, send us a photo.

What is the difference between waterproofing before and after tiling?

Before tiling, the layer goes onto a clean open surface and covers everything fully, which is the best outcome. After tiling, the situation is assessed: if grout joints and cracks are the problem, treatment from above may work; if the original layer is absent or damaged, the tiles may need to come up. Photos help us decide which fits.

Nearby areas

The same service in nearby areas

Nearby areas we also cover: Yabrin (near Al Khunn), Ar Rabie (near Al Khunn) and Al Yasmin (near Al Khunn).

Other services in the area

More services in Al Muruj (near Al Khunn)

Two workers on the roof insulating around an AC unit

In Al Muruj (near Al Khunn) and need bathroom waterproofing?
Send us photos of the spot

Describe the problem and where it is in Al Muruj (near Al Khunn), and we will tell you the right next step.

+966 54 311 2066
Call nowWhatsApp